IDEAS home Printed from https://ideas.repec.org/e/pva62.html
   My authors  Follow this author

Wilco van den Heuvel

Personal Details

First Name:Wilco
Middle Name:
Last Name:van den Heuvel
Suffix:
RePEc Short-ID:pva62
http://www.few.eur.nl/few/people/wvandenheuvel/
Terminal Degree:2006 Econometrisch Instituut; Faculteit der Economische Wetenschappen; Erasmus Universiteit Rotterdam (from RePEc Genealogy)

Affiliation

Econometrisch Instituut
Faculteit der Economische Wetenschappen
Erasmus Universiteit Rotterdam

Rotterdam, Netherlands
http://www.econometric-institute.org/

: 010 - 40 81278
010 - 40 89162
Burgemeester Oudlaan 50, 3062 PA Rotterdam
RePEc:edi:eieurnl (more details at EDIRC)

Research output

as
Jump to: Working papers Articles

Working papers

  1. Kerkkamp, R.B.O. & van den Heuvel, W. & Wagelmans, A.P.M., 2018. "Two-Echelon Lot-Sizing with Asymmetric Information and Continuous Type Space," Econometric Institute Research Papers EI2018-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  2. Franses, Ph.H.B.F. & van den Heuvel, W., 2018. "Aggregate statistics on trafficker-destination relations in the Atlantic slave trade," Econometric Institute Research Papers EI2018-21, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  3. Kerkkamp, R.B.O. & van den Heuvel, W. & Wagelmans, A.P.M., 2018. "Balancing Expected and Worst-Case Utility in Contracting Models with Asymmetric Information and Pooling," Econometric Institute Research Papers EI 2018-01, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  4. Kerkkamp, R.B.O. & van den Heuvel, W. & Wagelmans, A.P.M., 2017. "Robust Pooling for Contracting Models with Asymmetric Information," Econometric Institute Research Papers EI2017-10, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  5. Kerkkamp, R.B.O. & van den Heuvel, W. & Wagelmans, A.P.M., 2016. "Two-echelon supply chain coordination under information asymmetry with multiple types," Econometric Institute Research Papers EI-2016-18, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  6. Breugem, T. & Dollevoet, T.A.B. & van den Heuvel, W., 2016. "Analysis of FPTASes for the Multi-Objective Shortest Path Problem," Econometric Institute Research Papers EI2016-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  7. Mobini, Z. & van den Heuvel, W. & Wagelmans, A.P.M., 2014. "Designing multi-period supply contracts in a two-echelon supply chain with asymmetric information," Econometric Institute Research Papers EI2014-28, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  8. Onal, M. & van den Heuvel, W.J. & Liu, T., 2012. "A note on "The Economic Lot Sizing Problem with Inventory Bounds"," Econometric Institute Research Papers EI 2012-04, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  9. Romeijn, H.E. & van den Heuvel, W.J. & Geunes, J., 2012. "Mitigating the Cost of Anarchy in Supply Chain Systems," Econometric Institute Research Papers EI 2012-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  10. Retel Helmrich, M. & Jans, R.F. & van den Heuvel, W. & Wagelmans, A.P.M., 2012. "The Economic Lot-Sizing Problem with an Emission Constraint," Econometric Institute Research Papers EI 2011-41, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  11. van den Heuvel, W. & Gutierrez, J.M. & Hwang, H.C., 2011. "Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities"," Econometric Institute Research Papers EI 2011-39, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  12. Retel Helmrich, M. & Jans, R.F. & van den Heuvel, W.J. & Wagelmans, A.P.M., 2010. "Economic lot-sizing with remanufacturing: complexity and efficient formulations," Econometric Institute Research Papers EI 2010-71, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  13. Hwang, H.C. & van den Heuvel, W., 2010. "Improved Algorithms for a Lot-Sizing Problem with Inventory Bounds and Backlogging," Econometric Institute Research Papers EI 2010-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  14. van den Heuvel, W.J. & Wagelmans, A.P.M., 2008. "A holding cost bound for the economic lot-sizing problem with time-invariant cost parameters," Econometric Institute Research Papers EI 2008-10, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  15. van den Heuvel, W. & Wagelmans, A.P.M., 2007. "Worst case analysis for a general class of on-line lot-sizing heuristics," Econometric Institute Research Papers EI 2007-46, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  16. van den Heuvel, W. & Romeijn, H.E. & Wagelmans, A.P.M. & Kundakcioglu, O.E., 2007. "Integrated market selection and production planning: complexity and solution approaches," Econometric Institute Research Papers EI 2007-45, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  17. van den Heuvel, W. & Wagelmans, A.P.M., 2007. "Four equivalent lot-sizing models," Econometric Institute Research Papers EI 2007-30, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  18. Teunter, R.H. & Bayindir, Z.P. & van den Heuvel, W., 2005. "Dynamic lot sizing with product returns," Econometric Institute Research Papers EI 2005-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  19. van den Heuvel, W. & Borm, P.E.M. & Hamers, H.J.M., 2004. "Economic Lot-Sizing Games," ERIM Report Series Research in Management ERS-2004-088-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  20. van den Heuvel, W., 2004. "On the complexity of the economic lot-sizing problem with remanufacturing options," Econometric Institute Research Papers EI 2004-46, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  21. van den Heuvel, W. & Wagelmans, A.P.M., 2003. "A Geometric Algorithm to solve the NI/G/NI/ND Capacitated Lot-Sizing Problem in O(T^2) Time," ERIM Report Series Research in Management ERS-2003-066-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  22. van den Heuvel, W. & Wagelmans, A.P.M., 2003. "A note on a multi-period profit maximizing model for retail supply chain management," ERIM Report Series Research in Management ERS-2003-072-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  23. van den Heuvel, W. & Wagelmans, A.P.M., 2003. "A Polynomial Time Algorithm for a Deterministic Joint Pricing and Inventory Model," ERIM Report Series Research in Management ERS-2003-065-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  24. André van Stel & Shaastie Dielbandhoesing & David Storey & Wilco Heuvel van den, 2002. "Startup activity and employment growth in regions," Scales Research Reports H200108, EIM Business and Policy Research.
  25. van den Heuvel, W. & Wagelmans, A.P.M., 2002. "A Note on Ending Inventory Valuation in Multiperiod Production Scheduling," ERIM Report Series Research in Management ERS-2002-63-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.

