IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v298y2022i1p1-24.html
   My bibliography  Save this article

A survey of scheduling with parallel batch (p-batch) processing

Author

Listed:
  • Fowler, John W.
  • Mönch, Lars

Abstract

Multiple jobs are processed simultaneously on a given batch processing machine in parallel batching. The resulting batch is called a p-batch. Batching can lead to reduced production costs, but depending how the jobs are grouped into a batch can lead to better or worse delivery times of products. Scheduling jobs on batch processing machines requires grouping decisions in addition to the conventional assignment and sequencing decisions. Parallel batching is important in such diverse areas such as semiconductor manufacturing, aircraft manufacturing, shoe manufacturing, and healthcare. This paper surveys the literature on parallel batching and will focus primarily on deterministic scheduling. We provide a taxonomy of parallel batching problems, distinguishing the compatible case where all jobs can be used to form a batch from the incompatible families setting where only jobs from the same family can be used to form a batch. Makespan, flow time-, and due date-related measures are considered. We discuss scheduling approaches for single machines, parallel machines, and other environments such as flow shops and job shops. In addition to the discussion of archived and current papers, we discuss also recent trends in scheduling jobs on machines with parallel batch processing. Finally, we provide a discussion of future research directions for p-batch scheduling.

Suggested Citation

  • Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
  • Handle: RePEc:eee:ejores:v:298:y:2022:i:1:p:1-24
    DOI: 10.1016/j.ejor.2021.06.012
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S037722172100518X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2021.06.012?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ari P. J. Vepsalainen & Thomas E. Morton, 1987. "Priority Rules for Job Shops with Weighted Tardiness Costs," Management Science, INFORMS, vol. 33(8), pages 1035-1047, August.
    2. Sung, C. S. & Min, J. I., 2001. "Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date," European Journal of Operational Research, Elsevier, vol. 131(1), pages 95-106, May.
    3. Jairo Maya & Shanthi Muthuswamy & Mario C. Vélez-Gallego & Miguel Rojas-Santiago, 2014. "Minimising makespan in a no-wait flow shop with two batch processing machines: a grasp algorithm," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 17(2), pages 152-169.
    4. Gregory Dobson & Ramakrishnan S. Nambimadom, 2001. "The Batch Loading and Scheduling Problem," Operations Research, INFORMS, vol. 49(1), pages 52-65, February.
    5. Jolai Ghazvini, Fariborz & Dupont, Lionel, 1998. "Minimizing mean flow times criteria on a single batch processing machine with non-identical jobs sizes," International Journal of Production Economics, Elsevier, vol. 55(3), pages 273-280, August.
    6. Damodaran, Purushothaman & Kumar Manjeshwar, Praveen & Srihari, Krishnaswami, 2006. "Minimizing makespan on a batch-processing machine with non-identical job sizes using genetic algorithms," International Journal of Production Economics, Elsevier, vol. 103(2), pages 882-891, October.
    7. Jolai, Fariborz, 2005. "Minimizing number of tardy jobs on a batch processing machine with incompatible job families," European Journal of Operational Research, Elsevier, vol. 162(1), pages 184-190, April.
    8. Gao, Yuan & Yuan, Jinjiang & Ng, C.T. & Cheng, T.C.E., 2019. "A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 273(1), pages 74-81.
    9. Fuh-Der Chou, 2013. "Minimising the total weighted tardiness for non-identical parallel batch processing machines with job release times and non-identical job sizes," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 7(5), pages 529-557.
    10. Dimitris Bertsimas & Melvyn Sim, 2004. "The Price of Robustness," Operations Research, INFORMS, vol. 52(1), pages 35-53, February.
    11. Koh, Shie-Gheun & Koo, Pyung-Hoi & Kim, Dong-Chun & Hur, Won-Suk, 2005. "Scheduling a single batch processing machine with arbitrary job sizes and incompatible job families," International Journal of Production Economics, Elsevier, vol. 98(1), pages 81-96, October.
    12. Marcel F. Neuts & R. Nadarajan, 1982. "A Multiserver Queue with Thresholds for the Acceptance of Customers into Service," Operations Research, INFORMS, vol. 30(5), pages 948-960, October.
    13. Nicholas Wiechman & Purushothaman Damodaran, 2015. "A column generation approach for scheduling a batch processing machine with makespan objective," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 21(3), pages 334-355.
