An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
- Hoque, M. A. & Goyal, S. K., 2000. "An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment," International Journal of Production Economics, Elsevier, vol. 65(3), pages 305-315, May.
- Viswanathan, S., 1998. "Optimal strategy for the integrated vendor-buyer inventory model," European Journal of Operational Research, Elsevier, vol. 105(1), pages 38-42, February.
- Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
- Goyal, S. K., 2002. "Note: Reply to R.A. Sarker," International Journal of Production Economics, Elsevier, vol. 77(1), pages 91-91, May.
- Goyal, S. K. & Szendrovits, A. Z., 1986. "A constant lot size model with equal and unequal sized batch shipments between production stages," Engineering Costs and Production Economics, Elsevier, vol. 10(3), pages 203-210, March.
- M Ben-Daya & M Hariga, 2000. "Economic lot scheduling problem with imperfect production processes," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(7), pages 875-881, July.
- Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
- Goyal, Suresh K. & Nebebe, Fassil, 2000. "Determination of economic production-shipment policy for a single-vendor-single-buyer system," European Journal of Operational Research, Elsevier, vol. 121(1), pages 175-178, February.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
- Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
- Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
- Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
- Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
- Zhou, Yong-Wu & Wang, Sheng-Dong, 2007. "Optimal production and shipment models for a single-vendor-single-buyer integrated system," European Journal of Operational Research, Elsevier, vol. 180(1), pages 309-328, July.
- Sucky, Eric, 2005. "Inventory management in supply chains: A bargaining problem," International Journal of Production Economics, Elsevier, vol. 93(1), pages 253-262, January.
- Wahab, M.I.M. & Mamun, S.M.H. & Ongkunaruk, P., 2011. "EOQ models for a coordinated two-level international supply chain considering imperfect items and environmental impact," International Journal of Production Economics, Elsevier, vol. 134(1), pages 151-158, November.
- Bylka, Stanislaw, 2003. "Competitive and cooperative policies for the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 533-544, January.
- Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
- Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
- David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
- Dey, O. & Giri, B.C., 2014. "Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 222-228.
- Hsiao, Yu-Cheng, 2008. "Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information," International Journal of Production Economics, Elsevier, vol. 115(1), pages 229-235, September.
- Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2007. "An integrated vendor-buyer inventory model with quality improvement and lead time reduction," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 349-358, July.
- Wen-Tsung Ho & Yu-Cheng Hsiao, 2014. "Optimal Mixed Batch Shipment Policy with Variable Safety Factor for the Single-Vendor Single-Buyer Production-Inventory System," Journal of Optimization Theory and Applications, Springer, vol. 161(2), pages 648-663, May.
- Wen-Tsung Ho & Shu-Fang Lai & Yun-Kuei Huang, 2014. "An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System," Journal of Optimization Theory and Applications, Springer, vol. 160(2), pages 636-658, February.
- Yao, Ming-Jong & Chiou, Chuang-Chun, 2004. "On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers," European Journal of Operational Research, Elsevier, vol. 159(2), pages 406-419, December.
- Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
- Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
- Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
- Chiou, Chuang-Chun & Yao, Ming-Jong & Tsai, Jenteng, 2007. "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 314-328, July.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:91:y:2004:i:1:p:91-98. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.