IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v120y2000i3p575-582.html
   My bibliography  Save this article

Optimal production run length for products sold with warranty

Author

Listed:
  • Yeh, Ruey Huei
  • Ho, Wen-Tsung
  • Tseng, Sheng-Tsaing

Abstract

No abstract is available for this item.

Suggested Citation

  • Yeh, Ruey Huei & Ho, Wen-Tsung & Tseng, Sheng-Tsaing, 2000. "Optimal production run length for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 120(3), pages 575-582, February.
  • Handle: RePEc:eee:ejores:v:120:y:2000:i:3:p:575-582
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00004-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Djamaludin, I. & Murthy, D. N. P. & Wilson, R. J., 1994. "Quality control through lot sizing for items sold with warranty," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 97-107, January.
    2. Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
    3. Murthy, D. N. P. & Blischke, W. R., 1992. "Product warranty management -- II: An integrated framework for study," European Journal of Operational Research, Elsevier, vol. 62(3), pages 261-281, November.
    4. Hau L. Lee, 1992. "Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework," Management Science, INFORMS, vol. 38(9), pages 1314-1328, September.
    5. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    6. Murthy, D. N. P. & Blischke, W. R., 1992. "Product warranty management -- III: A review of mathematical models," European Journal of Operational Research, Elsevier, vol. 63(1), pages 1-34, November.
    7. Blischke, W. R. & Murthy, D. N. P., 1992. "Product warranty management -- I: A taxonomy for warranty policies," European Journal of Operational Research, Elsevier, vol. 62(2), pages 127-148, October.
    8. Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ateka Banu & Shyamal Kumar Mondal, 2018. "An integrated inventory model with warranty dependent credit period under two policies of a manufacturer," OPSEARCH, Springer;Operational Research Society of India, vol. 55(3), pages 677-702, November.
    2. K.Y. Kung & Y.D. Huang & H.M. Wee & Y. Daryanto, 2019. "Production-Inventory System for Deteriorating Items with Machine Breakdown, Inspection, and Partial Backordering," Mathematics, MDPI, vol. 7(7), pages 1-26, July.
    3. Shang, Lijun & Liu, Baoliang & Qiu, Qingan & Yang, Li, 2023. "Three-dimensional warranty and post-warranty maintenance of products with monitored mission cycles," Reliability Engineering and System Safety, Elsevier, vol. 239(C).
    4. K-L Hou, 2005. "Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 346-350, March.
    5. Lijun Shang & Baoliang Liu & Kaiye Gao & Li Yang, 2023. "Random Warranty and Replacement Models Customizing from the Perspective of Heterogeneity," Mathematics, MDPI, vol. 11(15), pages 1-22, July.
    6. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    7. Hsieh, Chung-Chi & Lee, Zong-Zhe, 2005. "Joint determination of production run length and number of standbys in a deteriorating production process," European Journal of Operational Research, Elsevier, vol. 162(2), pages 359-371, April.
    8. Ruey Yeh & Wen Chang & Hui-Chiung Lo, 2010. "Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method," Annals of Operations Research, Springer, vol. 181(1), pages 171-183, December.
    9. Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
    10. Lijun Shang & Guojun Shang & Yongjun Du & Qingan Qiu & Li Yang & Qinglai Dong, 2022. "Post-Warranty Replacement Models for the Product under a Hybrid Warranty," Mathematics, MDPI, vol. 10(10), pages 1-18, May.
    11. Abu Hashan Md Mashud & Hui-Ming Wee & Chiao-Ven Huang & Jei-Zheng Wu, 2020. "Optimal Replenishment Policy for Deteriorating Products in a Newsboy Problem with Multiple Just-in-Time Deliveries," Mathematics, MDPI, vol. 8(11), pages 1-18, November.
    12. Giri, B.C. & Dohi, T., 2007. "Inspection scheduling for imperfect production processes under free repair warranty contract," European Journal of Operational Research, Elsevier, vol. 183(1), pages 238-252, November.
    13. Prasanta Kumar Ghosh & Amalesh Kumar Manna & Jayanta Kumar Dey & Samarjit Kar, 2023. "Optimal production run in an imperfect production process with maintenance under warranty and product insurance," OPSEARCH, Springer;Operational Research Society of India, vol. 60(2), pages 720-752, June.