    14. Dorit S. Hochbaum & Dan Landy, 1997. "Scheduling Semiconductor Burn-In Operations to Minimize Total Flowtime," Operations Research, INFORMS, vol. 45(6), pages 874-885, December.
    15. Shengchao Zhou & Xueping Li & Huaping Chen & Cong Guo, 2016. "Minimizing makespan in a no-wait flowshop with two batch processing machines using estimation of distribution algorithm," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 4919-4937, August.
    16. Amin-Naseri, Mohammad Reza & Beheshti-Nia, Mohammad Ali, 2009. "Hybrid flow shop scheduling with parallel batching," International Journal of Production Economics, Elsevier, vol. 117(1), pages 185-196, January.
    17. K. L. Arora, 1964. "Two-Server Bulk-Service Queuing Process," Operations Research, INFORMS, vol. 12(2), pages 286-294, April.
    18. Wu, Kan, 2014. "Taxonomy of batch queueing models in manufacturing systems," European Journal of Operational Research, Elsevier, vol. 237(1), pages 129-135.
    19. C Almeder & L Mönch, 2011. "Metaheuristics for scheduling jobs with incompatible families on parallel batching machines," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(12), pages 2083-2096, December.
    20. Jia, Zhao-hong & Leung, Joseph Y.-T., 2015. "A meta-heuristic to minimize makespan for parallel batch machines with arbitrary job sizes," European Journal of Operational Research, Elsevier, vol. 240(3), pages 649-665.
    21. Yi Tan & Lars Mönch & John W. Fowler, 2018. "A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines," Journal of Scheduling, Springer, vol. 21(2), pages 209-226, April.
    22. Sung, C. S. & Choung, Y. I., 2000. "Minimizing makespan on a single burn-in oven in semiconductor manufacturing," European Journal of Operational Research, Elsevier, vol. 120(3), pages 559-574, February.
    23. Jia, Zhao-hong & Li, Kai & Leung, Joseph Y.-T., 2015. "Effective heuristic for makespan minimization in parallel batch machines with non-identical capacities," International Journal of Production Economics, Elsevier, vol. 169(C), pages 1-10.
    24. Andreas Klemmt & Gerald Weigert & Sebastian Werner, 2011. "Optimisation approaches for batch scheduling in semiconductor manufacturing," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 5(3), pages 338-359.
    25. A H Kashan & B Karimi, 2008. "Scheduling a single batch-processing machine with arbitrary job sizes and incompatible job families: An ant colony framework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(9), pages 1269-1280, September.
    26. Jun-Qiang Wang & Guo-Qiang Fan & Zhixin Liu, 2020. "Mixed batch scheduling on identical machines," Journal of Scheduling, Springer, vol. 23(4), pages 487-496, August.
    27. Wang, Jun-Qiang & Fan, Guo-Qiang & Zhang, Yingqian & Zhang, Cheng-Wu & Leung, Joseph Y.-T., 2017. "Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes," European Journal of Operational Research, Elsevier, vol. 258(2), pages 478-490.
    28. Jianming Zhang & Xifan Yao & Yun Li, 2020. "Improved evolutionary algorithm for parallel batch processing machine scheduling in additive manufacturing," International Journal of Production Research, Taylor & Francis Journals, vol. 58(8), pages 2263-2282, April.
    29. Helena Ramalhinho Lourenço & Olivier C. Martin & Thomas Stützle, 2019. "Iterated Local Search: Framework and Applications," International Series in Operations Research & Management Science, in: Michel Gendreau & Jean-Yves Potvin (ed.), Handbook of Metaheuristics, edition 3, chapter 0, pages 129-168, Springer.
    30. Emil Bahary & Peter Kolesar, 1972. "Multilevel Bulk Service Queues," Operations Research, INFORMS, vol. 20(2), pages 406-420, April.
    31. Xu, Rui & Chen, Huaping & Li, Xueping, 2013. "A bi-objective scheduling problem on batch machines via a Pareto-based ant colony system," International Journal of Production Economics, Elsevier, vol. 145(1), pages 371-386.
    32. Chung-Yee Lee & Reha Uzsoy & Louis A. Martin-Vega, 1992. "Efficient Algorithms for Scheduling Semiconductor Burn-In Operations," Operations Research, INFORMS, vol. 40(4), pages 764-775, August.
    33. C Almeder & L Mönch, 2011. "Metaheuristics for scheduling jobs with incompatible families on parallel batching machines," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(12), pages 2083-2096, December.
