Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.References listed on IDEAS
- Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
- Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
- Chelbi, Anis & Ait-Kadi, Daoud, 2000. "Generalized inspection strategy for randomly failing systems subjected to random shocks," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 379-384, March.
- Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
- Pintelon, L. M. & Gelders, L. F., 1992. "Maintenance management decision making," European Journal of Operational Research, Elsevier, vol. 58(3), pages 301-317, May.
- Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Batching with Machine Breakdowns and Safety Stocks," Operations Research, INFORMS, vol. 40(5), pages 959-971, October.
- Van der Duyn Schouten, F. A. & Vanneste, S. G., 1995. "Maintenance optimization of a production system with buffer capacity," European Journal of Operational Research, Elsevier, vol. 82(2), pages 323-338, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
- Chelbi, Anis & Rezg, Nidhal, 2006. "Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 131-143, February.
- Thomas Sloan, 2008. "Simultaneous determination of production and maintenance schedules using ināline equipment condition and yield information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(2), pages 116-129, March.
- Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
- Jin, Xiaoning & Li, Lin & Ni, Jun, 2009. "Option model for joint production and preventive maintenance system," International Journal of Production Economics, Elsevier, vol. 119(2), pages 347-353, June.
- Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Viliam Makis, 1998. "Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(2), pages 165-186, March.
- Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
- Zequeira, Romulo I. & Valdes, Jose E. & Berenguer, Christophe, 2008. "Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability," International Journal of Production Economics, Elsevier, vol. 111(2), pages 686-696, February.
- Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
- Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
- Nabil Nahas, 2017. "Buffer allocation and preventive maintenance optimization in unreliable production lines," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 85-93, January.
- Ki Ling Cheung & Warren H. Hausman, 1997. "Joint determination of preventive maintenance and safety stocks in an unreliable production environment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(3), pages 257-272, April.
- Maria Chiara Magnanini & Tullio Tolio, 2020. "Switching- and hedging- point policy for preventive maintenance with degrading machines: application to a two-machine line," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 241-271, June.
- Borrero, J.S. & Akhavan-Tabatabaei, R., 2013. "Time and inventory dependent optimal maintenance policies for single machine workstations: An MDP approach," European Journal of Operational Research, Elsevier, vol. 228(3), pages 545-555.
- Mohebbi, E., 2008. "A note on a production control model for a facility with limited storage capacity in a random environment," European Journal of Operational Research, Elsevier, vol. 190(2), pages 562-570, October.
- Dimitrakos, T.D. & Kyriakidis, E.G., 2008. "A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times," International Journal of Production Economics, Elsevier, vol. 111(2), pages 752-762, February.
- Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
- Ribeiro, M.A. & Silveira, J.L. & Qassim, R.Y., 2007. "Joint optimisation of maintenance and buffer size in a manufacturing system," European Journal of Operational Research, Elsevier, vol. 176(1), pages 405-413, January.
- Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:156:y:2004:i:3:p:712-718. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.
Printed from https://ideas.repec.org/a/eee/ejores/v156y2004i3p712-718.html