IDEAS home Printed from https://ideas.repec.org/a/inm/orijoc/v35y2023i6p1470-1490.html
   My bibliography  Save this article

Multilevel Lot-Sizing with Inventory Bounds

Author

Listed:
  • Hark-Chin Hwang

    (School of Management, Kyung Hee University, Seoul 130-701, Republic of Korea)

  • Wilco van den Heuvel

    (Econometric Institute, Erasmus University Rotterdam, 3062 Rotterdam, Netherlands)

  • Albert P. M. Wagelmans

    (Econometric Institute, Erasmus University Rotterdam, 3062 Rotterdam, Netherlands)

Abstract

We consider a single-item multilevel lot-sizing problem with a serial structure where one of the levels has an inventory capacity (the bottleneck level). We propose a novel dynamic programming algorithm combining Zangwill’s approach for the uncapacitated problem and the basis-path approach for the production capacitated problem. Under reasonable assumptions on the cost parameters the time complexity of the algorithm is O ( L T 6 ) with L the number of levels in the supply chain and T the length of the planning horizon. Computational tests show that our algorithm is significantly faster than the commercial solver C plex applied to a standard formulation and can solve reasonably sized instances up to 48 periods and 12 levels in a few minutes.

Suggested Citation

  • Hark-Chin Hwang & Wilco van den Heuvel & Albert P. M. Wagelmans, 2023. "Multilevel Lot-Sizing with Inventory Bounds," INFORMS Journal on Computing, INFORMS, vol. 35(6), pages 1470-1490, November.
  • Handle: RePEc:inm:orijoc:v:35:y:2023:i:6:p:1470-1490
    DOI: 10.1287/ijoc.2022.0216
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/ijoc.2022.0216
    Download Restriction: no

