Effects of Project Cost Overruns and Schedule Delays in Sub-Saharan Africa

Author

Listed:
  • Paul Terna Gbahabo
  • Oluseye Samuel Ajuwon

Abstract

This paper provides conceptual insights on the economic impact of project cost overrun and schedule delays on infrastructure procurement in developing countries with huge infrastructure deficit in Sub-Saharan Africa. Projects cost overruns and schedule delay are a major and widespread problem in infrastructure procurement the world over. It has received a lot of attention in the recent past. However, the literature reveals that extant studies on project overruns are heavily skewed towards causative factors, with little or no attention to the effects it has on the economy as a whole. The paucity of studies on the effects of project cost overrun and schedule delay will further reinforce the imperative to reacquaint policymakers and infrastructure developers, as well as project financiers with the gravity and import of the problem for infrastructural development in particular and the wider economy in general. The study undertakes an exploratory approach drawing from a wide range of secondary information and materials obtained from policy documents, study reports and peer-reviewed articles. The findings show that cost overrun and schedule delay in infrastructure procurement can have a damaging economic effect ranging from allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation to project failure and total abandonment. The study recommends project management capacity-building for infrastructure developers, project managers as well as a number of innovative control mechanisms such as reference class forecasting, public-private partnership and computer-aided cost estimating tools including artificial neural networks, data mining, building information modelling as well as fuzzy neural inference model, genetic algorithms, and stochastic simulation to curb the menace of the problem.

Suggested Citation

  • Paul Terna Gbahabo & Oluseye Samuel Ajuwon, 2017. "Effects of Project Cost Overruns and Schedule Delays in Sub-Saharan Africa," European Journal of Interdisciplinary Studies Articles, European Center for Science Education and Research, vol. 3, EJIS Janu.
  • Handle: RePEc:eur:ejisjr:174
    as

    Download full text from publisher

    File URL: http://journals.euser.org/index.php/ejis/article/view/1842
    Download Restriction: no

    File URL: http://journals.euser.org/files/articles/ejis_jan_apr_17_nr_2/Paul.pdf
    Download Restriction: no

    References listed on IDEAS

    as
    1. Cantarelli, C.C. & Flyvbjerg, B. & Buhl, S.L., 2012. "Geographical variation in project cost performance: the Netherlands versus worldwide," Journal of Transport Geography, Elsevier, vol. 24(C), pages 324-331.
    2. Kahneman, Daniel & Tversky, Amos, 1979. "Prospect Theory: An Analysis of Decision under Risk," Econometrica, Econometric Society, vol. 47(2), pages 263-291, March.
    3. Bent Flyvbjerg & Mette K. Skamris holm & Søren L. Buhl, 2003. "How common and how large are cost overruns in transport infrastructure projects?," Transport Reviews, Taylor & Francis Journals, vol. 23(1), pages 71-88, January.
    4. Pena, Jorge & Orte, Manuel De & Guasch, J. Luis & Escribano, Álvaro, 2008. "Investment climate assessment based on demean Olley and Pakes decompositions: methodology and application to Turkey's investment climate survey," UC3M Working papers. Economics we082012, Universidad Carlos III de Madrid. Departamento de Economía.
    5. Bacon, Robert W & Besant-Jones, John E, 1998. "Estimating construction costs and schedules: Experience with power generation projects in developing countries," Energy Policy, Elsevier, vol. 26(4), pages 317-333, March.
    6. Bent Flyvbjerg, 2007. "Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures," Environment and Planning B, , vol. 34(4), pages 578-597, August.
    7. Frédéric Blanc-Brude & Hugh Goldsmith & Timo Välilä, 2009. "A Comparison of Construction Contract Prices for Traditionally Procured Roads and Public–Private Partnerships," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 35(1), pages 19-40, September.
    8. Ansar, Atif & Flyvbjerg, Bent & Budzier, Alexander & Lunn, Daniel, 2014. "Should we build more large dams? The actual costs of hydropower megaproject development," Energy Policy, Elsevier, vol. 69(C), pages 43-56.
    9. Odeck, James, 2004. "Cost overruns in road construction--what are their sizes and determinants?," Transport Policy, Elsevier, vol. 11(1), pages 43-53, January.
    10. Andrew Mold, 2012. "Will It All End In Tears? Infrastructure Spending And African Development In Historical Perspective," Journal of International Development, John Wiley & Sons, Ltd., vol. 24(2), pages 237-254, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Salhi Roumeissa, 2019. "Impact of Delay on Cost Overrun in Construction Projects in Algeria," European Journal of Interdisciplinary Studies Articles, European Center for Science Education and Research, vol. 5, EJIS May .

