IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v58y1999i2p183-189.html
   My bibliography  Save this article

An optimal production run length in deteriorating production processes

Author

Listed:
  • Hyun Kim, Chang
  • Hong, Yushin

Abstract

No abstract is available for this item.

Suggested Citation

  • Hyun Kim, Chang & Hong, Yushin, 1999. "An optimal production run length in deteriorating production processes," International Journal of Production Economics, Elsevier, vol. 58(2), pages 183-189, January.
  • Handle: RePEc:eee:proeco:v:58:y:1999:i:2:p:183-189
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(98)00119-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. רבקה פריאור, 1984. "נפגעי תאונות עבודה, 1982," Working Papers 382, National Insurance Institute of Israel.
    2. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
    3. Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
    4. Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
    2. Lo, Sh-Tyan & Wee, Hui-Ming & Huang, Wen-Chang, 2007. "An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation," International Journal of Production Economics, Elsevier, vol. 106(1), pages 248-260, March.
    3. Tapan Kumar Datta, 2017. "Inventory system with defective products and investment opportunity for reducing defective proportion," Operational Research, Springer, vol. 17(1), pages 297-312, April.
    4. W. Pearn & R. Su & M. Weng & C. Hsu, 2011. "Optimal production run time for two-stage production system with imperfect processes and allowable shortages," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 19(4), pages 533-545, December.
    5. R. Patro & Mitali M. Nayak & M. Acharya, 2019. "An EOQ model for fuzzy defective rate with allowable proportionate discount," OPSEARCH, Springer;Operational Research Society of India, vol. 56(1), pages 191-215, March.
    6. Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
    7. Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
    8. Mitali Sarkar & Biswajit Sarkar & Muhammad Waqas Iqbal, 2018. "Effect of Energy and Failure Rate in a Multi-Item Smart Production System," Energies, MDPI, Open Access Journal, vol. 11(11), pages 1-21, October.
    9. Hsieh, Chung-Chi & Lee, Zong-Zhe, 2005. "Joint determination of production run length and number of standbys in a deteriorating production process," European Journal of Operational Research, Elsevier, vol. 162(2), pages 359-371, April.
    10. Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
    11. Chen, Cheng-Kang & Lo, Chih-Chung & Liao, Yi-Xiang, 2008. "Optimal lot size with learning consideration on an imperfect production system with allowable shortages," International Journal of Production Economics, Elsevier, vol. 113(1), pages 459-469, May.
    12. Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
    13. Wang, Chih-Hsiung, 2005. "Integrated production and product inspection policy for a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 95(1), pages 123-134, January.
    14. Chih‐Hsiung Wang, 2006. "Optimal production and maintenance policy for imperfect production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(2), pages 151-156, March.
    15. Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
    16. Chen, Cheng-Kang & Lo, Chih-Chung & Weng, Tzu-Chun, 2017. "Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period," European Journal of Operational Research, Elsevier, vol. 259(2), pages 401-412.
    17. Eroglu, Abdullah & Ozdemir, Gultekin, 2007. "An economic order quantity model with defective items and shortages," International Journal of Production Economics, Elsevier, vol. 106(2), pages 544-549, April.
    18. Hu, Fei & Zong, Qun, 2009. "Optimal production run time for a deteriorating production system under an extended inspection policy," European Journal of Operational Research, Elsevier, vol. 196(3), pages 979-986, August.
    19. Defersha, Fantahun M. & Chen, Mingyuan, 2008. "A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality," European Journal of Operational Research, Elsevier, vol. 187(1), pages 46-69, May.
    20. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2009. "Production lot sizing with process deterioration and machine breakdown under inspection schedule," Omega, Elsevier, vol. 37(2), pages 257-271, April.
    21. Gour Chandra Mahata, 2017. "A production-inventory model with imperfect production process and partial backlogging under learning considerations in fuzzy random environments," Journal of Intelligent Manufacturing, Springer, vol. 28(4), pages 883-897, April.
    22. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    2. Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
    3. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    4. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
    5. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
    6. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
    7. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    8. Peng, Hao & van Houtum, Geert-Jan, 2016. "Joint optimization of condition-based maintenance and production lot-sizing," European Journal of Operational Research, Elsevier, vol. 253(1), pages 94-107.
    9. Giri, B. C. & Yun, W. Y. & Dohi, T., 2005. "Optimal design of unreliable production-inventory systems with variable production rate," European Journal of Operational Research, Elsevier, vol. 162(2), pages 372-386, April.
    10. Chelbi, Anis & Ait-Kadi, Daoud, 2004. "Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance," European Journal of Operational Research, Elsevier, vol. 156(3), pages 712-718, August.
    11. Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
    12. Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
    13. Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
    14. Jin, Xiaoning & Li, Lin & Ni, Jun, 2009. "Option model for joint production and preventive maintenance system," International Journal of Production Economics, Elsevier, vol. 119(2), pages 347-353, June.
    15. Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    16. Ki Ling Cheung & Warren H. Hausman, 1997. "Joint determination of preventive maintenance and safety stocks in an unreliable production environment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(3), pages 257-272, April.
    17. El-Ferik, Sami, 2008. "Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy," European Journal of Operational Research, Elsevier, vol. 186(1), pages 150-163, April.
    18. Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
    19. Yeh, Ruey Huei & Ho, Wen-Tsung & Tseng, Sheng-Tsaing, 2000. "Optimal production run length for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 120(3), pages 575-582, February.
    20. Dohi, Tadashi & Okamura, Hiroyuki & Osaki, Shunji, 2001. "Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 147-155, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:58:y:1999:i:2:p:183-189. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Nithya Sathishkumar). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service hosted by the Research Division of the Federal Reserve Bank of St. Louis . RePEc uses bibliographic data supplied by the respective publishers.