    34. Jacques Desrosiers & Marco E. Lübbecke, 2005. "A Primer in Column Generation," Springer Books, in: Guy Desaulniers & Jacques Desrosiers & Marius M. Solomon (ed.), Column Generation, chapter 0, pages 1-32, Springer.
    35. Muter, İbrahim, 2020. "Exact algorithms to minimize makespan on single and parallel batch processing machines," European Journal of Operational Research, Elsevier, vol. 285(2), pages 470-483.
    36. Unknown, 1986. "Letters," Choices: The Magazine of Food, Farm, and Resource Issues, Agricultural and Applied Economics Association, vol. 1(4), pages 1-9.
    37. Cynthia Barnhart & Ellis L. Johnson & George L. Nemhauser & Martin W. P. Savelsbergh & Pamela H. Vance, 1998. "Branch-and-Price: Column Generation for Solving Huge Integer Programs," Operations Research, INFORMS, vol. 46(3), pages 316-329, June.
    38. A. Oulamara, 2012. "No-Wait Scheduling Problems with Batching Machines," Springer Optimization and Its Applications, in: Roger Z. Ríos-Mercado & Yasmín A. Ríos-Solís (ed.), Just-in-Time Systems, chapter 0, pages 147-168, Springer.
    39. W. A. Horn, 1974. "Some simple scheduling algorithms," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 21(1), pages 177-185, March.
    40. Shubin Xu, 2018. "An adaptive penalty guided genetic algorithm for scheduling parallel batch processing machines," International Journal of Applied Management Science, Inderscience Enterprises Ltd, vol. 10(3), pages 247-268.
    41. Cheng Zhang & Zhongshun Shi & Zewen Huang & Yifan Wu & Leyuan Shi, 2017. "Flow shop scheduling with a batch processor and limited buffer," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3217-3233, June.
    42. M. Venkataramana & N.R. Srinivasa Raghavan, 2010. "Ant colony-based algorithms for scheduling parallel batch processors with incompatible job families," International Journal of Mathematics in Operational Research, Inderscience Enterprises Ltd, vol. 2(1), pages 73-98.
    43. Mehdi Abedi & Hany Seidgar & Hamed Fazlollahtabar & Rohollah Bijani, 2015. "Bi-objective optimisation for scheduling the identical parallel batch-processing machines with arbitrary job sizes, unequal job release times and capacity limits," International Journal of Production Research, Taylor & Francis Journals, vol. 53(6), pages 1680-1711, March.
    44. Monch, Lars & Schabacker, Rene & Pabst, Detlef & Fowler, John W., 2007. "Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops," European Journal of Operational Research, Elsevier, vol. 177(3), pages 2100-2118, March.
    45. Stéphane Dauzère‐Pérès & Marc Sevaux, 2003. "Using Lagrangean relaxation to minimize the weighted number of late jobs on a single machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(3), pages 273-288, April.
    46. Chung-Lun Li & Chung-Yee Lee, 1997. "Scheduling with agreeable release times and due dates on a batch processing machine," European Journal of Operational Research, Elsevier, vol. 96(3), pages 564-569, February.
    47. Hansen, Pierre & Mladenovic, Nenad, 2001. "Variable neighborhood search: Principles and applications," European Journal of Operational Research, Elsevier, vol. 130(3), pages 449-467, May.
    48. Chandra Sen Mazumdar & M. Mathirajan & R. Gopinath & A.I. Sivakumar, 2008. "Tabu Search methods for scheduling a burn-in oven with non-identical job sizes and secondary resource constraints," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 3(1/2), pages 119-139.
    49. Miguel Rojas-Santiago & Shanthi Muthuswamy & Purushothaman Damodaran & Mario C. Velez-Gallego, 2017. "Scheduling batch processing machines in a no-wait flow shop using ACO to minimise the makespan," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 27(3), pages 390-411.
    50. Ruiz, Ruben & Stutzle, Thomas, 2007. "A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem," European Journal of Operational Research, Elsevier, vol. 177(3), pages 2033-2049, March.
    51. Melouk, Sharif & Damodaran, Purushothaman & Chang, Ping-Yu, 2004. "Minimizing makespan for single machine batch processing with non-identical job sizes using simulated annealing," International Journal of Production Economics, Elsevier, vol. 87(2), pages 141-147, January.
    52. Izak Duenyas & John Neale, 1997. "Stochastic scheduling of a batch processing machine with incompatible job families," Annals of Operations Research, Springer, vol. 70(0), pages 191-220, April.