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dejan Makovšek & Marian Moszoro, 2018. "Risk pricing inefficiency in public–private partnerships," Transport Reviews, Taylor & Francis Journals, vol. 38(3), pages 298-321, May.
    2. Love, Peter E.D. & Ika, Lavagnon A. & Ahiaga-Dagbui, Dominic D., 2019. "On de-bunking ‘fake news’ in a post truth era: Why does the Planning Fallacy explanation for cost overruns fall short?," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 397-408.
    3. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
    4. Miranda Sarmento, J.J., 2014. "Public private partnerships," Other publications TiSEM c7d4c978-234c-4f88-83ed-1, Tilburg University, School of Economics and Management.
    5. Makovšek, Dejan, 2014. "Systematic construction risk, cost estimation mechanism and unit price movements," Transport Policy, Elsevier, vol. 35(C), pages 135-145.
    6. Cantarelli, C.C. & Flyvbjerg, B. & Buhl, S.L., 2012. "Geographical variation in project cost performance: the Netherlands versus worldwide," Journal of Transport Geography, Elsevier, vol. 24(C), pages 324-331.
    7. Verweij, Stefan & van Meerkerk, Ingmar & Korthagen, Iris A., 2015. "Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration," Transport Policy, Elsevier, vol. 37(C), pages 195-202.
    8. Chong, Uven & Hopkins, Omar, 2016. "An international experience on the evolution of road costs during the project life cycle," Transport Policy, Elsevier, vol. 48(C), pages 60-66.
    9. Petter Osmundsen & Kristin Helen Roll, 2016. "Rig Rates and Drilling Speed: Reinforcing Effects," CESifo Working Paper Series 5895, CESifo.
    10. Awojobi, Omotola & Jenkins, Glenn P., 2016. "Managing the cost overrun risks of hydroelectric dams: An application of reference class forecasting techniques," Renewable and Sustainable Energy Reviews, Elsevier, vol. 63(C), pages 19-32.
    11. Ansar, Atif & Flyvbjerg, Bent & Budzier, Alexander & Lunn, Daniel, 2014. "Should we build more large dams? The actual costs of hydropower megaproject development," Energy Policy, Elsevier, vol. 69(C), pages 43-56.
    12. C. Guccio & G. Pignataro & I. Rizzo, 2012. "Determinants of adaptation costs in procurement: an empirical estimation on Italian public works contracts," Applied Economics, Taylor & Francis Journals, vol. 44(15), pages 1891-1909, May.
    13. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D. & Irani, Zahir, 2016. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 184-194.
    14. Catalão, Francisco Pinheiro & Cruz, Carlos Oliveira & Sarmento, Joaquim Miranda, 2019. "The determinants of cost deviations and overruns in transport projects, an endogenous models approach," Transport Policy, Elsevier, vol. 74(C), pages 224-238.
    15. Cavalieri, Marina & Cristaudo, Rossana & Guccio, Calogero, 2019. "On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects," Transport Policy, Elsevier, vol. 79(C), pages 21-36.
    16. Øglend, Atle & Osmundsen, Petter & Lorentzen, Sindre, 2016. "Cost Overrun at the Norwegian Continental Shelf: The element of surprise," UiS Working Papers in Economics and Finance 2016/3, University of Stavanger.
    17. Love, Peter E.D. & Sing, Michael C.P. & Ika, Lavagnon A. & Newton, Sidney, 2019. "The cost performance of transportation projects: The fallacy of the Planning Fallacy account," Transportation Research Part A: Policy and Practice, Elsevier, vol. 122(C), pages 1-20.
    18. Steininger, Bertram & Groth, Martin & Weber, Birgitte, 2020. "Cost overruns and delays in infrastructure projects: the case of Stuttgart 21," Working Paper Series 20/11, Royal Institute of Technology, Department of Real Estate and Construction Management & Banking and Finance.
    19. Odeck, James, 2014. "Do reforms reduce the magnitudes of cost overruns in road projects? Statistical evidence from Norway," Transportation Research Part A: Policy and Practice, Elsevier, vol. 65(C), pages 68-79.
    20. Cantarelli, C.C. & van Wee, B. & Molin, E.J.E. & Flyvbjerg, B., 2012. "Different cost performance: different determinants?," Transport Policy, Elsevier, vol. 22(C), pages 88-95.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eur:ejisjr:174. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (European Center for Science Education and Research) The email address of this maintainer does not seem to be valid anymore. Please ask European Center for Science Education and Research to update the entry or send us the correct email address. General contact details of provider: http://journals.euser.org/index.php/ejis .

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service hosted by the Research Division of the Federal Reserve Bank of St. Louis . RePEc uses bibliographic data supplied by the respective publishers.