Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling

Author

Listed:
  • Artur Alves Pessoa

    (Departamento de Engenharia de Produção, Universidade Federal Fluminense, Rua Passo da Pátria, São Domingos, 24210-240 Niterói - RJ, Brazil)

  • Teobaldo Bulhões

    (Departamento de Computação Científica, Centro de Informática, Universidade Federal da Paraíba, Rua dos Escoteiros, 58058-600 João Pessoa - PB, Brazil)

  • Vitor Nesello

    (Institut de Mathématiques de Bordeaux, Université de Bordeaux 351, Bordeaux, France)

  • Anand Subramanian

    (Departamento de Sistemas de Computação, Centro de Informática, Universidade Federal da Paraíba Rua dos Escoteiros, 58058-600 João Pessoa - PB, Brazil)

Abstract

This paper addresses a single machine total weighted tardiness (TWT) batch-scheduling problem in which jobs have release dates, nonidentical sizes, and are compatible between each other. We propose two integer linear programming models: the first one is a time-indexed formulation (TIF), and the second is an innovative time-size-indexed formulation (TSIF). Although TIF clearly outperforms the existing formulation for the problem, TSIF is capable of producing much stronger bounds in practice. The latter also enables us to develop an efficient column-generation (CG) algorithm. The pricing subproblem corresponds to a resource-constrained shortest path problem that is solved using a bucket graph–based labeling algorithm. The solutions of such a subproblem may contain cycles (reprocessing of jobs), and thus, a memory mechanism called dynamic arc-based ng -sets is employed in the labeling with a view toward avoiding some of them. Moreover, we also implement a preprocessing scheme based on Lagrangian relaxation to perform variable fixing. Extensive computational experiments were carried out in 810 benchmark instances. The proposed CG algorithm is capable of solving instances with up to 100 jobs to optimality. In addition, we believe that this is the first exact approach for a TWT batch-scheduling variant capable of systematically solving instances with up to 50 jobs. High-quality results are also reported for three special cases of the problem—more precisely, when (i) the penalty weights are unitary, (ii) there are no release dates, and (iii) all due dates are set to zero and, hence, the objective becomes equivalent to minimizing the weighted completion time. Summary of Contribution: This paper provides the first exact algorithm for a standard variant of a batch-scheduling total weighted tardiness problem that can solve instances with up to 100 jobs to optimality, a considerable leap with respect to previous works. In particular, we propose a time-indexed formulation that has the advantage of being relatively simple to implement, and yet we show that it is not theoretically dominated by the other innovative formulation proposed in the paper referred to as the time-size-indexed formulation (TSIF). Moreover, we present a Lagrangian approach to quickly fix variables and an iterative column-generation (CG) procedure over a Dantzig–Wolfe decomposition of TSIF that combines an efficient pricing algorithm with a dynamic scheme to adjust the subproblem constraints. The proposed CG approach is capable of producing very strong bounds for the problem as well as for some of its special cases.

Suggested Citation

  • Artur Alves Pessoa & Teobaldo Bulhões & Vitor Nesello & Anand Subramanian, 2022. "Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling," INFORMS Journal on Computing, INFORMS, vol. 34(3), pages 1512-1530, May.
  • Handle: RePEc:inm:orijoc:v:34:y:2022:i:3:p:1512-1530
    DOI: 10.1287/ijoc.2021.1133
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/ijoc.2021.1133
    Download Restriction: no

