IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v181y2007i1p127-138.html
   My bibliography  Save this article

Central versus local multiple stage inventory planning: An analysis of solutions

Author

Listed:
  • Simpson, N.C.

Abstract

No abstract is available for this item.

Suggested Citation

  • Simpson, N.C., 2007. "Central versus local multiple stage inventory planning: An analysis of solutions," European Journal of Operational Research, Elsevier, vol. 181(1), pages 127-138, August.
  • Handle: RePEc:eee:ejores:v:181:y:2007:i:1:p:127-138
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)00380-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Charles J. Corbett, 2001. "Stochastic Inventory Systems in a Supply Chain with Asymmetric Information: Cycle Stocks, Safety Stocks, and Consignment Stock," Operations Research, INFORMS, vol. 49(4), pages 487-500, August.
    2. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    3. Hau L. Lee & Kut C. So & Christopher S. Tang, 2000. "The Value of Information Sharing in a Two-Level Supply Chain," Management Science, INFORMS, vol. 46(5), pages 626-643, May.
    4. Bourland, Karla E. & Powell, Stephen G. & Pyke, David F., 1996. "Exploiting timely demand information to reduce inventories," European Journal of Operational Research, Elsevier, vol. 92(2), pages 239-253, July.
    5. Hau Lee & Seungjin Whang, 1999. "Decentralized Multi-Echelon Supply Chains: Incentives and Information," Management Science, INFORMS, vol. 45(5), pages 633-640, May.
    6. Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
    7. Goyal, S. K., 2000. "On improving the single-vendor single-buyer integrated production inventory model with a generalized policy," European Journal of Operational Research, Elsevier, vol. 125(2), pages 429-430, September.
    8. Fred Hanssmann, 1959. "Optimal Inventory Location and Control in Production and Distribution Networks," Operations Research, INFORMS, vol. 7(4), pages 483-498, August.
    9. Goyal, Suresh K. & Gupta, Yash P., 1989. "Integrated inventory models: The buyer-vendor coordination," European Journal of Operational Research, Elsevier, vol. 41(3), pages 261-269, August.
    10. Otto, Andreas & Kotzab, Herbert, 2003. "Does supply chain management really pay? Six perspectives to measure the performance of managing a supply chain," European Journal of Operational Research, Elsevier, vol. 144(2), pages 306-320, January.
    11. Leroy B. Schwarz & Linus Schrage, 1975. "Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems," Management Science, INFORMS, vol. 21(11), pages 1285-1294, July.
    12. Sven Axsäter & Kaj Rosling, 1993. "Notes: Installation vs. Echelon Stock Policies for Multilevel Inventory Control," Management Science, INFORMS, vol. 39(10), pages 1274-1280, October.
    13. Gérard P. Cachon & Paul H. Zipkin, 1999. "Competitive and Cooperative Inventory Policies in a Two-Stage Supply Chain," Management Science, INFORMS, vol. 45(7), pages 936-953, July.
    14. Srinagesh Gavirneni & Roman Kapuscinski & Sridhar Tayur, 1999. "Value of Information in Capacitated Supply Chains," Management Science, INFORMS, vol. 45(1), pages 16-24, January.
    15. Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
    16. Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2003. "A fuzzy echelon approach for inventory management in supply chains," European Journal of Operational Research, Elsevier, vol. 149(1), pages 185-196, August.
    17. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    18. Fu, Yonghui & Piplani, Rajesh, 2004. "Supply-side collaboration and its value in supply chains," European Journal of Operational Research, Elsevier, vol. 152(1), pages 281-288, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Martin Albrecht, 2017. "Coordination of dynamic lot-sizing in supply chains," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(3), pages 322-330, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.
    2. Anantaram Balakrishnan & Joseph Geunes & Michael S. Pangburn, 2004. "Coordinating Supply Chains by Controlling Upstream Variability Propagation," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 163-183, July.
    3. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    4. Sucky, Eric, 2005. "Inventory management in supply chains: A bargaining problem," International Journal of Production Economics, Elsevier, vol. 93(1), pages 253-262, January.
    5. Sucky, Eric, 2006. "A bargaining model with asymmetric information for a single supplier-single buyer problem," European Journal of Operational Research, Elsevier, vol. 171(2), pages 516-535, June.
    6. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    7. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    8. Yossi Aviv, 2002. "Gaining Benefits from Joint Forecasting and Replenishment Processes: The Case of Auto-Correlated Demand," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 55-74, December.
    9. Chiou, Chuang-Chun & Yao, Ming-Jong & Tsai, Jenteng, 2007. "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 314-328, July.
    10. Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
    11. Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
    12. Holly Lutze & Özalp Özer, 2008. "Promised Lead-Time Contracts Under Asymmetric Information," Operations Research, INFORMS, vol. 56(4), pages 898-915, August.
    13. David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
    14. Chu, Chi-Leung & Leon, V. Jorge, 2008. "Single-vendor multi-buyer inventory coordination under private information," European Journal of Operational Research, Elsevier, vol. 191(2), pages 485-503, December.
    15. Wang, Hongwei & Guo, Min & Efstathiou, Janet, 2004. "A game-theoretical cooperative mechanism design for a two-echelon decentralized supply chain," European Journal of Operational Research, Elsevier, vol. 157(2), pages 372-388, September.
    16. Li Chen & Hau L. Lee, 2009. "Information Sharing and Order Variability Control Under a Generalized Demand Model," Management Science, INFORMS, vol. 55(5), pages 781-797, May.
    17. Po-Yu Chen, 2017. "Optimal Retail Price Model for Partial Consignment to Multiple Retailers," Complexity, Hindawi, vol. 2017, pages 1-11, December.
    18. Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
    19. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    20. Bylka, Stanislaw, 2003. "Competitive and cooperative policies for the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 533-544, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:181:y:2007:i:1:p:127-138. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.