Articles

  1. van den Heuvel, Wilco & Wagelmans, Albert P.M., 2017. "A note on “A multi-period profit maximizing model for retail supply chain management”," European Journal of Operational Research, Elsevier, vol. 260(2), pages 625-630.
  2. Geunes, Joseph & Romeijn, H. Edwin & van den Heuvel, Wilco, 2016. "Improving the efficiency of decentralized supply chains with fixed ordering costs," European Journal of Operational Research, Elsevier, vol. 252(3), pages 815-828.
  3. Retel Helmrich, Mathijn J. & Jans, Raf & van den Heuvel, Wilco & Wagelmans, Albert P.M., 2015. "The economic lot-sizing problem with an emission capacity constraint," European Journal of Operational Research, Elsevier, vol. 241(1), pages 50-62.
  4. Naber, S.K. & de Ree, D.A. & Spliet, R. & van den Heuvel, W., 2015. "Allocating CO2 emission to customers on a distribution route," Omega, Elsevier, vol. 54(C), pages 191-199.
  5. Önal, Mehmet & Romeijn, H.Edwin & Sapra, Amar & van den Heuvel, Wilco, 2015. "The economic lot-sizing problem with perishable items and consumption order preference," European Journal of Operational Research, Elsevier, vol. 244(3), pages 881-891.
  6. Önal, Mehmet & van den Heuvel, Wilco & Liu, Tieming, 2012. "A note on “The economic lot sizing problem with inventory bounds”," European Journal of Operational Research, Elsevier, vol. 223(1), pages 290-294.
  7. van den Heuvel, Wilco & Gutiérrez, José Miguel & Hwang, Hark-Chin, 2011. "Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities"," European Journal of Operational Research, Elsevier, vol. 213(2), pages 455-457, September.
  8. Wilco Van den Heuvel & Albert P. M. Wagelmans, 2010. "Worst-Case Analysis for a General Class of Online Lot-Sizing Heuristics," Operations Research, INFORMS, vol. 58(1), pages 59-67, February.
  9. Heuvel, Wilco van den & Borm, Peter & Hamers, Herbert, 2007. "Economic lot-sizing games," European Journal of Operational Research, Elsevier, vol. 176(2), pages 1117-1130, January.
  10. van den Heuvel, Wilco & Wagelmans, Albert P.M., 2006. "A polynomial time algorithm for a deterministic joint pricing and inventory model," European Journal of Operational Research, Elsevier, vol. 170(2), pages 463-480, April.

