IDEAS home Printed from
MyIDEAS: Log in (now much improved!) to save this article

Promised Delivery Time and Capacity Games in Time-Based Competition

  • Weixin Shang


    (School of Management, Fudan University, Shanghai 200433, China)

  • Liming Liu


    (Faculty of Business, Hong Kong Polytechnic University, Hong Kong, China)

Registered author(s):

    We investigate firms' competitive behaviors in industries where customers are sensitive to both promised delivery time (PDT) and quality of service (QoS) measured by the on-time delivery rate. To study the competition in PDT at the marketing level, we construct an oligopoly game with an external QoS requirement. We show that there exists a unique Nash equilibrium, and the equilibrium QoS exhibits a switching surface structure with respect to capacities. To study the competition in capacity at the strategic level, we construct a two-stage game in which the firms compete in terms of their capacities in stage 1 and in terms of PDT in stage 2. We show the existence of two different types of pure strategy equilibria and characterize them. This study provides the following insights: an index of time-based competitive advantage (ITCA) and the first-mover advantage determine the positions of the firms in time-based competition; either the well-known prisoner's dilemma or off-equilibrium behaviors due to different preferences for equilibria (when multiple equilibria exist) may lead the firms to overinvest in capacity, but no one may gain a competitive advantage; a uniform improvement in internal efficiency (i.e., a uniform capacity cost reduction) may harm everyone; quality differentiation (i.e., going beyond the QoS benchmark) plays a dual role in time-based competition, either helping a firm with a larger ITCA to compete more effectively, or helping a firm possibly with a smaller ITCA to preempt competitors and protect its market advantage. This paper was accepted by Paul H. Zipkin, operations and supply chain management.

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

    File URL:
    Download Restriction: no

    Article provided by INFORMS in its journal Management Science.

    Volume (Year): 57 (2011)
    Issue (Month): 3 (March)
    Pages: 599-610

    in new window

    Handle: RePEc:inm:ormnsc:v:57:y:2011:i:3:p:599-610
    Contact details of provider: Postal:
    7240 Parkway Drive, Suite 300, Hanover, MD 21076 USA

    Phone: +1-443-757-3500
    Fax: 443-757-3515
    Web page:

    More information through EDIRC

    References listed on IDEAS
    Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:

    as in new window
    1. Sanjeev Dewan & Haim Mendelson, 1990. "User Delay Costs and Internal Pricing for a Service Facility," Management Science, INFORMS, vol. 36(12), pages 1502-1517, December.
    2. Lode Li & Yew Sing Lee, 1994. "Pricing and Delivery-Time Performance in a Competitive Environment," Management Science, INFORMS, vol. 40(5), pages 633-646, May.
    3. Suman Basuroy & Dung Nguyen, 1998. "Multinomial Logit Market Share Models: Equilibrium Characteristics and Strategic Implications," Management Science, INFORMS, vol. 44(10), pages 1396-1408, October.
    4. Lawrence M. Wein, 1991. "Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue," Management Science, INFORMS, vol. 37(7), pages 834-850, July.
    5. Teck H. Ho & Yu-Sheng Zheng, 2004. "Setting Customer Expectation in Service Delivery: An Integrated Marketing-Operations Perspective," Management Science, INFORMS, vol. 50(4), pages 479-488, April.
    6. Steven T. Berry, 1994. "Estimating Discrete-Choice Models of Product Differentiation," RAND Journal of Economics, The RAND Corporation, vol. 25(2), pages 242-262, Summer.
    7. Jan A. Van Mieghem, 2000. "Price and Service Discrimination in Queuing Systems: Incentive Compatibility of Gc\mu Scheduling," Management Science, INFORMS, vol. 46(9), pages 1249-1267, September.
    8. Piyush Kumar & Manohar U. Kalwani & Maqbool Dada, 1997. "The Impact of Waiting Time Guarantees on Customers' Waiting Experiences," Marketing Science, INFORMS, vol. 16(4), pages 295-314.
    9. Naor, P, 1969. "The Regulation of Queue Size by Levying Tolls," Econometrica, Econometric Society, vol. 37(1), pages 15-24, January.
    10. Olivier Armantier & Oliver Richard, 2008. "Domestic airline alliances and consumer welfare," RAND Journal of Economics, RAND Corporation, vol. 39(3), pages 875-904.
    11. Liming Liu & Mahmut Parlar & Stuart X. Zhu, 2007. "Pricing and Lead Time Decisions in Decentralized Supply Chains," Management Science, INFORMS, vol. 53(5), pages 713-725, May.
    12. Candace Arai Yano, 1987. "Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs," Management Science, INFORMS, vol. 33(1), pages 95-106, January.
    13. Ehud Kalai & Morton I. Kamien & Michael Rubinovitch, 1992. "Optimal Service Speeds in a Competitive Environment," Management Science, INFORMS, vol. 38(8), pages 1154-1163, August.
    14. Tamer Boyaci & Saibal Ray, 2003. "Product Differentiation and Capacity Cost Interaction in Time and Price Sensitive Markets," Manufacturing & Service Operations Management, INFORMS, vol. 5(1), pages 18-36, May.
    15. Lode Li, 1992. "The Role of Inventory in Delivery-Time Competition," Management Science, INFORMS, vol. 38(2), pages 182-197, February.
    16. Kut C. So, 2000. "Price and Time Competition for Service Delivery," Manufacturing & Service Operations Management, INFORMS, vol. 2(4), pages 392-409, April.
    17. GĂ©rard P. Cachon & Fuqiang Zhang, 2007. "Obtaining Fast Service in a Queueing System via Performance-Based Allocation of Demand," Management Science, INFORMS, vol. 53(3), pages 408-420, March.
    18. Jing-Sheng Song & Candace A. Yano & Panupol Lerssrisuriya, 2000. "Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 287-296, July.
    19. Berry, Steven T, 1992. "Estimation of a Model of Entry in the Airline Industry," Econometrica, Econometric Society, vol. 60(4), pages 889-917, July.
    20. Izak Duenyas & Wallace J. Hopp, 1995. "Quoting Customer Lead Times," Management Science, INFORMS, vol. 41(1), pages 43-57, January.
    21. So, Kut C. & Song, Jing-Sheng, 1998. "Price, delivery time guarantees and capacity selection," European Journal of Operational Research, Elsevier, vol. 111(1), pages 28-49, November.
    22. Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
    Full references (including those not matched with items on IDEAS)

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:57:y:2011:i:3:p:599-610. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Mirko Janc)

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    This information is provided to you by IDEAS at the Research Division of the Federal Reserve Bank of St. Louis using RePEc data.