IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v97y1997i3p493-499.html
   My bibliography  Save this article

The single-vendor single-buyer integrated production-inventory model with a generalised policy

Author

Listed:
  • Hill, Roger M.

Abstract

No abstract is available for this item.

Suggested Citation

  • Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
  • Handle: RePEc:eee:ejores:v:97:y:1997:i:3:p:493-499
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(96)00267-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    2. Goyal, Suresh K. & Gupta, Yash P., 1989. "Integrated inventory models: The buyer-vendor coordination," European Journal of Operational Research, Elsevier, vol. 41(3), pages 261-269, August.
    3. Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
    2. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    3. David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
    4. Sarker, Bhaba R. & Diponegoro, Ahmad, 2009. "Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers," European Journal of Operational Research, Elsevier, vol. 194(3), pages 753-773, May.
    5. Mohamed E. Seliaman, 2013. "Optimizing the Two-Stage Supply Chain Inventory Model with Full Information Sharing and Two Backorders Costs Using Hybrid Geometric-Algebraic Method," Journal of Optimization, Hindawi, vol. 2013, pages 1-5, May.
    6. Sucky, Eric, 2005. "Inventory management in supply chains: A bargaining problem," International Journal of Production Economics, Elsevier, vol. 93(1), pages 253-262, January.
    7. Simpson, N.C., 2007. "Central versus local multiple stage inventory planning: An analysis of solutions," European Journal of Operational Research, Elsevier, vol. 181(1), pages 127-138, August.
    8. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
    9. Sucky, Eric, 2006. "A bargaining model with asymmetric information for a single supplier-single buyer problem," European Journal of Operational Research, Elsevier, vol. 171(2), pages 516-535, June.
    10. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    11. Jiafu Tang & Kai-Leung Yung & Iko Kaku & Jianbo Yang, 2008. "The scheduling of deliveries in a production-distribution system with multiple buyers," Annals of Operations Research, Springer, vol. 161(1), pages 5-23, July.
    12. Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
    13. Chiou, Chuang-Chun & Yao, Ming-Jong & Tsai, Jenteng, 2007. "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 314-328, July.
    14. Chan, Chi Kin & Lee, Y.C.E. & Campbell, J.F., 2013. "Environmental performance—Impacts of vendor–buyer coordination," International Journal of Production Economics, Elsevier, vol. 145(2), pages 683-695.
    15. Kaya, Onur & Kubalı, Deniz & Örmeci, Lerzan, 2013. "A coordinated production and shipment model in a supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 120-131.
    16. Viswanathan, S., 1998. "Optimal strategy for the integrated vendor-buyer inventory model," European Journal of Operational Research, Elsevier, vol. 105(1), pages 38-42, February.
    17. Bylka, Stanislaw, 2009. "Non-cooperative strategies for production and shipments lot sizing in the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 118(1), pages 243-252, March.
    18. Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
    19. Ho, Chia-Huei & Ouyang, Liang-Yuh & Su, Chia-Hsien, 2008. "Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit," European Journal of Operational Research, Elsevier, vol. 187(2), pages 496-510, June.
    20. Ben-Daya, M. & Hariga, M., 2004. "Integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 92(1), pages 75-80, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:97:y:1997:i:3:p:493-499. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.