Citations

Many of the citations below have been collected in an experimental project, CitEc, where a more detailed citation analysis can be found. These are citations from works listed in RePEc that could be analyzed mechanically. So far, only a minority of all works could be analyzed. See under "Corrections" how you can help improve the citation analysis.

Working papers

  1. Onal, M. & van den Heuvel, W.J. & Liu, T., 2012. "A note on "The Economic Lot Sizing Problem with Inventory Bounds"," Econometric Institute Research Papers EI 2012-04, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Cited by:

    1. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.

  2. Retel Helmrich, M. & Jans, R.F. & van den Heuvel, W. & Wagelmans, A.P.M., 2012. "The Economic Lot-Sizing Problem with an Emission Constraint," Econometric Institute Research Papers EI 2011-41, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Cited by:

    1. Akbalik, Ayse & Rapine, Christophe, 2013. "The single item uncapacitated lot-sizing problem with time-dependent batch sizes: NP-hard and polynomial cases," European Journal of Operational Research, Elsevier, vol. 229(2), pages 353-363.
    2. Palak, Gökçe & Ekşioğlu, Sandra Duni & Geunes, Joseph, 2014. "Analyzing the impacts of carbon regulatory mechanisms on supplier and mode selection decisions: An application to a biofuel supply chain," International Journal of Production Economics, Elsevier, vol. 154(C), pages 198-216.

  3. van den Heuvel, W. & Gutierrez, J.M. & Hwang, H.C., 2011. "Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities"," Econometric Institute Research Papers EI 2011-39, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Cited by:

    1. Hwang, H.C. & van den Heuvel, W., 2010. "Improved Algorithms for a Lot-Sizing Problem with Inventory Bounds and Backlogging," Econometric Institute Research Papers EI 2010-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

  4. Retel Helmrich, M. & Jans, R.F. & van den Heuvel, W.J. & Wagelmans, A.P.M., 2010. "Economic lot-sizing with remanufacturing: complexity and efficient formulations," Econometric Institute Research Papers EI 2010-71, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Cited by:

    1. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.

  5. Hwang, H.C. & van den Heuvel, W., 2010. "Improved Algorithms for a Lot-Sizing Problem with Inventory Bounds and Backlogging," Econometric Institute Research Papers EI 2010-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Cited by:

    1. Wolsey, L.A., 2015. "Uncapacitated Lot-Sizing with Stock Upper Bounds, Stock Fixed Costs, Stock Overloads and Backlogging: A Tight Formulation," CORE Discussion Papers 2015041, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    2. Belleflamme, P., 2015. "Monopoly price discrimination and privacy: the hidden cost of hiding," CORE Discussion Papers 2015042, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    3. Onal, M. & van den Heuvel, W.J. & Liu, T., 2012. "A note on "The Economic Lot Sizing Problem with Inventory Bounds"," Econometric Institute Research Papers EI 2012-04, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    4. Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.

