Product remanufacturing and disposal: A numerical comparison of alternative control strategies
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- van der Laan, Erwin & Dekker, Rommert & Salomon, Marc & Ridder, Ad, 1996. "An (s, Q) inventory model with remanufacturing and disposal," International Journal of Production Economics, Elsevier, vol. 46(1), pages 339-350, December.
- Cho, Danny I. & Parlar, Mahmut, 1991. "A survey of maintenance models for multi-unit systems," European Journal of Operational Research, Elsevier, vol. 51(1), pages 1-23, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Wang, Ziping & Yao, Dong-Qing & Huang, Peiqing, 2007. "A new location-inventory policy with reverse logistics applied to B2C e-markets of China," International Journal of Production Economics, Elsevier, vol. 107(2), pages 350-363, June.
- Andiç, Esen & Yurt, Öznur & Baltacıoğlu, Tunçdan, 2012. "Green supply chains: Efforts and potential applications for the Turkish market," Resources, Conservation & Recycling, Elsevier, vol. 58(C), pages 50-68.
- Fleischmann, Moritz & Kuik, Roelof, 2003. "On optimal inventory control with independent stochastic item returns," European Journal of Operational Research, Elsevier, vol. 151(1), pages 25-37, November.
- Hsueh, Che-Fu, 2011. "An inventory control model with consideration of remanufacturing and product life cycle," International Journal of Production Economics, Elsevier, vol. 133(2), pages 645-652, October.
- Pokharel, Shaligram & Mutha, Akshay, 2009. "Perspectives in reverse logistics: A review," Resources, Conservation & Recycling, Elsevier, vol. 53(4), pages 175-182.
- Kim, Eungab & Saghafian, Soroush & Van Oyen, Mark P., 2013. "Joint control of production, remanufacturing, and disposal activities in a hybrid manufacturing–remanufacturing system," European Journal of Operational Research, Elsevier, vol. 231(2), pages 337-348.
- Mahadevan, B. & Pyke, David F. & Fleischmann, Moritz, 2003.
"Periodic review, push inventory policies for remanufacturing,"
European Journal of Operational Research, Elsevier, vol. 151(3), pages 536-551, December.
- Mahadevan, B. & Pyke, D.F. & Fleischmann, M., 2002. "Periodic Review, Push Inventory Policies for Remanufacturing," ERIM Report Series Research in Management ERS-2002-35-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Z P Bayındır & N Erkip & R Güllü, 2005. "Assessing the benefits of remanufacturing option under one-way substitution," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 286-296, March.
- Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
- Li, Jianzhi & González, Miguel & Zhu, Yun, 2009. "A hybrid simulation optimization method for production planning of dedicated remanufacturing," International Journal of Production Economics, Elsevier, vol. 117(2), pages 286-301, February.
- Sebnem Ahiska, S. & King, Russell E., 2010. "Inventory optimization in a one product recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 11-19, March.
- van der Laan, Erwin & Salomon, Marc, 1997. "Production planning and inventory control with remanufacturing and disposal," European Journal of Operational Research, Elsevier, vol. 102(2), pages 264-278, October.
- Daniel, V. & Guide, R. Jr., 1997. "Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 53(1), pages 101-116, November.
- Elnaz Kanani Kuchesfehani & Elena M. Parilina & Georges Zaccour, 2023. "Revenue and cost sharing contract in a dynamic closed-loop supply chain with uncertain parameters," Annals of Operations Research, Springer, vol. 322(2), pages 851-877, March.
- Vlachos, Dimitrios & Dekker, Rommert, 2003.
"Return handling options and order quantities for single period products,"
European Journal of Operational Research, Elsevier, vol. 151(1), pages 38-52, November.
- Vlachos, D. & Dekker, R., 2000. "Return handling options and order quantities for single period products," Econometric Institute Research Papers EI 2000-29/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Ahiska, S. Sebnem & King, Russell E., 2010. "Life cycle inventory policy characterizations for a single-product recoverable system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 51-61, March.
- Bao, Xing & Tang, Ou & Ji, Jianhua, 2008. "Applying the minimum relative entropy method for bimodal distribution in a remanufacturing system," International Journal of Production Economics, Elsevier, vol. 113(2), pages 969-979, June.
- Kaya, Onur, 2010. "Incentive and production decisions for remanufacturing operations," European Journal of Operational Research, Elsevier, vol. 201(2), pages 442-453, March.
- Nenes, George & Panagiotidou, Sofia & Dekker, Rommert, 2010. "Inventory control policies for inspection and remanufacturing of returns: A case study," International Journal of Production Economics, Elsevier, vol. 125(2), pages 300-312, June.
- Inderfurth, Karl & van der Laan, Erwin, 2001. "Leadtime effects and policy improvement for stochastic inventory control with remanufacturing," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 381-390, May.
- Poles, Roberto, 2013. "System Dynamics modelling of a production and inventory system for remanufacturing to evaluate system improvement strategies," International Journal of Production Economics, Elsevier, vol. 144(1), pages 189-199.
- Duong, Quang Huy & Zhou, Li & Meng, Meng & Nguyen, Truong Van & Ieromonachou, Petros & Nguyen, Duy Tiep, 2022. "Understanding product returns: A systematic literature review using machine learning and bibliometric analysis," International Journal of Production Economics, Elsevier, vol. 243(C).
