IDEAS home Printed from https://ideas.repec.org/a/taf/tsysxx/v45y2014i12p2539-2551.html
   My bibliography  Save this article

Stochastic manufacturing system with process deterioration and machine breakdown

Author

Listed:
  • Om Prakash
  • A.R. Roy
  • A. Goswami

Abstract

This paper presents a realistic manufacturing inventory model with process deterioration and machine breakdown. In economic manufacturing quantity model, process usually starts with ‘in-control’ state and produces items of good quality. After some random point of time, process may deteriorate and shift to ‘out-of-control’ state due to occurrence of assignable cause. From that point, process produces some percentage of non-conforming items. Further process deterioration after machine shift may result in machine breakdown at any random time during the production period. If machine breakdown occurs during the production period, then corrective (emergency) repair is performed immediately otherwise preventive (regular) repair is performed at the end of production period. The proposed model is formulated assuming that the time required for production facility shifting from ‘in-control’ state to ‘out-of-control’ state, time when machine breaks down, corrective and preventive repairing time and demand of items follows probability distribution. We have derived analytically the optimal production time which minimises the total expected production cost annually for machine breakdown and no machine breakdown cases. The solution procedure is illustrated with the help of numerical examples for different probability distributions. Sensitivity of the optimal solution with respect to different parameters are also analysed.

Suggested Citation

  • Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
  • Handle: RePEc:taf:tsysxx:v:45:y:2014:i:12:p:2539-2551
    DOI: 10.1080/00207721.2013.773469
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207721.2013.773469
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207721.2013.773469?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
    2. T. Bielecki & P. R. Kumar, 1988. "Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems," Operations Research, INFORMS, vol. 36(4), pages 532-541, August.
    3. Dohi, Tadashi & Okamura, Hiroyuki & Osaki, Shunji, 2001. "Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 147-155, December.
    4. Lo, Sh-Tyan & Wee, Hui-Ming & Huang, Wen-Chang, 2007. "An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation," International Journal of Production Economics, Elsevier, vol. 106(1), pages 248-260, March.
    5. Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
    6. M. Berg & M. J. M. Posner & H. Zhao, 1994. "Production-Inventory Systems with Unreliable Machines," Operations Research, INFORMS, vol. 42(1), pages 111-118, February.
    7. M. Hariga & M. Ben‐Daya, 1998. "Note: The economic manufacturing lot‐sizing problem with imperfect production processes: Bounds and optimal solutions," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(4), pages 423-433, June.
    8. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
    9. Gede Agus Widyadana & Hui Ming Wee, 2012. "An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 43(10), pages 1870-1882.
    10. Yeh, Ruey Huei & Ho, Wen-Tsung & Tseng, Sheng-Tsaing, 2000. "Optimal production run length for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 120(3), pages 575-582, February.
    11. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    12. Lo, Sh-Tyan & Wee, Hui-Ming & Huang, Wen-Chang, 2007. "An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation," International Journal of Production Economics, Elsevier, vol. 106(2), pages 493-505, April.
    13. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
    14. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    15. Berthaut, F. & Gharbi, A. & Dhouib, K., 2011. "Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell," Omega, Elsevier, vol. 39(6), pages 642-654, December.
    16. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Batching with Machine Breakdowns and Safety Stocks," Operations Research, INFORMS, vol. 40(5), pages 959-971, October.
    17. Viliam Makis, 1998. "Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(2), pages 165-186, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
    2. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    3. Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
    4. Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
    5. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    6. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
    7. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
    8. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    9. Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
    10. Giri, B. C. & Dohi, T., 2004. "Optimal lot sizing for an unreliable production system based on net present value approach," International Journal of Production Economics, Elsevier, vol. 92(2), pages 157-167, November.
    11. Sher, Mikhail M. & Kim, Seung-Lae & Banerjee, Avijit & Paz, Michael T., 2018. "A supply chain coordination mechanism for common items subject to failure in the electronics, defense, and medical industries," International Journal of Production Economics, Elsevier, vol. 203(C), pages 164-173.
    12. Chiu, Singa Wang & Liang, Gang-Ming & Chiu, Yuan-Shyi Peter & Chiu, Tiffany, 2019. "Production planning incorporating issues of reliability and backlogging with service level constraint," Operations Research Perspectives, Elsevier, vol. 6(C).
    13. Giri, B. C. & Yun, W. Y. & Dohi, T., 2005. "Optimal design of unreliable production-inventory systems with variable production rate," European Journal of Operational Research, Elsevier, vol. 162(2), pages 372-386, April.
    14. Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
    15. Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
    16. Ki Ling Cheung & Warren H. Hausman, 1997. "Joint determination of preventive maintenance and safety stocks in an unreliable production environment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(3), pages 257-272, April.
    17. El-Ferik, Sami, 2008. "Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy," European Journal of Operational Research, Elsevier, vol. 186(1), pages 150-163, April.
    18. K.Y. Kung & Y.D. Huang & H.M. Wee & Y. Daryanto, 2019. "Production-Inventory System for Deteriorating Items with Machine Breakdown, Inspection, and Partial Backordering," Mathematics, MDPI, vol. 7(7), pages 1-26, July.
    19. Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
    20. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2009. "Production lot sizing with process deterioration and machine breakdown under inspection schedule," Omega, Elsevier, vol. 37(2), pages 257-271, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tsysxx:v:45:y:2014:i:12:p:2539-2551. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TSYS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.