A review of scheduling research involving setup considerations

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Sheikh, Shaya & Komaki, G.M. & Kayvanfar, Vahid & Teymourian, Ehsan, 2019. "Multi-Stage assembly flow shop with setup time and release time," Operations Research Perspectives, Elsevier, vol. 6(C).
  2. Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.
  3. Jennifer L. Loveland & Susan K. Monkman & Douglas J. Morrice, 2007. "Dell Uses a New Production-Scheduling Algorithm to Accommodate Increased Product Variety," Interfaces, INFORMS, vol. 37(3), pages 209-219, June.
  4. F. Rodriguez & C. Blum & C. García-Martínez & M. Lozano, 2012. "GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times," Annals of Operations Research, Springer, vol. 201(1), pages 383-401, December.
  5. Rajendran, Chandrasekharan & Ziegler, Hans, 2003. "Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 149(3), pages 513-522, September.
  6. Og[breve]uz, Ceyda & Sibel Salman, F. & Bilgintürk YalçIn, Zehra, 2010. "Order acceptance and scheduling decisions in make-to-order systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 200-211, May.
  7. Rossit, Daniel Alejandro & Tohmé, Fernando & Frutos, Mariano, 2018. "The Non-Permutation Flow-Shop scheduling problem: A literature review," Omega, Elsevier, vol. 77(C), pages 143-153.
  8. Brucker, Peter & Knust, Sigrid & Wang, Guoqing, 2005. "Complexity results for flow-shop problems with a single server," European Journal of Operational Research, Elsevier, vol. 165(2), pages 398-407, September.
  9. Nauss, Robert M., 2008. "Optimal sequencing in the presence of setup times for tow/barge traffic through a river lock," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1268-1281, June.
  10. Allahverdi, Ali, 2016. "A survey of scheduling problems with no-wait in process," European Journal of Operational Research, Elsevier, vol. 255(3), pages 665-686.
  11. Khalil Tliba & Thierno M. L. Diallo & Olivia Penas & Romdhane Ben Khalifa & Noureddine Ben Yahia & Jean-Yves Choley, 2023. "Digital twin-driven dynamic scheduling of a hybrid flow shop," Journal of Intelligent Manufacturing, Springer, vol. 34(5), pages 2281-2306, June.
  12. Bagchi, Tapan P. & Gupta, Jatinder N.D. & Sriskandarajah, Chelliah, 2006. "A review of TSP based approaches for flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 169(3), pages 816-854, March.
  13. Hinder, Oliver & Mason, Andrew J., 2017. "A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness," European Journal of Operational Research, Elsevier, vol. 262(2), pages 411-423.
  14. Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y. & Nossack, Jenny & Pesch, Erwin, 2014. "Minimizing setup costs in a transfer line design problem with sequential operation processing," International Journal of Production Economics, Elsevier, vol. 151(C), pages 186-194.
  15. Pan, Quan-Ke & Ruiz, Rubén, 2012. "An estimation of distribution algorithm for lot-streaming flow shop problems with setup times," Omega, Elsevier, vol. 40(2), pages 166-180, April.
  16. Zhi‐Long Chen & Warren B. Powell, 2003. "Exact algorithms for scheduling multiple families of jobs on parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(7), pages 823-840, October.
  17. Hamed Hendizadeh, S. & Faramarzi, Hamidreza & Mansouri, S.Afshin & Gupta, Jatinder N.D. & Y ElMekkawy, Tarek, 2008. "Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times," International Journal of Production Economics, Elsevier, vol. 111(2), pages 593-605, February.
  18. Marko Ɖurasević & Domagoj Jakobović, 2019. "Creating dispatching rules by simple ensemble combination," Journal of Heuristics, Springer, vol. 25(6), pages 959-1013, December.
  19. Rauchecker, Gerhard & Schryen, Guido, 2019. "An exact branch-and-price algorithm for scheduling rescue units during disaster response," European Journal of Operational Research, Elsevier, vol. 272(1), pages 352-363.
  20. Hatami, Sara & Ruiz, Rubén & Andrés-Romano, Carlos, 2015. "Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times," International Journal of Production Economics, Elsevier, vol. 169(C), pages 76-88.
