IDEAS home Printed from https://ideas.repec.org/a/taf/transr/v23y2003i1p71-88.html
   My bibliography  Save this article

How common and how large are cost overruns in transport infrastructure projects?

Author

Listed:
  • Bent Flyvbjerg
  • Mette K. Skamris holm
  • Søren L. Buhl

Abstract

Despite the hundreds of billions of dollars being spent on infrastructure development -- from roads, rail and airports to energy extraction and power networks to the Internet -- surprisingly little reliable knowledge exists about the performance of these investments in terms of actual costs, benefits and risks. This paper presents results from the first statistically significant study of cost performance in transport infrastructure projects. The sample used is the largest of its kind, covering 258 projects in 20 nations worth approximately US$90 billion (constant 1995 prices). The paper shows with overwhelming statistical significance that in terms of costs transport infrastructure projects do not perform as promised. The conclusion is tested for different project types, different geographical regions and different historical periods. Substantial cost escalation is the rule rather than the exception. For rail, average cost escalation is 45% (SD=38), for fixed links (tunnels and bridges) it is 34% (62) and for roads 20% (30). Cost escalation appears a global phenomenon, existing across 20 nations on five continents. Cost estimates have not improved and cost escalation not decreased over the past 70 years. Cost estimates used in decision-making for transport infrastructure development are highly, systematically and significantly misleading. Large cost escalations combined with large standard deviations translate into large financial risks. However, such risks are typically ignored or underplayed in decision-making, to the detriment of social and economic welfare.

Suggested Citation

  • Bent Flyvbjerg & Mette K. Skamris holm & Søren L. Buhl, 2003. "How common and how large are cost overruns in transport infrastructure projects?," Transport Reviews, Taylor & Francis Journals, vol. 23(1), pages 71-88, January.
  • Handle: RePEc:taf:transr:v:23:y:2003:i:1:p:71-88
    DOI: 10.1080/01441640309904
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01441640309904
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01441640309904?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Leavitt, Dan & Ennis, Sean & McGovern, Pat, 1993. "The Cost Escalation of Rail Projects: Using Previous Experience to Re-Evaluate the CalSpeed Estimates," University of California Transportation Center, Working Papers qt2rt1w7xj, University of California Transportation Center.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hugo Priemus & Bert van Wee (ed.), 2013. "International Handbook on Mega-Projects," Books, Edward Elgar Publishing, number 14791.
    2. Leavitt, Daniel & Cheng, Peter & Vaca, Erin & Hall, Peter, 1994. "Potential for Improved Intercity Passenger Rail Service in California: Study of Corridors," University of California Transportation Center, Working Papers qt3cn732tv, University of California Transportation Center.
    3. Bent Flyvbjerg & Mette K. Skamris Holm & Søren L. Buhl, 2005. "Inaccuracy in Traffic Forecasts," Transport Reviews, Taylor & Francis Journals, vol. 26(1), pages 1-24, April.
    4. Chantal C. Cantarelli & Bent Flyvbjerg, 2013. "Mega-projects’ cost performance and lock-in: problems and solutions," Chapters, in: Hugo Priemus & Bert van Wee (ed.), International Handbook on Mega-Projects, chapter 15, pages 333-355, Edward Elgar Publishing.
    5. Flyvbjerg, Bent & Bester, Dirk W., 2021. "The Cost-Benefit Fallacy: Why Cost-Benefit Analysis Is Broken and How to Fix It," Journal of Benefit-Cost Analysis, Cambridge University Press, vol. 12(3), pages 395-419, October.
    6. Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Lunn, Daniel & Molin, Eric & Rønnes, 2018. "Five things you should know about cost overrun," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 174-190.
    7. Catalão, Francisco Pinheiro & Cruz, Carlos Oliveira & Sarmento, Joaquim Miranda, 2019. "The determinants of cost deviations and overruns in transport projects, an endogenous models approach," Transport Policy, Elsevier, vol. 74(C), pages 224-238.
    8. Flyvbjerg, Bent & Holm, Mette Skamris & Buhl, Søren, 2006. "Underestimating Costs in Public Works Projects: Error or Lie?," University of California Transportation Center, Working Papers qt98r01936, University of California Transportation Center.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:transr:v:23:y:2003:i:1:p:71-88. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TTRV20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.