    53. Payman Jula & Robert C. Leachman, 2010. "Coordinated Multistage Scheduling of Parallel Batch-Processing Machines Under Multiresource Constraints," Operations Research, INFORMS, vol. 58(4-part-1), pages 933-947, August.
    54. Stefan Voß & David L. Woodruff, 2006. "Introduction to Computational Optimization Models for Production Planning in a Supply Chain," Springer Books, Springer, edition 0, number 978-3-540-29879-3, November.
    55. Javad H. Ahmadi & Reza H. Ahmadi & Sriram Dasu & Christopher S. Tang, 1992. "Batching and Scheduling Jobs on Batch and Discrete Processors," Operations Research, INFORMS, vol. 40(4), pages 750-763, August.
    56. Stefan Lausch & Lars Mönch, 2016. "Metaheuristic Approaches for Scheduling Jobs on Parallel Batch Processing Machines," International Series in Operations Research & Management Science, in: Ghaith Rabadi (ed.), Heuristics, Metaheuristics and Approximate Methods in Planning and Scheduling, edition 1, chapter 0, pages 187-207, Springer.
    57. Thiago Noronha & Mauricio Resende & Celso Ribeiro, 2011. "A biased random-key genetic algorithm for routing and wavelength assignment," Journal of Global Optimization, Springer, vol. 50(3), pages 503-518, July.
    58. Jens Rocholl & Lars Mönch & John Fowler, 2020. "Bi-criteria parallel batch machine scheduling to minimize total weighted tardiness and electricity cost," Journal of Business Economics, Springer, vol. 90(9), pages 1345-1381, November.
    59. Mourad Boudhar, 2003. "Scheduling a batch processing machine with bipartite compatibility graphs," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 57(3), pages 513-527, August.
    60. Gabriel R. Bitran & D. Tirupati, 1989. "Approximations for Product Departures from a Single-Server Station with Batch Processing in Multi-Product Queues," Management Science, INFORMS, vol. 35(7), pages 851-878, July.
    61. Sung, Chang Sup & Kim, Young Hwan & Yoon, Sang Hum, 2000. "A problem reduction and decomposition approach for scheduling for a flowshop of batch processing machines," European Journal of Operational Research, Elsevier, vol. 121(1), pages 179-192, February.
    62. Nicholas G. Hall, 1986. "Single‐ and multiple‐processor models for minimizing completion time variance," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 33(1), pages 49-54, February.
    63. Renan Spencer Trindade & Olinto César Bassi de Araújo & Marcia Helena Costa Fampa & Felipe Martins Müller, 2018. "Modelling and symmetry breaking in scheduling problems on batch processing machines," International Journal of Production Research, Taylor & Francis Journals, vol. 56(22), pages 7031-7048, November.
    64. Purushothaman Damodaran & Neal S. Hirani & Mario C. Velez-Gallego, 2009. "Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 3(2), pages 187-206.
    65. Malapert, Arnaud & Guéret, Christelle & Rousseau, Louis-Martin, 2012. "A constraint programming approach for a batch processing problem with non-identical job sizes," European Journal of Operational Research, Elsevier, vol. 221(3), pages 533-545.
    66. Joseph Adams & Egon Balas & Daniel Zawack, 1988. "The Shifting Bottleneck Procedure for Job Shop Scheduling," Management Science, INFORMS, vol. 34(3), pages 391-401, March.
    67. Hamilton Emmons, 1987. "Scheduling to a common due date on parallel uniform processors," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(6), pages 803-810, December.
    68. Sup Sung, Chang & Hwan Kim, Young, 2003. "Minimizing due date related performance measures on two batch processing machines," European Journal of Operational Research, Elsevier, vol. 147(3), pages 644-656, June.
    69. James C. Bean, 1994. "Genetic Algorithms and Random Keys for Sequencing and Optimization," INFORMS Journal on Computing, INFORMS, vol. 6(2), pages 154-160, May.
    70. Zhou, Shengchao & Liu, Ming & Chen, Huaping & Li, Xueping, 2016. "An effective discrete differential evolution algorithm for scheduling uniform parallel batch processing machines with non-identical capacities and arbitrary job sizes," International Journal of Production Economics, Elsevier, vol. 179(C), pages 1-11.
    71. Sim, S. H. & Templeton, J. G. C., 1985. "Steady state results for the M/M(a, b)/c batch-service system," European Journal of Operational Research, Elsevier, vol. 21(2), pages 260-267, August.
