IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v108y2007i1-2p349-358.html
   My bibliography  Save this article

An integrated vendor-buyer inventory model with quality improvement and lead time reduction

Author

Listed:
  • Ouyang, Liang-Yuh
  • Wu, Kun-Shan
  • Ho, Chia-Huei

Abstract

No abstract is available for this item.

Suggested Citation

  • Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2007. "An integrated vendor-buyer inventory model with quality improvement and lead time reduction," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 349-358, July.
  • Handle: RePEc:eee:proeco:v:108:y:2007:i:1-2:p:349-358
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(06)00330-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    2. Keller, G & Noori, H, 1988. "Impact of investing in quality improvement on the lot size model," Omega, Elsevier, vol. 16(6), pages 595-601.
    3. Kelle, Peter & Al-khateeb, Faisal & Anders Miller, Pam, 2003. "Partnership and negotiation support by joint optimal ordering/setup policies for JIT," International Journal of Production Economics, Elsevier, vol. 81(1), pages 431-441, January.
    4. P K Tripathy & W-M Wee & P R Majhi, 2003. "An EOQ model with process reliability considerations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(5), pages 549-554, May.
    5. Goyal, Suresh K. & Nebebe, Fassil, 2000. "Determination of economic production-shipment policy for a single-vendor-single-buyer system," European Journal of Operational Research, Elsevier, vol. 121(1), pages 175-178, February.
    6. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    7. Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
    8. Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
    9. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Z X Chen & B R Sarker, 2010. "Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(11), pages 1654-1666, November.
    2. M. Ganesh Kumar & R. Uthayakumar, 2017. "An integrated single vendor–buyer inventory model for imperfect production process with stochastic demand in controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1041-1054, November.
    3. M. Ganesh Kumar & R. Uthayakumar, 2019. "A two-echelon integrated inventory model under generalized lead time distribution with variable backordering rate," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(4), pages 552-562, August.
    4. Anuraag Gutgutia & J. K. Jha, 2018. "A closed-form solution for the distribution free continuous review integrated inventory model," Operational Research, Springer, vol. 18(1), pages 159-186, April.
    5. Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
    6. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    7. Li, Yina & Xu, Xuejun & Zhao, Xiande & Yeung, Jeff Hoi Yan & Ye, Fei, 2012. "Supply chain coordination with controllable lead time and asymmetric information," European Journal of Operational Research, Elsevier, vol. 217(1), pages 108-119.
    8. M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
    9. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
    10. Sumon Sarkar & Sunil Tiwari & B. C. Giri, 2022. "Impact of uncertain demand and lead-time reduction on two-echelon supply chain," Annals of Operations Research, Springer, vol. 315(2), pages 2027-2055, August.
    11. Ravi Shankar Kumar & M. K. Tiwari & A. Goswami, 2016. "Two-echelon fuzzy stochastic supply chain for the manufacturer–buyer integrated production–inventory system," Journal of Intelligent Manufacturing, Springer, vol. 27(4), pages 875-888, August.
    12. Raden Achmad Chairdino Leuveano & Mohd Nizam Ab Rahman & Wan Mohd Faizal Wan Mahmood & Chairul Saleh, 2019. "Integrated Vendor–Buyer Lot-Sizing Model with Transportation and Quality Improvement Consideration under Just-in-Time Problem," Mathematics, MDPI, vol. 7(10), pages 1-25, October.
    13. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    14. Md. Rokonuzzaman, 2018. "The Integration of Extended Supply Chain with Sales and Operation Planning: A Conceptual Framework," Logistics, MDPI, vol. 2(2), pages 1-21, March.
    15. Karuppuchamy Annadurai & Ramasamy Uthayakumar, 2014. "Ordering Cost Reduction in Inventory Model with Defective Items and Backorder Price Discount," Journal of Optimization, Hindawi, vol. 2014, pages 1-14, November.
    16. Luciano Novais & Juan Manuel Maqueira & Ángel Ortiz & Sebastián Bruque, 2021. "Strategic simulation models as a new methodological approach: an application to information technologies integration, lean/just-in-time and lead-time," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1185-1218, December.
    17. Kulkarni, Shailesh S., 2008. "On a multi-product model of lot-sizing with quality costs," International Journal of Production Economics, Elsevier, vol. 112(2), pages 1002-1010, April.
    18. Dey, O. & Giri, B.C., 2014. "Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 222-228.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
    2. YuJan Shen & KuanFu Shen & ChihTe Yang, 2019. "A Production Inventory Model for Deteriorating Items with Collaborative Preservation Technology Investment Under Carbon Tax," Sustainability, MDPI, vol. 11(18), pages 1-18, September.
    3. B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
    4. Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
    5. Bylka, Stanislaw, 2003. "Competitive and cooperative policies for the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 533-544, January.
    6. Kaya, Onur & Kubalı, Deniz & Örmeci, Lerzan, 2013. "A coordinated production and shipment model in a supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 120-131.
    7. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
    8. Liu, Xingchu & Cetinkaya, Sila, 2007. "A note on "quality improvement and setup reduction in the joint economic lot size model"," European Journal of Operational Research, Elsevier, vol. 182(1), pages 194-204, October.
    9. Bylka, Stanislaw, 2009. "Non-cooperative strategies for production and shipments lot sizing in the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 118(1), pages 243-252, March.
    10. Zhou, Yong-Wu & Wang, Sheng-Dong, 2007. "Optimal production and shipment models for a single-vendor-single-buyer integrated system," European Journal of Operational Research, Elsevier, vol. 180(1), pages 309-328, July.
    11. Ho, Chia-Huei & Ouyang, Liang-Yuh & Su, Chia-Hsien, 2008. "Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit," European Journal of Operational Research, Elsevier, vol. 187(2), pages 496-510, June.
    12. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    13. David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
    14. Sucky, Eric, 2006. "A bargaining model with asymmetric information for a single supplier-single buyer problem," European Journal of Operational Research, Elsevier, vol. 171(2), pages 516-535, June.
    15. Chu, Chi-Leung & Leon, V. Jorge, 2008. "Single-vendor multi-buyer inventory coordination under private information," European Journal of Operational Research, Elsevier, vol. 191(2), pages 485-503, December.
    16. Sucky, Eric, 2005. "Inventory management in supply chains: A bargaining problem," International Journal of Production Economics, Elsevier, vol. 93(1), pages 253-262, January.
    17. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    18. Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
    19. Ivan Darma Wangsa & Tao Ming Yang & Hui Ming Wee, 2018. "The Effect of Price-Dependent Demand on the Sustainable Electrical Energy Supply Chain," Energies, MDPI, vol. 11(7), pages 1-18, June.
    20. Ben-Daya, Mohammed & As’ad, Rami & Seliaman, Mohammed, 2013. "An integrated production inventory model with raw material replenishment considerations in a three layer supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 53-61.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:108:y:2007:i:1-2:p:349-358. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.