IDEAS home Printed from https://ideas.repec.org/a/eee/transb/v85y2016icp56-69.html
   My bibliography  Save this article

Optimal choice of capacity, toll and government guarantee for build-operate-transfer roads under asymmetric cost informationAuthor-Name: Shi, Shasha

Author

Listed:
  • Yin, Yafeng
  • Guo, Xiaolei

Abstract

The private provision of public roads via the build-operate-transfer (BOT) mode has been increasingly used around the world. By viewing a BOT contract as a combination of road capacity, toll and government guarantee, this paper investigates optimal concession contract design under both symmetric and asymmetric information about the marginal maintenance cost of private investors. Under asymmetric information, the government guarantee serves as an instrument to induce a private investor to reveal his true cost information. Compared with the situation under symmetric information, the government will suffer a loss of social welfare; the private investor will charge a higher toll that increases in his reported marginal maintenance cost, and specify a lower capacity that decreases with the reported cost. The results also show that the private investor obtains extra information rent beyond the reservation level of return and the rent decreases with his reported cost. However, the resulting volume-capacity ratios of the BOT road under both information structures are the same.

Suggested Citation

  • Yin, Yafeng & Guo, Xiaolei, 2016. "Optimal choice of capacity, toll and government guarantee for build-operate-transfer roads under asymmetric cost informationAuthor-Name: Shi, Shasha," Transportation Research Part B: Methodological, Elsevier, vol. 85(C), pages 56-69.
  • Handle: RePEc:eee:transb:v:85:y:2016:i:c:p:56-69
    DOI: 10.1016/j.trb.2015.12.019
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0191261516000047
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.trb.2015.12.019?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Patrick Bolton & Mathias Dewatripont, 2005. "Contract Theory," MIT Press Books, The MIT Press, edition 1, volume 1, number 0262025760, December.
    2. Tan, Zhijia & Yang, Hai & Guo, Xiaolei, 2010. "Properties of Pareto-efficient contracts and regulations for road franchising," Transportation Research Part B: Methodological, Elsevier, vol. 44(4), pages 415-433, May.
    3. Ubbels, Barry & Verhoef, Erik T., 2008. "Auctioning concessions for private roads," Transportation Research Part A: Policy and Practice, Elsevier, vol. 42(1), pages 155-172, January.
    4. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    5. Yang, Hai & Meng, Qiang, 2000. "Highway pricing and capacity choice in a road network under a build-operate-transfer scheme," Transportation Research Part A: Policy and Practice, Elsevier, vol. 34(3), pages 207-222, April.
    6. Wang, Shuaian & Meng, Qiang & Liu, Zhiyuan, 2013. "Fundamental properties of volume–capacity ratio of a private toll road in general networks," Transportation Research Part B: Methodological, Elsevier, vol. 47(C), pages 77-86.
    7. Verhoef, Erik T., 2007. "Second-best road pricing through highway franchising," Journal of Urban Economics, Elsevier, vol. 62(2), pages 337-361, September.
    8. Vassallo, José Manuel, 2010. "The role of the discount rate in tendering highway concessions under the LPVR approach," Transportation Research Part A: Policy and Practice, Elsevier, vol. 44(10), pages 806-814, December.
    9. Nombela, Gustavo & de Rus, Ginés, 2004. "Flexible-term contracts for road franchising," Transportation Research Part A: Policy and Practice, Elsevier, vol. 38(3), pages 163-179, March.
    10. Auriol, Emmanuelle & Picard, Pierre M., 2013. "A theory of BOT concession contracts," Journal of Economic Behavior & Organization, Elsevier, vol. 89(C), pages 187-209.
    11. Baron, David P & Myerson, Roger B, 1982. "Regulating a Monopolist with Unknown Costs," Econometrica, Econometric Society, vol. 50(4), pages 911-930, July.
    12. Wu, Di & Yin, Yafeng & Lawphongpanich, Siriphong, 2011. "Optimal selection of build–operate-transfer projects on transportation networks," Transportation Research Part B: Methodological, Elsevier, vol. 45(10), pages 1699-1709.
    13. Eduardo M. R. A. Engel & Ronald D. Fischer & Alexander Galetovic, 2001. "Least-Present-Value-of-Revenue Auctions and Highway Franchising," Journal of Political Economy, University of Chicago Press, vol. 109(5), pages 993-1020, October.
    14. Xiao, Feng & Yang, Hai & Han, Deren, 2007. "Competition and efficiency of private toll roads," Transportation Research Part B: Methodological, Elsevier, vol. 41(3), pages 292-308, March.
    15. Yang, Hai & Meng, Qiang, 2002. "A note on "highway pricing and capacity choice in a road network under a build-operate-transfer scheme"," Transportation Research Part A: Policy and Practice, Elsevier, vol. 36(7), pages 659-663, August.
    16. de Palma, André & Lindsey, Robin & Proost, Stef, 2007. "Chapter 1 Investment and the use of tax and toll revenues in the transport sector: The research agenda," Research in Transportation Economics, Elsevier, vol. 19(1), pages 1-26, January.
    17. Wu, Di & Yin, Yafeng & Yang, Hai, 2011. "The independence of volume-capacity ratio of private toll roads in general networks," Transportation Research Part B: Methodological, Elsevier, vol. 45(1), pages 96-101, January.
    18. Zhijia Tan & Hai Yang & Xiaolei Guo, 2009. "Build-operate-transfer Schemes for Road Franchising with Road Deterioration and Maintenance Effects," Springer Books, in: William H. K. Lam & S. C. Wong & Hong K. Lo (ed.), Transportation and Traffic Theory 2009: Golden Jubilee, chapter 0, pages 241-261, Springer.
    19. Bailey, Elizabeth E., 1976. "Innovation and regulation : A reply," Journal of Public Economics, Elsevier, vol. 5(3-4), pages 393-394.