  6. van den Heuvel, W. & Wagelmans, A.P.M., 2007. "Worst case analysis for a general class of on-line lot-sizing heuristics," Econometric Institute Research Papers EI 2007-46, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Cited by:

    1. van den Heuvel, W.J. & Wagelmans, A.P.M., 2008. "A holding cost bound for the economic lot-sizing problem with time-invariant cost parameters," Econometric Institute Research Papers EI 2008-10, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    3. Jens Leoff & Heiner Ackermann & Karl-Heinz Küfer, 2016. "Time-hierarchical scheduling," Journal of Scheduling, Springer, vol. 19(3), pages 215-225, June.

  7. van den Heuvel, W. & Romeijn, H.E. & Wagelmans, A.P.M. & Kundakcioglu, O.E., 2007. "Integrated market selection and production planning: complexity and solution approaches," Econometric Institute Research Papers EI 2007-45, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Cited by:

    1. Leonid Mylnikov & Martin Kuetz, 2017. "The Risk Assessment Method in Prognostic Models of Production Systems Management with Account of the Time Factor," European Research Studies Journal, European Research Studies Journal, vol. 0(3A), pages 291-310.
    2. Drechsel, J. & Kimms, A., 2010. "Computing core allocations in cooperative games with an application to cooperative procurement," International Journal of Production Economics, Elsevier, vol. 128(1), pages 310-321, November.

  8. van den Heuvel, W. & Wagelmans, A.P.M., 2007. "Four equivalent lot-sizing models," Econometric Institute Research Papers EI 2007-30, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Cited by:

    1. Zhang, Zhi-Hai & Jiang, Hai & Pan, Xunzhang, 2012. "A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 140(1), pages 249-255.
    2. Wolsey, L.A., 2015. "Uncapacitated Lot-Sizing with Stock Upper Bounds, Stock Fixed Costs, Stock Overloads and Backlogging: A Tight Formulation," CORE Discussion Papers 2015041, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    3. Belleflamme, P., 2015. "Monopoly price discrimination and privacy: the hidden cost of hiding," CORE Discussion Papers 2015042, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    4. Hwang, H.C., 2009. "Economic Lot-Sizing Problem with Bounded Inventory and Lost-Sales," Econometric Institute Research Papers EI 2009-01, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    5. Hwang, H.C. & van den Heuvel, W., 2010. "Improved Algorithms for a Lot-Sizing Problem with Inventory Bounds and Backlogging," Econometric Institute Research Papers EI 2010-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    6. Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.

  9. Teunter, R.H. & Bayindir, Z.P. & van den Heuvel, W., 2005. "Dynamic lot sizing with product returns," Econometric Institute Research Papers EI 2005-17, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Cited by:

    1. Atamer, Büşra & Bakal, İsmail S. & Bayındır, Z. Pelin, 2013. "Optimal pricing and production decisions in utilizing reusable containers," International Journal of Production Economics, Elsevier, vol. 143(2), pages 222-232.
    2. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    3. Abdelkader Sbihi & Richard Eglese, 2010. "Combinatorial optimization and Green Logistics," Annals of Operations Research, Springer, vol. 175(1), pages 159-175, March.
    4. Retel Helmrich, M. & Jans, R.F. & van den Heuvel, W.J. & Wagelmans, A.P.M., 2010. "Economic lot-sizing with remanufacturing: complexity and efficient formulations," Econometric Institute Research Papers EI 2010-71, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    5. Kim, Eungab & Saghafian, Soroush & Van Oyen, Mark P., 2013. "Joint control of production, remanufacturing, and disposal activities in a hybrid manufacturing–remanufacturing system," European Journal of Operational Research, Elsevier, vol. 231(2), pages 337-348.
    6. Piñeyro, Pedro & Viera, Omar, 2010. "The economic lot-sizing problem with remanufacturing and one-way substitution," International Journal of Production Economics, Elsevier, vol. 124(2), pages 482-488, April.

