IDEAS home Printed from https://ideas.repec.org/p/tse/wpaper/27643.html
   My bibliography  Save this paper

Fred Schweppe meets Marcel Boiteux and Antoine-Augustin Cournot: transmission constraints and strategic underinvestment in electric power generation

Author

Listed:
  • Léautier, Thomas-Olivier

Abstract

This article examines imperfectly competitive investment in electric power generation in the presence of congestion on the transmission grid. Under simple yet realistic assumptions, it precisely derives the technology mix as a function of the capacity of the transmission interconnection. In particular, it finds that, if the interconnection is congested in one direction only, the cumulative capacity is not affected by the congestion, while the baseload capacity is simply the uncongested baseload capacity, weighted by the size of its domestic market, plus the interconnection capacity. If the interconnection is successively congested in both directions, the peaking capacity is the cumulative uncongested capacity, weighted by the size its domestic market, plus the capacity of the interconnection, while the baseload capacity is the solution of a simple first-order condition. The marginal value of interconnection capacity is shown to generalize the expression obtained under perfect competition. It includes both a short-term component, that captures the reduction in marginal cost from substituting cheaper for more expensive power, but also a long-term component, that captures the change in installed capacity. Finally, increasing interconnection is shown to have an ambiguous impact on producers' profits. For example, if the interconnection is congested in one direction only, increasing capacity increases a monopolist profit. On the other hand, if the line is almost not congested, it reduces oligopolists' profits.

Suggested Citation

  • Léautier, Thomas-Olivier, 2013. "Fred Schweppe meets Marcel Boiteux and Antoine-Augustin Cournot: transmission constraints and strategic underinvestment in electric power generation," TSE Working Papers 13-432, Toulouse School of Economics (TSE).
  • Handle: RePEc:tse:wpaper:27643
    as

    Download full text from publisher

    File URL: http://www.tse-fr.eu/sites/default/files/medias/doc/wp/io/wp_tse_432.pdf
    File Function: Full text
    Download Restriction: no
    ---><---

    Other versions of this item:

    References listed on IDEAS

    as
    1. Paul Joskow & Jean Tirole, 2007. "Reliability and competitive electricity markets," RAND Journal of Economics, RAND Corporation, vol. 38(1), pages 60-84, March.
    2. Kathleen Spees & Samuel A. Newell & Johannes P. Pfeifenberger, 2013. "Capacity Markets - Lessons Learned from the First Decade," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
    3. Paul L. Joskow, 2008. "Lessons Learned from Electricity Market Liberalization," The Energy Journal, International Association for Energy Economics, vol. 0(Special I), pages 9-42.
    4. Severin Borenstein & James. Bushnell & Steven Stoft, 2000. "The Competitive Effects of Transmission Capacity in A Deregulated Electricity Industry," RAND Journal of Economics, The RAND Corporation, vol. 31(2), pages 294-325, Summer.
    5. Ruderer, D., 2012. "The Impact of Transmission Pricing in Network Industries," Cambridge Working Papers in Economics 1230, Faculty of Economics, University of Cambridge.
    6. Leautier, Thomas-Olivier, 2001. "Transmission Constraints and Imperfect Markets for Power," Journal of Regulatory Economics, Springer, vol. 19(1), pages 27-54, January.
    7. Cardell, Judith B. & Hitt, Carrie Cullen & Hogan, William W., 1997. "Market power and strategic interaction in electricity networks," Resource and Energy Economics, Elsevier, vol. 19(1-2), pages 109-137, March.
    8. Michael A. Crew & Paul R. Kleindorfer, 1976. "Peak Load Pricing with a Diverse Technology," Bell Journal of Economics, The RAND Corporation, vol. 7(1), pages 207-231, Spring.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Alexander Zerrahn & Daniel Huppmann, 2017. "Network Expansion to Mitigate Market Power," Networks and Spatial Economics, Springer, vol. 17(2), pages 611-644, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Léautier, Thomas-Olivier, 2014. "Transmission constraints and strategic underinvestment in electric power generation," IDEI Working Papers 816, Institut d'Économie Industrielle (IDEI), Toulouse.
    2. Grimm, Veronika & Martin, Alexander & Schmidt, Martin & Weibelzahl, Martin & Zöttl, Gregor, 2016. "Transmission and generation investment in electricity markets: The effects of market splitting and network fee regimes," European Journal of Operational Research, Elsevier, vol. 254(2), pages 493-509.
    3. Poletti, Steve, 2009. "Government procurement of peak capacity in the New Zealand electricity market," Energy Policy, Elsevier, vol. 37(9), pages 3409-3417, September.
    4. Keppler, Jan Horst & Quemin, Simon & Saguan, Marcelo, 2022. "Why the sustainable provision of low-carbon electricity needs hybrid markets," Energy Policy, Elsevier, vol. 171(C).
    5. Boom, Anette, 2009. "Vertically integrated firms' investments in electricity generating capacities," International Journal of Industrial Organization, Elsevier, vol. 27(4), pages 544-551, July.
    6. Sertaç Oruç & Scott Cunningham, 2014. "Transmission Rights to the Electrical Transmission Grid in the Post Liberalization Era," Journal of the Knowledge Economy, Springer;Portland International Center for Management of Engineering and Technology (PICMET), vol. 5(4), pages 686-705, December.
    7. Bhagwat, Pradyumna C. & Richstein, Jörn C. & Chappin, Emile J.L. & de Vries, Laurens J., 2016. "The effectiveness of a strategic reserve in the presence of a high portfolio share of renewable energy sources," Utilities Policy, Elsevier, vol. 39(C), pages 13-28.
    8. Bhagwat, Pradyumna C. & de Vries, Laurens J. & Hobbs, Benjamin F., 2016. "Expert survey on capacity markets in the US: Lessons for the EU," Utilities Policy, Elsevier, vol. 38(C), pages 11-17.
    9. SMEERS, Yves, 2005. "How well can one measure market power in restructured electricity systems ?," LIDAM Discussion Papers CORE 2005050, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    10. Leuthold, Florian & Jeske, Till & Weigt, Hannes & von Hirschhausen, Christian, 2009. "When the Wind Blows Over Europe: A Simulation Analysis and the Impact of Grid Extensions," MPRA Paper 65655, University Library of Munich, Germany.
    11. Holmberg, Pär & Tangerås, Thomas, 2021. "Strategic Reserves versus Market-wide Capacity Mechanisms," Working Paper Series 1387, Research Institute of Industrial Economics.
    12. Grimm, Veronika & Martin, Alexander & Weibelzahl, Martin & Zöttl, Gregor, 2014. "Transmission and Generation Investment in Electricity Markets: The Effects of Market Splitting and Network Fee Regimes," Discussion Paper Series of SFB/TR 15 Governance and the Efficiency of Economic Systems 460, Free University of Berlin, Humboldt University of Berlin, University of Bonn, University of Mannheim, University of Munich.
    13. Gasmi, Farid & Oviedo, Juan Daniel, 2010. "Investment in transport infrastructure, regulation, and gas-gas competition," Energy Economics, Elsevier, vol. 32(3), pages 726-736, May.
    14. Bhagwat, Pradyumna C. & Richstein, Jörn C. & Chappin, Emile J.L. & Iychettira, Kaveri K. & De Vries, Laurens J., 2017. "Cross-border effects of capacity mechanisms in interconnected power systems," Utilities Policy, Elsevier, vol. 46(C), pages 33-47.
    15. Grimm, Veronika & Martin, Alexander & Weibenzahl, Martin & Zoettl, Gregor, 2014. "Transmission and generation investment in electricity markets: The effects of market splitting and network fee regimes," FAU Discussion Papers in Economics 04/2014, Friedrich-Alexander University Erlangen-Nuremberg, Institute for Economics.
    16. Neuhoff, Karsten & Barquin, Julian & Boots, Maroeska G. & Ehrenmann, Andreas & Hobbs, Benjamin F. & Rijkers, Fieke A.M. & Vazquez, Miguel, 2005. "Network-constrained Cournot models of liberalized electricity markets: the devil is in the details," Energy Economics, Elsevier, vol. 27(3), pages 495-525, May.
    17. Growitsch, Christian & Just, Lisa & Pedell, Burkhard, 2014. "Risk Assessment of Investments in Energy-only and Capacity Markets," Die Unternehmung - Swiss Journal of Business Research and Practice, Nomos Verlagsgesellschaft mbH & Co. KG, vol. 68(3), pages 181-188.
    18. Thomas-Olivier Léautier & Véronique Thelen, 2009. "Optimal expansion of the power transmission grid: why not?," Journal of Regulatory Economics, Springer, vol. 36(2), pages 127-153, October.
    19. Andreas Ehrenmann & Karsten Neuhoff, 2009. "A Comparison of Electricity Market Designs in Networks," Operations Research, INFORMS, vol. 57(2), pages 274-286, April.
    20. Browne, Oliver & Poletti, Stephen & Young, David, 2015. "How does market power affect the impact of large scale wind investment in 'energy only' wholesale electricity markets?," Energy Policy, Elsevier, vol. 87(C), pages 17-27.

    More about this item

    JEL classification:

    • D61 - Microeconomics - - Welfare Economics - - - Allocative Efficiency; Cost-Benefit Analysis
    • L11 - Industrial Organization - - Market Structure, Firm Strategy, and Market Performance - - - Production, Pricing, and Market Structure; Size Distribution of Firms
    • L94 - Industrial Organization - - Industry Studies: Transportation and Utilities - - - Electric Utilities

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:tse:wpaper:27643. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: the person in charge (email available below). General contact details of provider: https://edirc.repec.org/data/tsetofr.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.