    20. Serhan Ziya & Hayriye Ayhan & Robert D. Foley, 2004. "Relationships Among Three Assumptions in Revenue Management," Operations Research, INFORMS, vol. 52(5), pages 804-809, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhao, Yunpeng & Song, Jinbo & Feng, Zhuo & Jin, Lulu, 2023. "Incentive contracts with demand guarantee in BOT toll road projects," Research in Transportation Economics, Elsevier, vol. 98(C).
    2. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    3. Yuan, Jingfeng & Ding, Hongxing & Huang, Zeyuan & Deng, Binchao & Li, Shuai & Huang, Wei, 2021. "Influence of market structures on concession pricing in Public-Private-Partnership utilities with asymmetric information," Utilities Policy, Elsevier, vol. 69(C).
    4. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    5. Shi, Shasha & An, Qingxian & Chen, Ke, 2020. "Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 228-254.
    6. Huang, Hai-Jun & Xia, Tian & Tian, Qiong & Liu, Tian-Liang & Wang, Chenlan & Li, Daqing, 2020. "Transportation issues in developing China's urban agglomerations," Transport Policy, Elsevier, vol. 85(C), pages 1-22.
    7. Sun, Xiaotong & Yin, Yafeng, 2021. "Decentralized game-theoretical approaches for behaviorally-stable and efficient vehicle platooning," Transportation Research Part B: Methodological, Elsevier, vol. 153(C), pages 45-69.
    8. Mingzhu Yu & Ruina Yang & Zelong Yi & Xuwen Cong, 2020. "Contracting in Ocean Shipping Market Under Asymmetric Information," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 37(02), pages 1-24, March.
    9. Li, Shuai & Cai, Jiannan & Feng, Zhuo & Xu, Yifang & Cai, Hubo, 2019. "Government contracting with monopoly in infrastructure provision: Regulation or deregulation?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 506-523.
    10. Chen, Zhiyuan & Sun, Shaobo & Li, Jianbin & Zhang, Langlang & Fan, Hao, 2022. "Optimal BOT contracts in a two-road transportation network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    11. Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
    12. Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
    13. Song, Jinbo & Zhao, Yunpeng & Jin, Lulu & Sun, Yan, 2018. "Pareto optimization of public-private partnership toll road contracts with government guarantees," Transportation Research Part A: Policy and Practice, Elsevier, vol. 117(C), pages 158-175.
    14. Guo, Qianwen & Sun, Yanshuo & Li, Zhi-Chun & Li, Zhongfei, 2017. "An integrated model for road capacity choice and cordon toll pricing," Research in Transportation Economics, Elsevier, vol. 62(C), pages 68-79.
    15. Li, Shuai & Cai, Hubo, 2017. "Government incentive impacts on private investment behaviors under demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 101(C), pages 115-129.
    16. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
    2. Lu, Zhaoyang & Meng, Qiang, 2023. "Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts," Transportation Research Part B: Methodological, Elsevier, vol. 172(C), pages 71-92.
    3. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    4. Lu, Zhaoyang & Meng, Qiang, 2017. "Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 100(C), pages 17-37.
    5. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying & Zhang, Shuai-Jun, 2016. "Subsidizing and pricing private toll roads with noncontractible service quality: A relational contract approach," Transportation Research Part B: Methodological, Elsevier, vol. 91(C), pages 466-491.
    6. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    7. Wu, Di & Yin, Yafeng & Lawphongpanich, Siriphong, 2011. "Optimal selection of build–operate-transfer projects on transportation networks," Transportation Research Part B: Methodological, Elsevier, vol. 45(10), pages 1699-1709.
    8. Shi, Shasha & Yin, Yafeng & An, Qingxian & Chen, Ke, 2021. "Optimal build-operate-transfer road contracts under information asymmetry and uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 65-86.
    9. Hoang-Tung, Nguyen & Viet Hung, Do & Kato, Hironori & Binh, Phan Le, 2021. "Modeling ceiling price for build-operate-transfer road projects in developing countries," Economics of Transportation, Elsevier, vol. 28(C).
    10. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo, 2018. "The effects of concession period structures on BOT road contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 107(C), pages 106-125.
    11. Tan, Zhijia & Yang, Hai & Guo, Xiaolei, 2010. "Properties of Pareto-efficient contracts and regulations for road franchising," Transportation Research Part B: Methodological, Elsevier, vol. 44(4), pages 415-433, May.
    12. Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
    13. Shu, Hang & Durango-Cohen, Pablo L., 2021. "On the design of optimal auctions for road concessions: Firm selection, government payments, toll and capacity schedules with imperfect information," Transportation Research Part B: Methodological, Elsevier, vol. 146(C), pages 210-236.
    14. van den Berg, Vincent A.C., 2013. "Serial private infrastructures," Transportation Research Part B: Methodological, Elsevier, vol. 56(C), pages 186-202.
    15. Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
    16. Fu, Xinying & van den Berg, Vincent A.C. & Verhoef, Erik T., 2018. "Private road networks with uncertain demand," Research in Transportation Economics, Elsevier, vol. 70(C), pages 57-68.
    17. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    18. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
    19. Shi, Shasha & An, Qingxian & Chen, Ke, 2020. "Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 228-254.
    20. Li, Shuai & Cai, Jiannan & Feng, Zhuo & Xu, Yifang & Cai, Hubo, 2019. "Government contracting with monopoly in infrastructure provision: Regulation or deregulation?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 506-523.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transb:v:85:y:2016:i:c:p:56-69. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/548/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.