IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v180y2007i2p664-676.html
   My bibliography  Save this article

Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns

Author

Listed:
  • Chiu, Singa Wang
  • Wang, Shan-Ling
  • Chiu, Yuan-Shyi Peter

Abstract

No abstract is available for this item.

Suggested Citation

  • Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
  • Handle: RePEc:eee:ejores:v:180:y:2007:i:2:p:664-676
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)00335-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
    2. Maiwenn J. Al & Ben A. Van Hout & Bowine C. Michel & Frans F.H. Rutten, 1998. "Sample size calculation in economic evaluations," Health Economics, John Wiley & Sons, Ltd., vol. 7(4), pages 327-335, June.
    3. Hyun Kim, Chang & Hong, Yushin, 1999. "An optimal production run length in deteriorating production processes," International Journal of Production Economics, Elsevier, vol. 58(2), pages 183-189, January.
    4. Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
    5. M. Berg & M. J. M. Posner & H. Zhao, 1994. "Production-Inventory Systems with Unreliable Machines," Operations Research, INFORMS, vol. 42(1), pages 111-118, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Shima Shafiee-Gol & Mohammad Mahdi Nasiri & Ata Allah Taleizadeh, 2016. "Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 873-888, December.
    2. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
    3. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    4. Shine-Der Lee & Chin-Ming Yang & Shu-Chuan Lan, 2016. "Economic lot sizing in a production system with random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1142-1154, April.
    5. Chen, Ke & Cheng, T.C.E. & Huang, Hailiang & Ji, Min & Yao, Danli, 2023. "Single-machine scheduling with autonomous and induced learning to minimize total weighted number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 309(1), pages 24-34.
    6. Paul, Sanjoy Kumar & Sarker, Ruhul & Essam, Daryl, 2014. "Real time disruption management for a two-stage batch production–inventory system with reliability considerations," European Journal of Operational Research, Elsevier, vol. 237(1), pages 113-128.
    7. Chiu, Yuan-Shyi Peter & Chang, Huei-Hsin, 2014. "Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note," Economic Modelling, Elsevier, vol. 37(C), pages 143-148.
    8. Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.
    9. Prasanta Kumar Ghosh & Amalesh Kumar Manna & Jayanta Kumar Dey & Samarjit Kar, 2023. "Optimal production run in an imperfect production process with maintenance under warranty and product insurance," OPSEARCH, Springer;Operational Research Society of India, vol. 60(2), pages 720-752, June.
    10. Wee, Hui Ming & Widyadana, Gede Agus, 2013. "A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule," Omega, Elsevier, vol. 41(6), pages 941-954.
    11. Widyadana, Gede Agus & Wee, Hui Ming, 2012. "An economic production quantity model for deteriorating items with multiple production setups and rework," International Journal of Production Economics, Elsevier, vol. 138(1), pages 62-67.
    12. Chiu, Yuan-Shyi Peter & Ting, Chia-Kuan, 2010. "A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns"," European Journal of Operational Research, Elsevier, vol. 201(2), pages 641-643, March.
    13. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
    14. Pasandideh, Seyed Hamid Reza & Niaki, Seyed Taghi Akhavan & Nobil, Amir Hossein & Cárdenas-Barrón, Leopoldo Eduardo, 2015. "A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost," International Journal of Production Economics, Elsevier, vol. 169(C), pages 203-214.
    15. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    16. Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
    2. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    3. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    4. Hu, Fei & Zong, Qun, 2009. "Optimal production run time for a deteriorating production system under an extended inspection policy," European Journal of Operational Research, Elsevier, vol. 196(3), pages 979-986, August.
    5. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    6. Chiu, Singa Wang & Chou, Chung-Li & Wu, Wen-Kuei, 2013. "Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown," Economic Modelling, Elsevier, vol. 35(C), pages 330-337.
    7. Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
    8. Hsieh, Chung-Chi & Lee, Zong-Zhe, 2005. "Joint determination of production run length and number of standbys in a deteriorating production process," European Journal of Operational Research, Elsevier, vol. 162(2), pages 359-371, April.
    9. Jin, Xiaoning & Li, Lin & Ni, Jun, 2009. "Option model for joint production and preventive maintenance system," International Journal of Production Economics, Elsevier, vol. 119(2), pages 347-353, June.
    10. Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    11. Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
    12. K.Y. Kung & Y.D. Huang & H.M. Wee & Y. Daryanto, 2019. "Production-Inventory System for Deteriorating Items with Machine Breakdown, Inspection, and Partial Backordering," Mathematics, MDPI, vol. 7(7), pages 1-26, July.
    13. Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
    14. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2009. "Production lot sizing with process deterioration and machine breakdown under inspection schedule," Omega, Elsevier, vol. 37(2), pages 257-271, April.
    15. Giri, B. C. & Dohi, T., 2004. "Optimal lot sizing for an unreliable production system based on net present value approach," International Journal of Production Economics, Elsevier, vol. 92(2), pages 157-167, November.
    16. Viliam Makis, 1998. "Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(2), pages 165-186, March.
    17. Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
    18. Chih‐Hsiung Wang, 2006. "Optimal production and maintenance policy for imperfect production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(2), pages 151-156, March.
    19. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
    20. W. Pearn & R. Su & M. Weng & C. Hsu, 2011. "Optimal production run time for two-stage production system with imperfect processes and allowable shortages," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 19(4), pages 533-545, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:180:y:2007:i:2:p:664-676. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.