  10. van den Heuvel, W. & Borm, P.E.M. & Hamers, H.J.M., 2004. "Economic Lot-Sizing Games," ERIM Report Series Research in Management ERS-2004-088-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.

    Cited by:

    1. van den Heuvel, W. & Wagelmans, A.P.M., 2002. "A Note on Ending Inventory Valuation in Multiperiod Production Scheduling," ERIM Report Series Research in Management ERS-2002-63-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    2. Li, Jun & Feng, Hairong & Zeng, Yinlian, 2014. "Inventory games with permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 234(3), pages 694-700.
    3. Esmaeili, M. & Aryanezhad, Mir-Bahador & Zeephongsekul, P., 2009. "A game theory approach in seller-buyer supply chain," European Journal of Operational Research, Elsevier, vol. 195(2), pages 442-448, June.
    4. Esmaeili, M. & Zeephongsekul, P., 2010. "Seller-buyer models of supply chain management with an asymmetric information structure," International Journal of Production Economics, Elsevier, vol. 123(1), pages 146-154, January.
    5. Retel Helmrich, M. & Jans, R.F. & van den Heuvel, W. & Wagelmans, A.P.M., 2012. "The Economic Lot-Sizing Problem with an Emission Constraint," Econometric Institute Research Papers EI 2011-41, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    6. Nguyen, Christine & Dessouky, Maged & Toriello, Alejandro, 2014. "Consolidation strategies for the delivery of perishable products," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 69(C), pages 108-121.
    7. Retel Helmrich, M. & Jans, R.F. & van den Heuvel, W.J. & Wagelmans, A.P.M., 2010. "Economic lot-sizing with remanufacturing: complexity and efficient formulations," Econometric Institute Research Papers EI 2010-71, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    8. Loe Schlicher & Marco Slikker & Geert-Jan Houtum, 2018. "Pooling of critical, low-utilization resources with unavailability," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(1), pages 233-263, January.
    9. Körpeoğlu, Evren & Şen, Alper & Güler, Kemal, 2013. "Non-cooperative joint replenishment under asymmetric information," European Journal of Operational Research, Elsevier, vol. 227(3), pages 434-443.
    10. LAMAS, ALEJANDRO & CHEVALIER, Philippe, 2013. "Jumping the hurdles for collaboration: fairness in operations pooling in the absence of transfer payments," CORE Discussion Papers 2013073, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    11. Fiestras-Janeiro, M.G. & García-Jurado, I. & Meca, A. & Mosquera, M.A., 2011. "Cooperative game theory and inventory management," European Journal of Operational Research, Elsevier, vol. 210(3), pages 459-466, May.
    12. Drechsel, J. & Kimms, A., 2010. "Computing core allocations in cooperative games with an application to cooperative procurement," International Journal of Production Economics, Elsevier, vol. 128(1), pages 310-321, November.
    13. Palak, Gökçe & Ekşioğlu, Sandra Duni & Geunes, Joseph, 2014. "Analyzing the impacts of carbon regulatory mechanisms on supplier and mode selection decisions: An application to a biofuel supply chain," International Journal of Production Economics, Elsevier, vol. 154(C), pages 198-216.
    14. Uhan, Nelson A., 2015. "Stochastic linear programming games with concave preferences," European Journal of Operational Research, Elsevier, vol. 243(2), pages 637-646.
    15. Hezarkhani, Behzad & Slikker, Marco & Van Woensel, Tom, 2018. "Collaborative replenishment in the presence of intermediaries," European Journal of Operational Research, Elsevier, vol. 266(1), pages 135-146.
    16. van den Heuvel, W. & Wagelmans, A.P.M., 2007. "Four equivalent lot-sizing models," Econometric Institute Research Papers EI 2007-30, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    17. Günter Fandel & Jan Trockel, 2016. "Investment and lot size planning in a supply chain: coordinating a just-in-time-delivery with a Harris- or a Wagner/Whitin-solution," Journal of Business Economics, Springer, vol. 86(1), pages 173-195, January.