    72. Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
    73. Li, Xueping & Zhang, Kaike, 2018. "Single batch processing machine scheduling with two-dimensional bin packing constraints," International Journal of Production Economics, Elsevier, vol. 196(C), pages 113-121.
    74. Tang, Lixin & Zhao, Xiaoli & Liu, Jiyin & Leung, Joseph Y.-T., 2017. "Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine," European Journal of Operational Research, Elsevier, vol. 263(2), pages 401-411.
    75. Scott Webster & Kenneth R. Baker, 1995. "Scheduling Groups of Jobs on a Single Machine," Operations Research, INFORMS, vol. 43(4), pages 692-703, August.
    76. Cheng, T. C. Edwin & Janiak, Adam & Kovalyov, Mikhail Y., 2001. "Single machine batch scheduling with resource dependent setup and processing times," European Journal of Operational Research, Elsevier, vol. 135(1), pages 177-183, November.
    77. Eduardo Queiroga & Rian G. S. Pinheiro & Quentin Christ & Anand Subramanian & Artur A. Pessoa, 2021. "Iterated local search for single machine total weighted tardiness batch scheduling," Journal of Heuristics, Springer, vol. 27(3), pages 353-438, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lin, Ran & Wang, Jun-Qiang & Oulamara, Ammar, 2023. "Online scheduling on parallel-batch machines with periodic availability constraints and job delivery," Omega, Elsevier, vol. 116(C).
    2. Jianxin Fang & Brenda Cheang & Andrew Lim, 2023. "Problems and Solution Methods of Machine Scheduling in Semiconductor Manufacturing Operations: A Survey," Sustainability, MDPI, vol. 15(17), pages 1-44, August.
    3. Artur Alves Pessoa & Teobaldo Bulhões & Vitor Nesello & Anand Subramanian, 2022. "Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling," INFORMS Journal on Computing, INFORMS, vol. 34(3), pages 1512-1530, May.
    4. Ou, Jinwen & Lu, Lingfa & Zhong, Xueling, 2023. "Parallel-batch scheduling with rejection: Structural properties and approximation algorithms," European Journal of Operational Research, Elsevier, vol. 310(3), pages 1017-1032.
    5. Tian, Zheng & Zheng, Li, 2024. "Single machine parallel-batch scheduling under time-of-use electricity prices: New formulations and optimisation approaches," European Journal of Operational Research, Elsevier, vol. 312(2), pages 512-524.
    6. Zhang, Han & Li, Kai & Jia, Zhao-hong & Chu, Chengbin, 2023. "Minimizing total completion time on non-identical parallel batch machines with arbitrary release times using ant colony optimization," European Journal of Operational Research, Elsevier, vol. 309(3), pages 1024-1046.
    7. Haskilic, Volkan & Ulucan, Aydin & Atici, Kazim Baris & Sarac, Seda Busra, 2023. "A real-world case of autoclave loading and scheduling problems in aerospace composite material production," Omega, Elsevier, vol. 120(C).
    8. Yoshiaki Inoue, 2022. "A load-balancing problem for distributed bulk-service queues with size-dependent batch processing times," Queueing Systems: Theory and Applications, Springer, vol. 100(3), pages 449-451, April.
    9. Lin, Ran & Wang, Jun-Qiang & Liu, Zhixin & Xu, Jun, 2023. "Best possible algorithms for online scheduling on identical batch machines with periodic pulse interruptions," European Journal of Operational Research, Elsevier, vol. 309(1), pages 53-64.
    10. Xia Qian & Zhang Xingong, 2023. "Online scheduling of two-machine flowshop with lookahead and incompatible job families," Journal of Combinatorial Optimization, Springer, vol. 45(1), pages 1-11, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zhou, Shengchao & Xie, Jianhui & Du, Ni & Pang, Yan, 2018. "A random-keys genetic algorithm for scheduling unrelated parallel batch processing machines with different capacities and arbitrary job sizes," Applied Mathematics and Computation, Elsevier, vol. 334(C), pages 254-268.
    2. Zhang, Han & Li, Kai & Jia, Zhao-hong & Chu, Chengbin, 2023. "Minimizing total completion time on non-identical parallel batch machines with arbitrary release times using ant colony optimization," European Journal of Operational Research, Elsevier, vol. 309(3), pages 1024-1046.