  21. Dominik Kress & David Müller & Jenny Nossack, 2019. "A worker constrained flexible job shop scheduling problem with sequence-dependent setup times," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 179-217, March.
  22. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
  23. Wang, Chao & Lim, Ming K & Zhao, Longfeng & Tseng, Ming-Lang & Chien, Chen-Fu & Lev, Benjamin, 2020. "The evolution of Omega-The International Journal of Management Science over the past 40 years: A bibliometric overview," Omega, Elsevier, vol. 93(C).
  24. Alessandro Agnetis & Arianna Alfieri & Gaia Nicosia, 2009. "Single-Machine Scheduling Problems with Generalized Preemption," INFORMS Journal on Computing, INFORMS, vol. 21(1), pages 1-12, February.
  25. Diwas Singh KC, 2014. "Does Multitasking Improve Performance? Evidence from the Emergency Department," Manufacturing & Service Operations Management, INFORMS, vol. 16(2), pages 168-183, May.
  26. Gupta, Skylab R. & Smith, Jeffrey S., 2006. "Algorithms for single machine total tardiness scheduling with sequence dependent setups," European Journal of Operational Research, Elsevier, vol. 175(2), pages 722-739, December.
  27. J N D Gupta & J E Schaller, 2006. "Minimizing flow time in a flow-line manufacturing cell with family setup times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(2), pages 163-176, February.
  28. S. M. Mousavi & I. Mahdavi & J. Rezaeian & M. Zandieh, 2018. "An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times," Operational Research, Springer, vol. 18(1), pages 123-158, April.
  29. Jinwen Ou, 2020. "Near-linear-time approximation algorithms for scheduling a batch-processing machine with setups and job rejection," Journal of Scheduling, Springer, vol. 23(5), pages 525-538, October.
  30. Byung-Cheon Choi & Myoung-Ju Park, 2015. "A Batch Scheduling Problem with Two Agents," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 32(06), pages 1-19, December.
  31. Allahverdi, Ali & Soroush, H.M., 2008. "The significance of reducing setup times/setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 978-984, June.
  32. Monkman, Susan K. & Morrice, Douglas J. & Bard, Jonathan F., 2008. "A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1100-1114, June.
  33. Jorge M. S. Valente, 2005. "Beam search algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setups," FEP Working Papers 186, Universidade do Porto, Faculdade de Economia do Porto.
  34. Detienne, Boris & Sadykov, Ruslan & Tanaka, Shunji, 2016. "The two-machine flowshop total completion time problem: Branch-and-bound algorithms based on network-flow formulation," European Journal of Operational Research, Elsevier, vol. 252(3), pages 750-760.
  35. Stef Moons & Katrien Ramaekers & An Caris & Yasemin Arda, 2018. "Integration of order picking and vehicle routing in a B2C e-commerce context," Flexible Services and Manufacturing Journal, Springer, vol. 30(4), pages 813-843, December.
  36. Suwa, Haruhiko, 2007. "A new when-to-schedule policy in online scheduling based on cumulative task delays," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 175-186, October.
  37. Daniel Ng, C. T. & Cheng, T. C. Edwin & Kovalyov, Mikhail Y., 2004. "Single machine batch scheduling with jointly compressible setup and processing times," European Journal of Operational Research, Elsevier, vol. 153(1), pages 211-219, February.
  38. Quadt, Daniel & Kuhn, Heinrich, 2007. "Batch scheduling of jobs with identical process times on flexible flow lines," International Journal of Production Economics, Elsevier, vol. 105(2), pages 385-401, February.
  39. Mok, P.Y. & Kwong, C.K. & Wong, W.K., 2007. "Optimisation of fault-tolerant fabric-cutting schedules using genetic algorithms and fuzzy set theory," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1876-1893, March.
  40. Berk, Emre & Toy, Ayhan Ozgur & Hazir, Oncu, 2008. "Single item lot-sizing problem for a warm/cold process with immediate lost sales," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1251-1267, June.
  41. Beraldi, Patrizia & Ghiani, Gianpaolo & Guerriero, Emanuela & Grieco, Antonio, 2006. "Scenario-based planning for lot-sizing and scheduling with uncertain processing times," International Journal of Production Economics, Elsevier, vol. 101(1), pages 140-149, May.