  11. van den Heuvel, W., 2004. "On the complexity of the economic lot-sizing problem with remanufacturing options," Econometric Institute Research Papers EI 2004-46, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Cited by:

    1. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    2. Abdelkader Sbihi & Richard Eglese, 2010. "Combinatorial optimization and Green Logistics," Annals of Operations Research, Springer, vol. 175(1), pages 159-175, March.
    3. Piñeyro, Pedro & Viera, Omar, 2010. "The economic lot-sizing problem with remanufacturing and one-way substitution," International Journal of Production Economics, Elsevier, vol. 124(2), pages 482-488, April.

  12. van den Heuvel, W. & Wagelmans, A.P.M., 2003. "A Geometric Algorithm to solve the NI/G/NI/ND Capacitated Lot-Sizing Problem in O(T^2) Time," ERIM Report Series Research in Management ERS-2003-066-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.

    Cited by:

    1. Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.

  13. van den Heuvel, W. & Wagelmans, A.P.M., 2003. "A Polynomial Time Algorithm for a Deterministic Joint Pricing and Inventory Model," ERIM Report Series Research in Management ERS-2003-065-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.

    Cited by:

    1. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    2. Geunes, Joseph & Merzifonluoglu, Yasemin & Romeijn, H. Edwin, 2009. "Capacitated procurement planning with price-sensitive demand and general concave-revenue functions," European Journal of Operational Research, Elsevier, vol. 194(2), pages 390-405, April.
    3. W K Chiang & Y Feng, 2010. "Retailer or e-tailer? Strategic pricing and economic-lot-size decisions in a competitive supply chain with drop-shipping," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(11), pages 1645-1653, November.
    4. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    5. Bajwa, Naeem & Sox, Charles R. & Ishfaq, Rafay, 2016. "Coordinating pricing and production decisions for multiple products," Omega, Elsevier, vol. 64(C), pages 86-101.
    6. Awi Federgruen & Joern Meissner, 2004. "Competition under Time-Varying Demands and Dynamic Lot-Sizing Costs," Working Papers MRG/0003, Department of Management Science, Lancaster University, revised May 2008.
    7. Shiming Deng & Candace A. Yano, 2006. "Joint Production and Pricing Decisions with Setup Costs and Capacity Constraints," Management Science, INFORMS, vol. 52(5), pages 741-756, May.
    8. van den Heuvel, W. & Romeijn, H.E. & Wagelmans, A.P.M. & Kundakcioglu, O.E., 2007. "Integrated market selection and production planning: complexity and solution approaches," Econometric Institute Research Papers EI 2007-45, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    9. Wu, Xiang & (Yale) Gong, Yeming & Xu, Haoxuan & Chu, Chengbin & Zhang, Jinlong, 2017. "Dynamic lot-sizing models with pricing for new products," European Journal of Operational Research, Elsevier, vol. 260(1), pages 81-92.

Articles

  1. Retel Helmrich, Mathijn J. & Jans, Raf & van den Heuvel, Wilco & Wagelmans, Albert P.M., 2015. "The economic lot-sizing problem with an emission capacity constraint," European Journal of Operational Research, Elsevier, vol. 241(1), pages 50-62.

    Cited by:

    1. Janssen, Larissa & Claus, Thorsten & Sauer, Jürgen, 2016. "Literature review of deteriorating inventory models by key topics from 2012 to 2015," International Journal of Production Economics, Elsevier, vol. 182(C), pages 86-112.
    2. Hong, Zhaofu & Chu, Chengbin & Yu, Yugang, 2016. "Dual-mode production planning for manufacturing with emission constraints," European Journal of Operational Research, Elsevier, vol. 251(1), pages 96-106.
    3. Wang, X.J. & Choi, S.H., 2015. "Stochastic lot sizing manufacturing under the ETS system for maximisation of shareholder wealth," European Journal of Operational Research, Elsevier, vol. 246(1), pages 66-75.
    4. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    5. Dai, Rui & Zhang, Jianxiong, 2017. "Green process innovation and differentiated pricing strategies with environmental concerns of South-North markets," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 98(C), pages 132-150.
    6. Akbalik, Ayse & Hadj-Alouane, Atidel B. & Sauer, Nathalie & Ghribi, Houcem, 2017. "NP-hard and polynomial cases for the single-item lot sizing problem with batch ordering under capacity reservation contract," European Journal of Operational Research, Elsevier, vol. 257(2), pages 483-493.
    7. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    8. Barbosa-Póvoa, Ana Paula & da Silva, Cátia & Carvalho, Ana, 2018. "Opportunities and challenges in sustainable supply chain: An operations research perspective," European Journal of Operational Research, Elsevier, vol. 268(2), pages 399-431.
    9. Absi, Nabil & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Penz, Bernard & Rapine, Christophe, 2016. "The single-item green lot-sizing problem with fixed carbon emissions," European Journal of Operational Research, Elsevier, vol. 248(3), pages 849-855.
    10. Konur, Dinçer, 2017. "Non-collaborative emission targets joining and quantity flow decisions in a Stackelberg setting," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 105(C), pages 60-82.
    11. Schaefer, Brian & Konur, Dinçer, 2015. "Economic and environmental considerations in a continuous review inventory control system with integrated transportation decisions," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 80(C), pages 142-165.
    12. Konur, Dinçer & Campbell, James F. & Monfared, Sepideh A., 2017. "Economic and environmental considerations in a stochastic inventory control model with order splitting under different delivery schedules among suppliers," Omega, Elsevier, vol. 71(C), pages 46-65.
    13. Bouchery, Yann & Ghaffari, Asma & Jemai, Zied & Tan, Tarkan, 2017. "Impact of coordination on costs and carbon emissions for a two-echelon serial economic order quantity problem," European Journal of Operational Research, Elsevier, vol. 260(2), pages 520-533.
    14. Silbermayr, Lena & Jammernegg, Werner & Kischka, Peter, 2017. "Inventory pooling with environmental constraints using copulas," European Journal of Operational Research, Elsevier, vol. 263(2), pages 479-492.

  2. Naber, S.K. & de Ree, D.A. & Spliet, R. & van den Heuvel, W., 2015. "Allocating CO2 emission to customers on a distribution route," Omega, Elsevier, vol. 54(C), pages 191-199.

    Cited by:

    1. Yu-Chung Tsao & Vu-Thuy Linh & Jye-Chyi Lu & Vincent Yu, 2018. "A supply chain network with product remanufacturing and carbon emission considerations: a two-phase design," Journal of Intelligent Manufacturing, Springer, vol. 29(3), pages 693-705, March.
    2. Kellner, Florian, 2016. "Allocating greenhouse gas emissions to shipments in road freight transportation: Suggestions for a global carbon accounting standard," Energy Policy, Elsevier, vol. 98(C), pages 565-575.
    3. Yu-Chung Tsao & Vu-Thuy Linh & Jye-Chyi Lu & Vincent Yu, 0. "A supply chain network with product remanufacturing and carbon emission considerations: a two-phase design," Journal of Intelligent Manufacturing, Springer, vol. 0, pages 1-13.
    4. Dahlberg, Joen & Göthe-Lundgren, Maud & Engevall, Stefan, 2017. "A note on the nonuniqueness of the Equal Profit Method," Applied Mathematics and Computation, Elsevier, vol. 308(C), pages 84-89.

  3. Önal, Mehmet & Romeijn, H.Edwin & Sapra, Amar & van den Heuvel, Wilco, 2015. "The economic lot-sizing problem with perishable items and consumption order preference," European Journal of Operational Research, Elsevier, vol. 244(3), pages 881-891.

