Optimal production, maintenance, and warranty strategies for item sold with rebate combination warranty
Author
Abstract
Suggested Citation
DOI: 10.1243/1748006XJRR54
Download full text from publisher
References listed on IDEAS
- Theodore S. Glickman & Paul D. Berger, 1976. "Optimal Price and Protection Period Decisions for a Product Under Warranty," Management Science, INFORMS, vol. 22(12), pages 1381-1390, August.
- Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
- V. Padmanabhan & Ram C. Rao, 1993. "Warranty Policy and Extended Service Contracts: Theory and an Application to Automobiles," Marketing Science, INFORMS, vol. 12(3), pages 230-247.
- M. Hariga & M. Ben‐Daya, 1998. "Note: The economic manufacturing lot‐sizing problem with imperfect production processes: Bounds and optimal solutions," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(4), pages 423-433, June.
- R. L. A. Kirch & M. Klein, 1974. "Surveillance Schedules for Medical Examinations," Management Science, INFORMS, vol. 20(10), pages 1403-1409, June.
- Joseph B. Keller, 1974. "Optimum Checking Schedules for Systems Subject to Random Failure," Management Science, INFORMS, vol. 21(3), pages 256-260, November.
- Djamaludin, I. & Murthy, D. N. P. & Wilson, R. J., 1994. "Quality control through lot sizing for items sold with warranty," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 97-107, January.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
- Chih‐Hsiung Wang, 2006. "Optimal production and maintenance policy for imperfect production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(2), pages 151-156, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
- Wang, Chih-Hsiung & Sheu, Shey-Heui, 2003. "Optimal lot sizing for products sold under free-repair warranty," European Journal of Operational Research, Elsevier, vol. 149(1), pages 131-141, August.
- Yeh, Ruey Huei & Ho, Wen-Tsung & Tseng, Sheng-Tsaing, 2000. "Optimal production run length for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 120(3), pages 575-582, February.
- Izzet Sahin & Hakan Polatoglu, 1995. "Distributions of manufacturer's and user's replacement costs under warranty," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(8), pages 1233-1250, December.
- Murthy, D. N. P. & Djamaludin, I., 2002. "New product warranty: A literature review," International Journal of Production Economics, Elsevier, vol. 79(3), pages 231-260, October.
- Giri, B.C. & Dohi, T., 2007. "Inspection scheduling for imperfect production processes under free repair warranty contract," European Journal of Operational Research, Elsevier, vol. 183(1), pages 238-252, November.
- Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
- Marlin U. Thomas & Sridevi S. Rao, 1999. "Warranty Economic Decision Models: A Summary and Some Suggested Directions for Future Research," Operations Research, INFORMS, vol. 47(6), pages 807-820, December.
- K-L Hou, 2005. "Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 346-350, March.
- Hu, Fei & Zong, Qun, 2009. "Optimal production run time for a deteriorating production system under an extended inspection policy," European Journal of Operational Research, Elsevier, vol. 196(3), pages 979-986, August.
- B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
- Tang, Kwei & Gong, Linguo & Chang, Dong-Shang, 2003. "Optimal process control policies under a time-varying cost structure," European Journal of Operational Research, Elsevier, vol. 149(1), pages 197-210, August.
- Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
- Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
- Chen, Hsi-Mei & Huang, Cheng-Hung, 2001. "A system identification problem of estimating parameters in the profit analysis model for a product," International Journal of Production Economics, Elsevier, vol. 72(1), pages 15-26, June.
- Hsieh, Chung-Chi & Lee, Zong-Zhe, 2005. "Joint determination of production run length and number of standbys in a deteriorating production process," European Journal of Operational Research, Elsevier, vol. 162(2), pages 359-371, April.
- Philipp Schwarz & Oliver Schacht & Sven Klaassen & Daniel Grunbaum & Sebastian Imhof & Martin Spindler, 2024. "Management Decisions in Manufacturing using Causal Machine Learning -- To Rework, or not to Rework?," Papers 2406.11308, arXiv.org.
- Khan, Mehmood & Jaber, Mohamad Y. & Bonney, Maurice, 2011. "An economic order quantity (EOQ) for items with imperfect quality and inspection errors," International Journal of Production Economics, Elsevier, vol. 133(1), pages 113-118, September.
- Freimer, Michael & Thomas, Douglas & Tyworth, John, 2006. "The value of setup cost reduction and process improvement for the economic production quantity model with defects," European Journal of Operational Research, Elsevier, vol. 173(1), pages 241-251, August.
- Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
More about this item
Keywords
production; maintenance; warranty;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:sae:risrel:v:221:y:2007:i:4:p:257-264. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: SAGE Publications (email available below). General contact details of provider: .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.