    14. Chen, Cheng-Kang & Lo, Chih-Chung & Weng, Tzu-Chun, 2017. "Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period," European Journal of Operational Research, Elsevier, vol. 259(2), pages 401-412.
    15. Hu, Fei & Zong, Qun, 2009. "Optimal production run time for a deteriorating production system under an extended inspection policy," European Journal of Operational Research, Elsevier, vol. 196(3), pages 979-986, August.
    16. Murthy, D. N. P. & Djamaludin, I., 2002. "New product warranty: A literature review," International Journal of Production Economics, Elsevier, vol. 79(3), pages 231-260, October.
    17. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Yeh, Ruey Huei & Chen, Tzu-Hui, 2006. "Optimal lot size and inspection policy for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 174(2), pages 766-776, October.
    2. Izzet Sahin & Hakan Polatoglu, 1995. "Distributions of manufacturer's and user's replacement costs under warranty," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(8), pages 1233-1250, December.
    3. K-L Hou, 2005. "Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 346-350, March.
    4. Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
    5. Liu, Yiliu & Liu, Zixian & Wang, Yukun, 2013. "Customized warranty offering for configurable products," Reliability Engineering and System Safety, Elsevier, vol. 118(C), pages 1-7.
    6. B. C. Giri & T Chakraborty, 2007. "Optimal production, maintenance, and warranty strategies for item sold with rebate combination warranty," Journal of Risk and Reliability, , vol. 221(4), pages 257-264, December.
    7. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    8. Mitra, Amitava, 2021. "Warranty parameters for extended two-dimensional warranties incorporating consumer preferences," European Journal of Operational Research, Elsevier, vol. 291(2), pages 525-535.
    9. Nan Zhang & Mitra Fouladirad & Anne Barros, 2018. "Warranty analysis of a two-component system with type I stochastic dependence," Journal of Risk and Reliability, , vol. 232(3), pages 274-283, June.
    10. Chien, Yu-Hung & Chen, Jih-An, 2008. "Optimal spare ordering policy under a rebate warranty," European Journal of Operational Research, Elsevier, vol. 186(2), pages 708-719, April.
    11. Wang, Chih-Hsiung & Sheu, Shey-Heui, 2003. "Optimal lot sizing for products sold under free-repair warranty," European Journal of Operational Research, Elsevier, vol. 149(1), pages 131-141, August.
    12. Mohamed Noomane Darghouth & Anis Chelbi & Daoud Ait-kadi, 2017. "Investigating reliability improvement of second-hand production equipment considering warranty and preventive maintenance strategies," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4643-4661, August.
    13. Yeh, Ruey Huei & Lo, Hui-Chiung, 2001. "Optimal preventive-maintenance warranty policy for repairable products," European Journal of Operational Research, Elsevier, vol. 134(1), pages 59-69, October.
    14. Lei, Yong & Liu, Qian & Shum, Stephen, 2017. "Warranty pricing with consumer learning," European Journal of Operational Research, Elsevier, vol. 263(2), pages 596-610.
    15. Chen, Cheng-Kang & Lo, Chih-Chung & Weng, Tzu-Chun, 2017. "Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period," European Journal of Operational Research, Elsevier, vol. 259(2), pages 401-412.
    16. Stephen M. Gilbert & Hena M Bar, 1999. "The value of observing the condition of a deteriorating machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(7), pages 790-808, October.
    17. Sezgin Çağlar Aksezer, 2023. "Sustainability via Extended Warranty Contracts: Design for a Consumer Electronics Retailer," Sustainability, MDPI, vol. 16(1), pages 1-11, December.
    18. Wang, Yukun & Liu, Zixian & Liu, Yiliu, 2015. "Optimal preventive maintenance strategy for repairable items under two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 142(C), pages 326-333.
    19. Wang, Chih-Hsiung, 2009. "Determining the optimal probing lot size for the wafer probe operation in semiconductor manufacturing," European Journal of Operational Research, Elsevier, vol. 197(1), pages 126-133, August.
    20. Kirkizoğlu, Zeynep & Karaer, Özgen, 2022. "After-sales service and warranty decisions of a durable goods manufacturer," Omega, Elsevier, vol. 113(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:120:y:2000:i:3:p:575-582. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.