  42. Sicheng Zhang & T.N. Wong, 2016. "Studying the impact of sequence-dependent set-up times in integrated process planning and scheduling with E-ACO heuristic," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 4815-4838, August.
  43. repec:dgr:rugsom:02a72 is not listed on IDEAS
  44. S I Brown & R G McGarvey & J A Ventura, 2004. "Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 614-621, June.
  45. Yanıkoğlu, İhsan & Yavuz, Tonguc, 2022. "Branch-and-price approach for robust parallel machine scheduling with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 301(3), pages 875-895.
  46. Liji Shen & Lars Mönch & Udo Buscher, 2013. "An iterative approach for the serial batching problem with parallel machines and job families," Annals of Operations Research, Springer, vol. 206(1), pages 425-448, July.
  47. Ciavotta, Michele & Detti, Paolo & Meloni, Carlo & Pranzo, Marco, 2008. "A bi-objective coordination setup problem in a two-stage production system," European Journal of Operational Research, Elsevier, vol. 189(3), pages 734-745, September.
  48. Zhang Xingong & Wang Yong & Bai Shikun, 2016. "Single-machine group scheduling problems with deteriorating and learning effect," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(10), pages 2402-2410, July.
  49. Lele Zhang & Andrew Wirth, 2010. "On-line machine scheduling with batch setups," Journal of Combinatorial Optimization, Springer, vol. 20(3), pages 285-306, October.
  50. Pranzo, Marco, 2004. "Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times," European Journal of Operational Research, Elsevier, vol. 153(3), pages 581-592, March.
  51. Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
  52. S-W Lin & K-C Ying, 2008. "A hybrid approach for single-machine tardiness problems with sequence-dependent setup times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(8), pages 1109-1119, August.
  53. Antonio Costa & Fulvio Antonio Cappadonna & Sergio Fichera, 2017. "A hybrid genetic algorithm for minimizing makespan in a flow-shop sequence-dependent group scheduling problem," Journal of Intelligent Manufacturing, Springer, vol. 28(6), pages 1269-1283, August.
  54. Ruiz, Ruben & Maroto, Concepcion, 2006. "A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility," European Journal of Operational Research, Elsevier, vol. 169(3), pages 781-800, March.
  55. Koulamas, Christos & Kyparisis, George J., 2008. "Single-machine scheduling problems with past-sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1045-1049, June.
  56. Mina Roohnavazfar & Daniele Manerba & Lohic Fotio Tiotsop & Seyed Hamid Reza Pasandideh & Roberto Tadei, 2021. "Stochastic single machine scheduling problem as a multi-stage dynamic random decision process," Computational Management Science, Springer, vol. 18(3), pages 267-297, July.
  57. Yang, Wen-Hua & Chand, Suresh, 2008. "Learning and forgetting effects on a group scheduling problem," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1033-1044, June.
  58. Liou, Cheng-Dar & Hsieh, Yi-Chih, 2015. "A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 258-267.
  59. Grundel, Soesja & Çiftçi, Barış & Borm, Peter & Hamers, Herbert, 2013. "Family sequencing and cooperation," European Journal of Operational Research, Elsevier, vol. 226(3), pages 414-424.
  60. Xiao, Qian & Xu, Hongquan, 2021. "A mapping-based universal Kriging model for order-of-addition experiments in drug combination studies," Computational Statistics & Data Analysis, Elsevier, vol. 157(C).
  61. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2002. "Exploring applicability of the workload control concept," Research Report 02A72, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
  62. Nait Tahar, Djamel & Yalaoui, Farouk & Chu, Chengbin & Amodeo, Lionel, 2006. "A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 63-73, February.
  63. Boysen, Nils & Emde, Simon, 2014. "Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets," European Journal of Operational Research, Elsevier, vol. 239(3), pages 820-829.
  64. Al-Anzi, Fawaz S. & Allahverdi, Ali & Kovalyov, Mikhail Y., 2007. "Batching deteriorating items with applications in computer communication and reverse logistics," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1002-1011, November.