    File URL: https://libkey.io/10.1287/ijoc.2021.1133?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. DYER, Martin E. & WOLSEY, Laurence A., 1990. "Formulating the single machine sequencing problem with release dates as a mixed integer program," LIDAM Reprints CORE 878, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    2. E. DYER, Martin & WOLSEY, Laurence A., 1990. "Formulating the single machine sequencing problem with release dates as a mixed integer program," LIDAM Reprints CORE 917, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    3. Nicholas Wiechman & Purushothaman Damodaran, 2015. "A column generation approach for scheduling a batch processing machine with makespan objective," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 21(3), pages 334-355.
    4. J.M. van den Akker & C.A.J. Hurkens & M.W.P. Savelsbergh, 2000. "Time-Indexed Formulations for Machine Scheduling Problems: Column Generation," INFORMS Journal on Computing, INFORMS, vol. 12(2), pages 111-124, May.
    5. Sung, C. S. & Choung, Y. I., 2000. "Minimizing makespan on a single burn-in oven in semiconductor manufacturing," European Journal of Operational Research, Elsevier, vol. 120(3), pages 559-574, February.
    6. David Pisinger, 1997. "A Minimal Algorithm for the 0-1 Knapsack Problem," Operations Research, INFORMS, vol. 45(5), pages 758-767, October.
    7. Villeneuve, Daniel & Desaulniers, Guy, 2005. "The shortest path problem with forbidden paths," European Journal of Operational Research, Elsevier, vol. 165(1), pages 97-107, August.
    8. Muter, İbrahim, 2020. "Exact algorithms to minimize makespan on single and parallel batch processing machines," European Journal of Operational Research, Elsevier, vol. 285(2), pages 470-483.
    9. SOUSA, Jorge P. & WOLSEY, Laurence A., 1992. "A time indexed formulation of non-preemptive single machine scheduling problems," LIDAM Reprints CORE 984, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    10. Roberto Baldacci & Aristide Mingozzi & Roberto Roberti, 2011. "New Route Relaxation and Pricing Strategies for the Vehicle Routing Problem," Operations Research, INFORMS, vol. 59(5), pages 1269-1283, October.
    11. A. Pessoa & R. Sadykov & E. Uchoa & F. Vanderbeck, 2018. "Automation and Combination of Linear-Programming Based Stabilization Techniques in Column Generation," INFORMS Journal on Computing, INFORMS, vol. 30(2), pages 339-360, May.
    12. Onur Ozturk & Mehmet A. Begen & Gregory S. Zaric, 2017. "A branch and bound algorithm for scheduling unit size jobs on parallel batching machines to minimize makespan," International Journal of Production Research, Taylor & Francis Journals, vol. 55(6), pages 1815-1831, March.
    13. Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
    14. Stefan Irnich & Guy Desaulniers, 2005. "Shortest Path Problems with Resource Constraints," Springer Books, in: Guy Desaulniers & Jacques Desrosiers & Marius M. Solomon (ed.), Column Generation, chapter 0, pages 33-65, Springer.
    15. Vishnu Erramilli & Scott Mason, 2008. "Multiple orders per job batch scheduling with incompatible jobs," Annals of Operations Research, Springer, vol. 159(1), pages 245-260, March.
    16. Malapert, Arnaud & Guéret, Christelle & Rousseau, Louis-Martin, 2012. "A constraint programming approach for a batch processing problem with non-identical job sizes," European Journal of Operational Research, Elsevier, vol. 221(3), pages 533-545.
    17. Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
    18. Scott Webster & Kenneth R. Baker, 1995. "Scheduling Groups of Jobs on a Single Machine," Operations Research, INFORMS, vol. 43(4), pages 692-703, August.
    19. Eduardo Queiroga & Rian G. S. Pinheiro & Quentin Christ & Anand Subramanian & Artur A. Pessoa, 2021. "Iterated local search for single machine total weighted tardiness batch scheduling," Journal of Heuristics, Springer, vol. 27(3), pages 353-438, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
    2. Zhang, Han & Li, Kai & Jia, Zhao-hong & Chu, Chengbin, 2023. "Minimizing total completion time on non-identical parallel batch machines with arbitrary release times using ant colony optimization," European Journal of Operational Research, Elsevier, vol. 309(3), pages 1024-1046.