- V. Daniel R. Guide & Vaidyanathan Jayaraman & Rajesh Srivastava & W. C. Benton, 2000. "Supply-Chain Management for Recoverable Manufacturing Systems," Interfaces, INFORMS, vol. 30(3), pages 125-142, June.
- Bayindir, Z.P. & Erkip, N. & Gullu, R., 2003. "Assessing the benefits of remanufacturing option under one-way substitution and capacity constraint," Econometric Institute Research Papers EI 2003-19, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Linton, Jonathan D. & Yeomans, J. Scott & Yoogalingam, Reena, 2005. "Recovery and reclamation of durable goods: a study of television CRTs," Resources, Conservation & Recycling, Elsevier, vol. 43(4), pages 337-352.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
- Gou, Qinglong & Liang, Liang & Huang, Zhimin & Xu, Chuanyong, 2008. "A joint inventory model for an open-loop reverse supply chain," International Journal of Production Economics, Elsevier, vol. 116(1), pages 28-42, November.
- Erwin van der Laan & Marc Salomon & Rommert Dekker & Luk Van Wassenhove, 1999. "Inventory Control in Hybrid Systems with Remanufacturing," Management Science, INFORMS, vol. 45(5), pages 733-747, May.
- Sy, Charlle, 2017. "A policy development model for reducing bullwhips in hybrid production-distribution systems," International Journal of Production Economics, Elsevier, vol. 190(C), pages 67-79.
- Xiang, Yisha, 2013. "Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach," European Journal of Operational Research, Elsevier, vol. 229(2), pages 382-390.
- Coria, V.H. & Maximov, S. & Rivas-Dávalos, F. & Melchor, C.L. & Guardado, J.L., 2015. "Analytical method for optimization of maintenance policy based on available system failure data," Reliability Engineering and System Safety, Elsevier, vol. 135(C), pages 55-63.
- Bruns, Peter, 2002. "Optimal maintenance strategies for systems with partial repair options and without assuming bounded costs," European Journal of Operational Research, Elsevier, vol. 139(1), pages 146-165, May.
- Seyed Habib A. Rahmati & Abbas Ahmadi & Kannan Govindan, 2018. "A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach," Annals of Operations Research, Springer, vol. 269(1), pages 583-621, October.
- Vineyard, Michael & Amoako-Gyampah, Kwasi & Meredith, Jack R., 1999. "Failure rate distributions for flexible manufacturing systems: An empirical study," European Journal of Operational Research, Elsevier, vol. 116(1), pages 139-155, July.
- de Brito, Marisa P. & Dekker, Rommert, 2003.
"Modelling product returns in inventory control--exploring the validity of general assumptions,"
International Journal of Production Economics, Elsevier, vol. 81(1), pages 225-241, January.
- de Brito, M.P. & Dekker, R., 2001. "Modelling product returns in inventory control - exploring the validity or general assumptions," Econometric Institute Research Papers EI 2001-27, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Wang, Wenbin & Banjevic, Dragan & Pecht, Michael, 2010. "A multi-component and multi-failure mode inspection model based on the delay time concept," Reliability Engineering and System Safety, Elsevier, vol. 95(8), pages 912-920.
- Zhu, Mixin & Zhou, Xiaojun, 2023. "Hybrid opportunistic maintenance policy for serial-parallel multi-station manufacturing systems with spare part overlap," Reliability Engineering and System Safety, Elsevier, vol. 236(C).
- Thomas Bittar & Pierre Carpentier & Jean-Philippe Chancelier & Jérôme Lonchampt, 2022. "A decomposition method by interaction prediction for the optimization of maintenance scheduling," Annals of Operations Research, Springer, vol. 316(1), pages 229-267, September.
- Tsiliyannis, Christos Aristeides, 2015. "Sustainability by cyclic manufacturing: Assessment of resource preservation under uncertain growth and returns," Resources, Conservation & Recycling, Elsevier, vol. 103(C), pages 155-170.
- Richter, Knut & Dobos, Imre, 1999. "Analysis of the EOQ repair and waste disposal problem with integer setup numbers," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 463-467, March.
- Salari, Nooshin & Makis, Viliam, 2017. "Comparison of two maintenance policies for a multi-unit system considering production and demand rates," International Journal of Production Economics, Elsevier, vol. 193(C), pages 381-391.
- Lu, Biao & Zhou, Xiaojun, 2017. "Opportunistic preventive maintenance scheduling for serial-parallel multistage manufacturing systems with multiple streams of deterioration," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 116-127.
- Bayindir, Z. Pelin & Erkip, Nesim & Gullu, Refik, 2003. "A model to evaluate inventory costs in a remanufacturing environment," International Journal of Production Economics, Elsevier, vol. 81(1), pages 597-607, January.
- van der Laan, Erwin & Salomon, Marc, 1997. "Production planning and inventory control with remanufacturing and disposal," European Journal of Operational Research, Elsevier, vol. 102(2), pages 264-278, October.
- Hoskins, R. P. & Brint, A. T. & Strbac, G., 1999. "A structured approach to Asset Management within the electricity industry," Utilities Policy, Elsevier, vol. 7(4), pages 221-232, February.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:45:y:1996:i:1-3:p:489-498. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.