IDEAS home Printed from https://ideas.repec.org/a/eee/jomega/v40y2012i6p774-781.html
   My bibliography  Save this article

Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown

Author

Listed:
  • Jeang, Angus

Abstract

The purpose of this study is to combine production-inventory management with process-quality design for determining production lot size and process parameters under the possibility of process deterioration and breakdown. The total cost of such an integrated model includes: the combined setup cost (production setup and process resetting), the costs of quality loss, tolerance and mean costs for processes established, a penalty cost for process breakdown and carrying costs for cumulated inventory. The quadratic quality loss function is introduced to assess quality loss within the system. Decision variables include the initial setting (process mean) and process tolerance for process parameters determination, and production lot size for production-inventory management. The cycle time for production-inventory management is assumed to be the same as the resetting cycle for the new process-quality system. The contribution of this study lies in its development of an integrated model that enables process parameters, production lot size, and cycle time to be determined concurrently for quality and economic considerations, and at an earlier time in the process design and production management stage. An example is presented to demonstrate the proposed model.

Suggested Citation

  • Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
  • Handle: RePEc:eee:jomega:v:40:y:2012:i:6:p:774-781
    DOI: 10.1016/j.omega.2011.12.005
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0305048311001770
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.omega.2011.12.005?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
    2. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    3. Yang, Suh-Jenq & Yang, Dar-Li, 2010. "Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities," Omega, Elsevier, vol. 38(6), pages 528-533, December.
    4. Jeang, Angus, 1998. "Reliable tool replacement policy for quality and cost," European Journal of Operational Research, Elsevier, vol. 108(2), pages 334-344, July.
    5. Hyun Kim, Chang & Hong, Yushin, 1999. "An optimal production run length in deteriorating production processes," International Journal of Production Economics, Elsevier, vol. 58(2), pages 183-189, January.
    6. Dohi, Tadashi & Okamura, Hiroyuki & Osaki, Shunji, 2001. "Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 147-155, December.
    7. Chang, Hung-Chi & Ho, Chia-Huei, 2010. "Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering"," Omega, Elsevier, vol. 38(3-4), pages 233-237, June.
    8. Kuhn, Heinrich, 1997. "A dynamic lot sizing model with exponential machine breakdowns," European Journal of Operational Research, Elsevier, vol. 100(3), pages 514-536, August.
    9. Pentico, David W. & Drake, Matthew J. & Toews, Carl, 2011. "The EPQ with partial backordering and phase-dependent backordering rate," Omega, Elsevier, vol. 39(5), pages 574-577, October.
    10. Ganeshan, Ram & Kulkarni, Shailesh & Boone, Tonya, 2001. "Production economics and process quality: A Taguchi perspective," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 343-350, May.
    11. Kamran Moinzadeh & Prabhu Aggarwal, 1997. "Analysis of a Production/Inventory System Subject to Random Disruptions," Management Science, INFORMS, vol. 43(11), pages 1577-1588, November.
    12. M A Rahim & M Ben-Daya, 2001. "Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(12), pages 1370-1378, December.
    13. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    14. Hsieh, Tsu-Pang & Dye, Chung-Yuan, 2012. "A note on "The EPQ with partial backordering and phase-dependent backordering rate"," Omega, Elsevier, vol. 40(1), pages 131-133, January.
    15. Berthaut, F. & Gharbi, A. & Dhouib, K., 2011. "Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell," Omega, Elsevier, vol. 39(6), pages 642-654, December.
    16. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2009. "Production lot sizing with process deterioration and machine breakdown under inspection schedule," Omega, Elsevier, vol. 37(2), pages 257-271, April.
    17. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Batching with Machine Breakdowns and Safety Stocks," Operations Research, INFORMS, vol. 40(5), pages 959-971, October.
    18. Wee, Hui-Ming & Wang, Wan-Tsu, 2012. "A supplement to the EPQ with partial backordering and phase-dependent backordering rate," Omega, Elsevier, vol. 40(3), pages 264-266.