  65. F Jin & J N D Gupta & S Song & C Wu, 2010. "Single machine scheduling with sequence-dependent family setups to minimize maximum lateness," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(7), pages 1181-1189, July.
  66. Gharbi, Anis & Ladhari, Talel & Msakni, Mohamed Kais & Serairi, Mehdi, 2013. "The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies," European Journal of Operational Research, Elsevier, vol. 231(1), pages 69-78.
  67. Lukac, Zrinka & Soric, Kristina & Rosenzweig, Visnja Vojvodic, 2008. "Production planning problem with sequence dependent setups as a bilevel programming problem," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1504-1512, June.
  68. Andres, Carlos & Miralles, Cristobal & Pastor, Rafael, 2008. "Balancing and scheduling tasks in assembly lines with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1212-1223, June.
  69. Dominik Kress & Maksim Barketau & Erwin Pesch, 2018. "Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines," Journal of Scheduling, Springer, vol. 21(6), pages 595-606, December.
  70. C T Daniel Ng & T C E Cheng & M Y Kovalyov, 2003. "Batch scheduling with controllable setup and processing times to minimize total completion time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(5), pages 499-506, May.
  71. Philip Doganis & Haralambos Sarimveis, 2008. "Optimal production scheduling for the dairy industry," Annals of Operations Research, Springer, vol. 159(1), pages 315-331, March.
  72. Lele Zhang & Andrew Wirth, 2016. "Online Machine Scheduling with Family Setups," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(04), pages 1-16, August.
  73. Allahverdi, Ali & Al-Anzi, Fawaz S., 2006. "A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times," European Journal of Operational Research, Elsevier, vol. 169(3), pages 767-780, March.
  74. Ruiz, Ruben & Maroto, Concepcion & Alcaraz, Javier, 2005. "Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics," European Journal of Operational Research, Elsevier, vol. 165(1), pages 34-54, August.
  75. Vacharapoom Benjaoran & Nashwan Dawood & Brian Hobbs, 2005. "Flowshop scheduling model for bespoke precast concrete production planning," Construction Management and Economics, Taylor & Francis Journals, vol. 23(1), pages 93-105.
  76. Malaguti, Enrico & Medina Durán, Rosa & Toth, Paolo, 2014. "Approaches to real world two-dimensional cutting problems," Omega, Elsevier, vol. 47(C), pages 99-115.
  77. Bahram Alidaee & Haibo Wang & R. Bryan Kethley & Frank Landram, 2019. "A unified view of parallel machine scheduling with interdependent processing rates," Journal of Scheduling, Springer, vol. 22(5), pages 499-515, October.
  78. Havill, Jessen T. & Mao, Weizhen, 2008. "Competitive online scheduling of perfectly malleable jobs with setup times," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1126-1142, June.
  79. N Nekoiemehr & G Moslehi, 2011. "Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(7), pages 1403-1412, July.
  80. Weglarz, Jan & Józefowska, Joanna & Mika, Marek & Waligóra, Grzegorz, 2011. "Project scheduling with finite or infinite number of activity processing modes - A survey," European Journal of Operational Research, Elsevier, vol. 208(3), pages 177-205, February.
  81. Zhang, Zhe & Song, Xiaoling & Huang, Huijung & Zhou, Xiaoyang & Yin, Yong, 2022. "Logic-based Benders decomposition method for the seru scheduling problem with sequence-dependent setup time and DeJong’s learning effect," European Journal of Operational Research, Elsevier, vol. 297(3), pages 866-877.
  82. Cha, Young-Ho & Kim, Yeong-Dae, 2010. "Fire scheduling for planned artillery attack operations under time-dependent destruction probabilities," Omega, Elsevier, vol. 38(5), pages 383-392, October.
  83. Martin, Clarence H, 2009. "A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming," Omega, Elsevier, vol. 37(1), pages 126-137, February.
  84. Roger Z. Ríos-Mercado & Jonathan F. Bard, 2003. "The Flow Shop Scheduling Polyhedron with Setup Times," Journal of Combinatorial Optimization, Springer, vol. 7(3), pages 291-318, September.