    File URL: https://libkey.io/10.1287/ijoc.2022.0216?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. van den Heuvel, W.J. & Wagelmans, A.P.M., 2008. "A holding cost bound for the economic lot-sizing problem with time-invariant cost parameters," Econometric Institute Research Papers EI 2008-10, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
    3. Gabriel R. Bitran & Horacio H. Yanasse, 1982. "Computational Complexity of the Capacitated Lot Size Problem," Management Science, INFORMS, vol. 28(10), pages 1174-1186, October.
    4. Willard I. Zangwill, 1969. "A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System--A Network Approach," Management Science, INFORMS, vol. 15(9), pages 506-527, May.
    5. Stephen F. Love, 1972. "A Facilities in Series Inventory Model with Nested Schedules," Management Science, INFORMS, vol. 18(5-Part-1), pages 327-338, January.
    6. Chia-Shin Chung & Chien-Hua Mike Lin, 1988. "An O(T 2 ) Algorithm for the NI/G/NI/ND Capacitated Lot Size Problem," Management Science, INFORMS, vol. 34(3), pages 420-426, March.
    7. Stephen F. Love, 1973. "Bounded Production and Inventory Models with Piecewise Concave Costs," Management Science, INFORMS, vol. 20(3), pages 313-318, November.
    8. WOLSEY, Lurence A., 2006. "Lot-sizing with production and delivery time windows," LIDAM Reprints CORE 1844, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    9. Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
    10. Ming Zhao & Minjiao Zhang, 2020. "Multiechelon Lot Sizing: New Complexities and Inequalities," Operations Research, INFORMS, vol. 68(2), pages 534-551, March.
    11. Mathieu Van Vyve, 2007. "Algorithms for Single-Item Lot-Sizing Problems with Constant Batch Size," Mathematics of Operations Research, INFORMS, vol. 32(3), pages 594-613, August.
    12. MELO, Rafael A. & WOLSEY, Laurence A., 2010. "Uncapacitated two-level lot-sizing," LIDAM Reprints CORE 2235, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    13. Alok Aggarwal & James K. Park, 1993. "Improved Algorithms for Economic Lot Size Problems," Operations Research, INFORMS, vol. 41(3), pages 549-571, June.
    14. Stéphane Dauzère-Pérès & Atle Nordli & Asmund Olstad & Kjetil Haugen & Ulrich Koester & Myrstad Per Olav & Geir Teistklub & Alf Reistad, 2007. "Omya Hustadmarmor Optimizes Its Supply Chain for Delivering Calcium Carbonate Slurry to European Paper Manufacturers," Interfaces, INFORMS, vol. 37(1), pages 39-51, February.
    15. Chung-Yee Lee & Sila Çetinkaya & Wikrom Jaruphongsa, 2003. "A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse," Operations Research, INFORMS, vol. 51(5), pages 735-747, October.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    2. Ming Zhao & Minjiao Zhang, 2020. "Multiechelon Lot Sizing: New Complexities and Inequalities," Operations Research, INFORMS, vol. 68(2), pages 534-551, March.
    3. Hark-Chin Hwang, 2010. "Economic Lot-Sizing for Integrated Production and Transportation," Operations Research, INFORMS, vol. 58(2), pages 428-444, April.
    4. Hark-Chin Hwang, 2009. "Inventory Replenishment and Inbound Shipment Scheduling Under a Minimum Replenishment Policy," Transportation Science, INFORMS, vol. 43(2), pages 244-264, May.
    5. Goisque, Guillaume & Rapine, Christophe, 2017. "An efficient algorithm for the 2-level capacitated lot-sizing problem with identical capacities at both levels," European Journal of Operational Research, Elsevier, vol. 261(3), pages 918-928.
    6. Minjiao Zhang & Simge Küçükyavuz & Hande Yaman, 2012. "A Polyhedral Study of Multiechelon Lot Sizing with Intermediate Demands," Operations Research, INFORMS, vol. 60(4), pages 918-935, August.
    7. Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
    8. Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.
    9. Hwang, Hark-Chin & Kang, Jangha, 2020. "The two-level lot-sizing problem with outbound shipment," Omega, Elsevier, vol. 90(C).
    10. VAN VYVE, Mathieu & WOLSEY, Laurence & YAMAN, Hande, 2012. "Relaxations for two-level multi-item lot-sizing problem," LIDAM Discussion Papers CORE 2012031, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    11. Hark-Chin Hwang & Hyun-Soo Ahn & Philip Kaminsky, 2013. "Basis Paths and a Polynomial Algorithm for the Multistage Production-Capacitated Lot-Sizing Problem," Operations Research, INFORMS, vol. 61(2), pages 469-482, April.
    12. Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
    13. Hwang, Hark-Chin & Jaruphongsa, Wikrom, 2008. "Dynamic lot-sizing model for major and minor demands," European Journal of Operational Research, Elsevier, vol. 184(2), pages 711-724, January.
    14. Ayse Akbalik & Bernard Penz & Christophe Rapine, 2015. "Capacitated lot sizing problems with inventory bounds," Annals of Operations Research, Springer, vol. 229(1), pages 1-18, June.
    15. Liu, X. & Tu, Yl., 2008. "Production planning with limited inventory capacity and allowed stockout," International Journal of Production Economics, Elsevier, vol. 111(1), pages 180-191, January.
    16. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
    17. Jing, Fuying & Chao, Xiangrui, 2022. "Forecast horizons for a two-echelon dynamic lot-sizing problem," Omega, Elsevier, vol. 110(C).
    18. Hwang, Hark-Chin & Kang, Jangha, 2016. "Two-phase algorithm for the lot-sizing problem with backlogging for stepwise transportation cost without speculative motives," Omega, Elsevier, vol. 59(PB), pages 238-250.
    19. Siao-Leu Phouratsamay & Safia Kedad-Sidhoum & Fanny Pascual, 2021. "Coordination of a two-level supply chain with contracts," 4OR, Springer, vol. 19(2), pages 235-264, June.
    20. Hark‐Chin Hwang & Wilco van den Heuvel, 2012. "Improved algorithms for a lot‐sizing problem with inventory bounds and backlogging," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(3‐4), pages 244-253, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orijoc:v:35:y:2023:i:6:p:1470-1490. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.