    3. de Lima, Vinícius L. & Alves, Cláudio & Clautiaux, François & Iori, Manuel & Valério de Carvalho, José M., 2022. "Arc flow formulations based on dynamic programming: Theoretical foundations and applications," European Journal of Operational Research, Elsevier, vol. 296(1), pages 3-21.
    4. Luciano Costa & Claudio Contardo & Guy Desaulniers, 2019. "Exact Branch-Price-and-Cut Algorithms for Vehicle Routing," Transportation Science, INFORMS, vol. 53(4), pages 946-985, July.
    5. Francis Sourd, 2009. "New Exact Algorithms for One-Machine Earliness-Tardiness Scheduling," INFORMS Journal on Computing, INFORMS, vol. 21(1), pages 167-175, February.
    6. Pasquale Avella & Maurizio Boccia & Bernardo D’Auria, 2005. "Near-Optimal Solutions of Large-Scale Single-Machine Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 17(2), pages 183-191, May.
    7. Lotte Berghman & Roel Leus & Frits Spieksma, 2014. "Optimal solutions for a dock assignment problem with trailer transportation," Annals of Operations Research, Springer, vol. 213(1), pages 3-25, February.
    8. Martin W. P. Savelsbergh & R. N. Uma & Joel Wein, 2005. "An Experimental Study of LP-Based Approximation Algorithms for Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 17(1), pages 123-136, February.
    9. Ruslan Sadykov & Eduardo Uchoa & Artur Pessoa, 2021. "A Bucket Graph–Based Labeling Algorithm with Application to Vehicle Routing," Transportation Science, INFORMS, vol. 55(1), pages 4-28, 1-2.
    10. Wu, Lingxiao & Wang, Shuaian & Laporte, Gilbert, 2021. "The Robust Bulk Ship Routing Problem with Batched Cargo Selection," Transportation Research Part B: Methodological, Elsevier, vol. 143(C), pages 124-159.
    11. Louis-Philippe Bigras & Michel Gamache & Gilles Savard, 2008. "Time-Indexed Formulations and the Total Weighted Tardiness Problem," INFORMS Journal on Computing, INFORMS, vol. 20(1), pages 133-142, February.
    12. Natashia Boland & Riley Clement & Hamish Waterer, 2016. "A Bucket Indexed Formulation for Nonpreemptive Single Machine Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 28(1), pages 14-30, February.
    13. Artur Pessoa & Ruslan Sadykov & Eduardo Uchoa, 2021. "Solving Bin Packing Problems Using VRPSolver Models," SN Operations Research Forum, Springer, vol. 2(2), pages 1-25, June.
    14. Rachid Benmansour & Oliver Braun & Saïd Hanafi, 2019. "The single-processor scheduling problem with time restrictions: complexity and related problems," Journal of Scheduling, Springer, vol. 22(4), pages 465-471, August.
    15. Stéphane Dauzère-Pérès & Sigrid Lise Nonås, 2023. "An improved decision support model for scheduling production in an engineer-to-order manufacturer," 4OR, Springer, vol. 21(2), pages 247-300, June.
    16. Yunpeng Pan & Zhe Liang, 2017. "Dual relaxations of the time-indexed ILP formulation for min–sum scheduling problems," Annals of Operations Research, Springer, vol. 249(1), pages 197-213, February.
    17. Ann-Kathrin Rothenbächer & Michael Drexl & Stefan Irnich, 2018. "Branch-and-Price-and-Cut for the Truck-and-Trailer Routing Problem with Time Windows," Transportation Science, INFORMS, vol. 52(5), pages 1174-1190, October.
    18. Bode, Claudia & Irnich, Stefan, 2014. "The shortest-path problem with resource constraints with (k,2)-loop elimination and its application to the capacitated arc-routing problem," European Journal of Operational Research, Elsevier, vol. 238(2), pages 415-426.
    19. Heßler, Katrin, 2021. "Exact algorithms for the multi-compartment vehicle routing problem with flexible compartment sizes," European Journal of Operational Research, Elsevier, vol. 294(1), pages 188-205.
    20. Hinder, Oliver & Mason, Andrew J., 2017. "A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness," European Journal of Operational Research, Elsevier, vol. 262(2), pages 411-423.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orijoc:v:34:y:2022:i:3:p:1512-1530. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.