  85. Hong-Yan Sang & Quan-Ke Pan & Pei-Yong Duan & Jun-Qing Li, 2018. "An effective discrete invasive weed optimization algorithm for lot-streaming flowshop scheduling problems," Journal of Intelligent Manufacturing, Springer, vol. 29(6), pages 1337-1349, August.
  86. Dunstall, Simon & Wirth, Andrew, 2005. "A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines," European Journal of Operational Research, Elsevier, vol. 167(2), pages 283-296, December.
  87. F T Tseng & J N D Gupta & E F Stafford, 2006. "A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(5), pages 541-551, May.
  88. D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
  89. Xi, Yue & Jang, Jaejin, 2012. "Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: An experimental study," International Journal of Production Economics, Elsevier, vol. 137(1), pages 1-10.
  90. Dirk Briskorn & Konrad Stephan & Nils Boysen, 2022. "Minimizing the makespan on a single machine subject to modular setups," Journal of Scheduling, Springer, vol. 25(1), pages 125-137, February.
  91. Stefansdottir, Bryndis & Grunow, Martin & Akkerman, Renzo, 2017. "Classifying and modeling setups and cleanings in lot sizing and scheduling," European Journal of Operational Research, Elsevier, vol. 261(3), pages 849-865.
  92. S.S. Panwalkar & Milton L. Smith & Christos Koulamas, 2013. "Review of the ordered and proportionate flow shop scheduling research," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(1), pages 46-55, February.
  93. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2004. "Exploring applicability of the workload control concept," International Journal of Production Economics, Elsevier, vol. 90(2), pages 187-198, July.
  94. Luo, Xiaochuan & Chu, Chengbin, 2007. "A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness," European Journal of Operational Research, Elsevier, vol. 180(1), pages 68-81, July.
  95. Melissa R. Bowers & Anurag Agarwal, 2007. "Fewer Equipment Changeovers for the Embroidery Process at Oxford Industries," Interfaces, INFORMS, vol. 37(6), pages 526-538, December.
  96. Mazdeh, Mohammad Mahdavi & Sarhadi, Mansoor & Hindi, Khalil S., 2007. "A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costs," European Journal of Operational Research, Elsevier, vol. 183(1), pages 74-86, November.
  97. Petroni, Alberto & Rizzi, Antonio, 2002. "A fuzzy logic based methodology to rank shop floor dispatching rules," International Journal of Production Economics, Elsevier, vol. 76(1), pages 99-108, March.
  98. Simon Thevenin & Nicolas Zufferey & Rémy Glardon, 2017. "Model and metaheuristics for a scheduling problem integrating procurement, sale and distribution decisions," Annals of Operations Research, Springer, vol. 259(1), pages 437-460, December.
  99. Susan Heath & Jonathan Bard & Douglas Morrice, 2013. "A GRASP for simultaneously assigning and sequencing product families on flexible assembly lines," Annals of Operations Research, Springer, vol. 203(1), pages 295-323, March.
  100. Felix Winter & Nysret Musliu, 2022. "A large neighborhood search approach for the paint shop scheduling problem," Journal of Scheduling, Springer, vol. 25(4), pages 453-475, August.
  101. Rubén Ruiz & Ali Allahverdi, 2007. "Some effective heuristics for no-wait flowshops with setup times to minimize total completion time," Annals of Operations Research, Springer, vol. 156(1), pages 143-171, December.
  102. Claassen, G.D.H., 2014. "Mixed integer (0–1) fractional programming for decision support in paper production industry," Omega, Elsevier, vol. 43(C), pages 21-29.
  103. Pang, King-Wah, 2013. "A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness," International Journal of Production Economics, Elsevier, vol. 141(1), pages 127-136.
  104. Bradley R. Staats & Francesca Gino, 2012. "Specialization and Variety in Repetitive Tasks: Evidence from a Japanese Bank," Management Science, INFORMS, vol. 58(6), pages 1141-1159, June.
  105. Lin, B.M.T. & Cheng, T.C.E. & Chou, A.S.C., 2007. "Scheduling in an assembly-type production chain with batch transfer," Omega, Elsevier, vol. 35(2), pages 143-151, April.