    3. Damodaran, Purushothaman & Kumar Manjeshwar, Praveen & Srihari, Krishnaswami, 2006. "Minimizing makespan on a batch-processing machine with non-identical job sizes using genetic algorithms," International Journal of Production Economics, Elsevier, vol. 103(2), pages 882-891, October.
    4. Jia, Zhao-hong & Leung, Joseph Y.-T., 2015. "A meta-heuristic to minimize makespan for parallel batch machines with arbitrary job sizes," European Journal of Operational Research, Elsevier, vol. 240(3), pages 649-665.
    5. Li, Xueping & Zhang, Kaike, 2018. "Single batch processing machine scheduling with two-dimensional bin packing constraints," International Journal of Production Economics, Elsevier, vol. 196(C), pages 113-121.
    6. Jianxin Fang & Brenda Cheang & Andrew Lim, 2023. "Problems and Solution Methods of Machine Scheduling in Semiconductor Manufacturing Operations: A Survey," Sustainability, MDPI, vol. 15(17), pages 1-44, August.
    7. Melouk, Sharif & Damodaran, Purushothaman & Chang, Ping-Yu, 2004. "Minimizing makespan for single machine batch processing with non-identical job sizes using simulated annealing," International Journal of Production Economics, Elsevier, vol. 87(2), pages 141-147, January.
    8. A H Kashan & B Karimi, 2008. "Scheduling a single batch-processing machine with arbitrary job sizes and incompatible job families: An ant colony framework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(9), pages 1269-1280, September.
    9. Husseinzadeh Kashan, Ali & Ozturk, Onur, 2022. "Improved MILP formulation equipped with valid inequalities for scheduling a batch processing machine with non-identical job sizes," Omega, Elsevier, vol. 112(C).
    10. Xu, Jun & Wang, Jun-Qiang & Liu, Zhixin, 2022. "Parallel batch scheduling: Impact of increasing machine capacity," Omega, Elsevier, vol. 108(C).
    11. Artur Alves Pessoa & Teobaldo Bulhões & Vitor Nesello & Anand Subramanian, 2022. "Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling," INFORMS Journal on Computing, INFORMS, vol. 34(3), pages 1512-1530, May.
    12. Jia, Zhao-hong & Li, Kai & Leung, Joseph Y.-T., 2015. "Effective heuristic for makespan minimization in parallel batch machines with non-identical capacities," International Journal of Production Economics, Elsevier, vol. 169(C), pages 1-10.
    13. Christoph Hertrich & Christian Weiß & Heiner Ackermann & Sandy Heydrich & Sven O. Krumke, 2020. "Scheduling a proportionate flow shop of batching machines," Journal of Scheduling, Springer, vol. 23(5), pages 575-593, October.
    14. Koh, Shie-Gheun & Koo, Pyung-Hoi & Kim, Dong-Chun & Hur, Won-Suk, 2005. "Scheduling a single batch processing machine with arbitrary job sizes and incompatible job families," International Journal of Production Economics, Elsevier, vol. 98(1), pages 81-96, October.
    15. Min Kong & Xinbao Liu & Jun Pei & Panos M. Pardalos & Nenad Mladenovic, 2020. "Parallel-batching scheduling with nonlinear processing times on a single and unrelated parallel machines," Journal of Global Optimization, Springer, vol. 78(4), pages 693-715, December.
    16. Wang, Jun-Qiang & Fan, Guo-Qiang & Zhang, Yingqian & Zhang, Cheng-Wu & Leung, Joseph Y.-T., 2017. "Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes," European Journal of Operational Research, Elsevier, vol. 258(2), pages 478-490.
    17. Muter, İbrahim, 2020. "Exact algorithms to minimize makespan on single and parallel batch processing machines," European Journal of Operational Research, Elsevier, vol. 285(2), pages 470-483.
    18. Alessandro Druetto & Erica Pastore & Elena Rener, 2023. "Parallel batching with multi-size jobs and incompatible job families," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 31(2), pages 440-458, July.
    19. Zhou, Shengchao & Liu, Ming & Chen, Huaping & Li, Xueping, 2016. "An effective discrete differential evolution algorithm for scheduling uniform parallel batch processing machines with non-identical capacities and arbitrary job sizes," International Journal of Production Economics, Elsevier, vol. 179(C), pages 1-11.
    20. Yi Tan & Lars Mönch & John W. Fowler, 2018. "A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines," Journal of Scheduling, Springer, vol. 21(2), pages 209-226, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:298:y:2022:i:1:p:1-24. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.