    Cited by:

    1. Janssen, Larissa & Claus, Thorsten & Sauer, Jürgen, 2016. "Literature review of deteriorating inventory models by key topics from 2012 to 2015," International Journal of Production Economics, Elsevier, vol. 182(C), pages 86-112.
    2. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    3. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    4. Absi, Nabil & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Penz, Bernard & Rapine, Christophe, 2016. "The single-item green lot-sizing problem with fixed carbon emissions," European Journal of Operational Research, Elsevier, vol. 248(3), pages 849-855.
    5. Konur, Dinçer, 2017. "Non-collaborative emission targets joining and quantity flow decisions in a Stackelberg setting," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 105(C), pages 60-82.
    6. Wu, Kan & Yuan, Xue-Ming, 2016. "Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demandAuthor-Name: Zhao, Shi Tao," European Journal of Operational Research, Elsevier, vol. 255(2), pages 364-379.
    7. Sazvar, Z. & Mirzapour Al-e-hashem, S.M.J. & Govindan, K. & Bahli, B., 2016. "A novel mathematical model for a multi-period, multi-product optimal ordering problem considering expiry dates in a FEFO system," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 232-261.

  4. Önal, Mehmet & van den Heuvel, Wilco & Liu, Tieming, 2012. "A note on “The economic lot sizing problem with inventory bounds”," European Journal of Operational Research, Elsevier, vol. 223(1), pages 290-294.
    See citations under working paper version above.
  5. van den Heuvel, Wilco & Gutiérrez, José Miguel & Hwang, Hark-Chin, 2011. "Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities"," European Journal of Operational Research, Elsevier, vol. 213(2), pages 455-457, September.
    See citations under working paper version above.
  6. Wilco Van den Heuvel & Albert P. M. Wagelmans, 2010. "Worst-Case Analysis for a General Class of Online Lot-Sizing Heuristics," Operations Research, INFORMS, vol. 58(1), pages 59-67, February.
    See citations under working paper version above.
  7. Heuvel, Wilco van den & Borm, Peter & Hamers, Herbert, 2007. "Economic lot-sizing games," European Journal of Operational Research, Elsevier, vol. 176(2), pages 1117-1130, January.
    See citations under working paper version above.
  8. van den Heuvel, Wilco & Wagelmans, Albert P.M., 2006. "A polynomial time algorithm for a deterministic joint pricing and inventory model," European Journal of Operational Research, Elsevier, vol. 170(2), pages 463-480, April.
    See citations under working paper version above.

More information

Research fields, statistics, top rankings, if available.

Statistics

Access and download statistics for all items

Co-authorship network on CollEc

NEP Fields

NEP is an announcement service for new working papers, with a weekly report in each of many fields. This author has had 11 papers announced in NEP. These are the fields, ordered by number of announcements, along with their dates. If the author is listed in the directory of specialists for this field, a link is also provided.
  1. NEP-COM: Industrial Competition (3) 2016-01-03 2016-05-21 2017-06-18
  2. NEP-MIC: Microeconomics (3) 2016-05-21 2017-06-18 2018-03-12
  3. NEP-CMP: Computational Economics (2) 2003-08-17 2016-03-29
  4. NEP-CTA: Contract Theory & Applications (2) 2016-05-21 2017-06-18
  5. NEP-UPT: Utility Models & Prospect Theory (2) 2017-06-18 2018-03-12
  6. NEP-DES: Economic Design (1) 2017-06-18

Corrections

All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. For general information on how to correct material on RePEc, see these instructions.

To update listings or check citations waiting for approval, Wilco van den Heuvel should log into the RePEc Author Service.

To make corrections to the bibliographic information of a particular item, find the technical contact on the abstract page of that item. There, details are also given on how to add or correct references and citations.

To link different versions of the same work, where versions have a different title, use this form. Note that if the versions have a very similar title and are in the author's profile, the links will usually be created automatically.

Please note that most corrections can take a couple of weeks to filter through the various RePEc services.

IDEAS is a RePEc service hosted by the Research Division of the Federal Reserve Bank of St. Louis . RePEc uses bibliographic data supplied by the respective publishers.