    19. Chen, Chung-Ho & Lai, Min-Tsai, 2007. "Economic manufacturing quantity, optimum process mean, and economic specification limits setting under the rectifying inspection plan," European Journal of Operational Research, Elsevier, vol. 183(1), pages 336-344, November.
    20. Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Janssen, Larissa & Claus, Thorsten & Sauer, Jürgen, 2016. "Literature review of deteriorating inventory models by key topics from 2012 to 2015," International Journal of Production Economics, Elsevier, vol. 182(C), pages 86-112.
    2. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    3. Assid, M. & Gharbi, A. & Dhouib, K., 2015. "Joint production and subcontracting planning of unreliable multi-facility multi-product production systems," Omega, Elsevier, vol. 50(C), pages 54-69.
    4. Koca, Esra & Yaman, Hande & Selim Aktürk, M., 2015. "Stochastic lot sizing problem with controllable processing times," Omega, Elsevier, vol. 53(C), pages 1-10.
    5. Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint," Omega, Elsevier, vol. 61(C), pages 110-126.
    6. Sandeep Kumar & Bhupesh Kumar Lad, 2017. "Integrated production and maintenance planning for parallel machine system considering cost of rejection," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(7), pages 834-846, July.
    7. Muhammad Omair & Misbah Ullah & Baishakhi Ganguly & Sahar Noor & Shahid Maqsood & Biswajit Sarkar, 2019. "The Quantitative Analysis of Workers’ Stress Due to Working Environment in the Production System of the Automobile Part Manufacturing Industry," Mathematics, MDPI, vol. 7(7), pages 1-18, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
    2. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    3. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2009. "Production lot sizing with process deterioration and machine breakdown under inspection schedule," Omega, Elsevier, vol. 37(2), pages 257-271, April.
    4. Chiu, Singa Wang & Chou, Chung-Li & Wu, Wen-Kuei, 2013. "Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown," Economic Modelling, Elsevier, vol. 35(C), pages 330-337.
    5. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
    6. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    7. Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
    8. Teng, Jinn-Tsair & Min, Jie & Pan, Qinhua, 2012. "Economic order quantity model with trade credit financing for non-decreasing demand," Omega, Elsevier, vol. 40(3), pages 328-335.
    9. Giri, B. C. & Dohi, T., 2004. "Optimal lot sizing for an unreliable production system based on net present value approach," International Journal of Production Economics, Elsevier, vol. 92(2), pages 157-167, November.
    10. Giri, B. C. & Yun, W. Y. & Dohi, T., 2005. "Optimal design of unreliable production-inventory systems with variable production rate," European Journal of Operational Research, Elsevier, vol. 162(2), pages 372-386, April.
    11. San-José, Luis A. & Sicilia, Joaquín & García-Laguna, Juan, 2014. "Optimal lot size for a production–inventory system with partial backlogging and mixture of dispatching policies," International Journal of Production Economics, Elsevier, vol. 155(C), pages 194-203.
    12. Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
    13. Giri, B. C. & Yun, W. Y., 2005. "Optimal lot sizing for an unreliable production system under partial backlogging and at most two failures in a production cycle," International Journal of Production Economics, Elsevier, vol. 95(2), pages 229-243, February.
    14. Wee, Hui Ming & Widyadana, Gede Agus, 2013. "A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule," Omega, Elsevier, vol. 41(6), pages 941-954.
    15. Mohebbi, E., 2008. "A note on a production control model for a facility with limited storage capacity in a random environment," European Journal of Operational Research, Elsevier, vol. 190(2), pages 562-570, October.
    16. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    17. Hossein Salehi & Ata Allah Taleizadeh & Reza Tavakkoli-Moghaddam, 2016. "An EOQ model with random disruption and partial backordering," International Journal of Production Research, Taylor & Francis Journals, vol. 54(9), pages 2600-2609, May.
    18. Berthaut, F. & Gharbi, A. & Dhouib, K., 2011. "Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell," Omega, Elsevier, vol. 39(6), pages 642-654, December.
    19. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    20. K.Y. Kung & Y.D. Huang & H.M. Wee & Y. Daryanto, 2019. "Production-Inventory System for Deteriorating Items with Machine Breakdown, Inspection, and Partial Backordering," Mathematics, MDPI, vol. 7(7), pages 1-26, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:40:y:2012:i:6:p:774-781. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.