  106. Choudhury, Nilanjan D. & Wilhelm, Wilbert E. & Rao, Brijesh & Gott, Jonathan & Khotekar, Nikhilesh, 2007. "Process planning for circuit card assembly on a series of dual head placement machines," European Journal of Operational Research, Elsevier, vol. 182(2), pages 626-639, October.
  107. Al-Anzi, Fawaz S. & Allahverdi, Ali, 2007. "A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times," European Journal of Operational Research, Elsevier, vol. 182(1), pages 80-94, October.
  108. Missaoui, Ahmed & Ruiz, Rubén, 2022. "A parameter-Less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows," European Journal of Operational Research, Elsevier, vol. 303(1), pages 99-113.
  109. Mohammad Reza Hosseinzadeh & Mehdi Heydari & Mohammad Mahdavi Mazdeh, 2022. "Mathematical modeling and two metaheuristic algorithms for integrated process planning and group scheduling with sequence-dependent setup time," Operational Research, Springer, vol. 22(5), pages 5055-5105, November.
  110. Armentano, Vinicius Amaral & de Franca Filho, Moacir Felizardo, 2007. "Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach," European Journal of Operational Research, Elsevier, vol. 183(1), pages 100-114, November.
  111. Allahverdi, Ali, 2006. "Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times," International Journal of Production Economics, Elsevier, vol. 103(1), pages 386-400, September.
  112. Fátima Pilar & Eliana Costa e Silva & Ana Borges, 2023. "Optimizing Vehicle Repairs Scheduling Using Mixed Integer Linear Programming: A Case Study in the Portuguese Automobile Sector," Mathematics, MDPI, vol. 11(11), pages 1-23, June.
  113. Löhndorf, Nils & Riel, Manuel & Minner, Stefan, 2014. "Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 157(C), pages 170-176.
  114. Stafford, Edward F. & Tseng, Fan T., 2002. "Two models for a family of flowshop sequencing problems," European Journal of Operational Research, Elsevier, vol. 142(2), pages 282-293, October.
  115. Geert De Maere & Jason A. D. Atkin & Edmund K. Burke, 2018. "Pruning Rules for Optimal Runway Sequencing," Transportation Science, INFORMS, vol. 52(4), pages 898-916, August.
  116. Christian Artigues & Dominique Feillet, 2008. "A branch and bound method for the job-shop problem with sequence-dependent setup times," Annals of Operations Research, Springer, vol. 159(1), pages 135-159, March.
  117. Allahverdi, Ali & Aydilek, Harun, 2014. "Total completion time with makespan constraint in no-wait flowshops with setup times," European Journal of Operational Research, Elsevier, vol. 238(3), pages 724-734.
  118. Mujawar, Sachin & Huang, Simin & Nagi, Rakesh, 2012. "Scheduling to minimize stringer utilization for continuous annealing operations," Omega, Elsevier, vol. 40(4), pages 437-444.
  119. Garay-Sianca, Aniela & Nurre Pinkley, Sarah G., 2021. "Interdependent integrated network design and scheduling problems with movement of machines," European Journal of Operational Research, Elsevier, vol. 289(1), pages 297-327.
  120. Tony T. Tran & Arthur Araujo & J. Christopher Beck, 2016. "Decomposition Methods for the Parallel Machine Scheduling Problem with Setups," INFORMS Journal on Computing, INFORMS, vol. 28(1), pages 83-95, February.
  121. Yang, W.-H.Wen-Hua, 2004. "Scheduling two-component products on parallel machines," Omega, Elsevier, vol. 32(5), pages 353-359, October.
  122. Andres, Carlos & Albarracin, Jose Miguel & Tormo, Guillermina & Vicens, Eduardo & Garcia-Sabater, Jose Pedro, 2005. "Group technology in a hybrid flowshop environment: A case study," European Journal of Operational Research, Elsevier, vol. 167(1), pages 272-281, November.
  123. Aubry, A. & Rossi, A. & Espinouse, M.-L. & Jacomino, M., 2008. "Minimizing setup costs for parallel multi-purpose machines under load-balancing constraint," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1115-1125, June.
  124. Mohamed Amine Mkadem & Aziz Moukrim & Mehdi Serairi, 2021. "Exact method for the two-machine flow-shop problem with time delays," Annals of Operations Research, Springer, vol. 298(1), pages 375-406, March.