IDEAS home Printed from https://ideas.repec.org/a/spr/flsman/v36y2024i2d10.1007_s10696-023-09488-9.html
   My bibliography  Save this article

A tabu-based adaptive large neighborhood search for scheduling unrelated parallel batch processing machines with non-identical job sizes and dynamic job arrivals

Author

Listed:
  • Xin Xiao

    (Central South University)

  • Bin Ji

    (Central South University)

  • Samson S. Yu

    (Deakin University)

  • Guohua Wu

    (Central South University)

Abstract

In this study, we investigate an unrelated parallel batch processing machines scheduling problem (UPBPMSP). A set of jobs with non-identical sizes and arbitrary ready times are scheduled on unrelated parallel batch processing machines with different capacities to minimize the makespan (i.e., the completion time of the last batch). Existing studies have either decomposed the scheduling problem into two sub-problems and employed population-based heuristic interaction for searching the best solutions or used neighborhood search algorithms to search the current solution’s neighborhood to find a better solution. However, the performances of these methods are not quite satisfactory due to the complicated interactions or oversimplified neighborhood search strategies, especially for large-scale UPBPMSPs. In this study, we propose a novel tabu-based adaptive large neighborhood search (TALNS) algorithm to obtain high-quality solutions for the UPBPMSP. To avoid complex interactions, we propose a new solution structure, and the proposed TALNS is applied to obtain the optimal solution structure of the UPBPMSP. Extensive experiments are conducted to evaluate the performance of the proposed algorithm on a total of 360 instances from the literature and 30 new instances. Numerical results demonstrate that the proposed TALNS outperforms the neighborhood search methods, which outperforms the population-based methods. With the proposed TALNS, 55 out of 360 instances’ best-known solutions are updated from this study.

Suggested Citation

  • Xin Xiao & Bin Ji & Samson S. Yu & Guohua Wu, 2024. "A tabu-based adaptive large neighborhood search for scheduling unrelated parallel batch processing machines with non-identical job sizes and dynamic job arrivals," Flexible Services and Manufacturing Journal, Springer, vol. 36(2), pages 409-452, June.
  • Handle: RePEc:spr:flsman:v:36:y:2024:i:2:d:10.1007_s10696-023-09488-9
    DOI: 10.1007/s10696-023-09488-9
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10696-023-09488-9
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10696-023-09488-9?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jia, Zhao-hong & Leung, Joseph Y.-T., 2015. "A meta-heuristic to minimize makespan for parallel batch machines with arbitrary job sizes," European Journal of Operational Research, Elsevier, vol. 240(3), pages 649-665.
    2. Sung, C. S. & Choung, Y. I., 2000. "Minimizing makespan on a single burn-in oven in semiconductor manufacturing," European Journal of Operational Research, Elsevier, vol. 120(3), pages 559-574, February.
    3. Jia, Zhao-hong & Li, Kai & Leung, Joseph Y.-T., 2015. "Effective heuristic for makespan minimization in parallel batch machines with non-identical capacities," International Journal of Production Economics, Elsevier, vol. 169(C), pages 1-10.
    4. Chung-Yee Lee & Reha Uzsoy & Louis A. Martin-Vega, 1992. "Efficient Algorithms for Scheduling Semiconductor Burn-In Operations," Operations Research, INFORMS, vol. 40(4), pages 764-775, August.
    5. Li, Shuguang, 2017. "Approximation algorithms for scheduling jobs with release times and arbitrary sizes on batch machines with non-identical capacities," European Journal of Operational Research, Elsevier, vol. 263(3), pages 815-826.
    6. Stefan Ropke & David Pisinger, 2006. "An Adaptive Large Neighborhood Search Heuristic for the Pickup and Delivery Problem with Time Windows," Transportation Science, INFORMS, vol. 40(4), pages 455-472, November.
    7. C Almeder & L Mönch, 2011. "Metaheuristics for scheduling jobs with incompatible families on parallel batching machines," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(12), pages 2083-2096, December.
    8. C Almeder & L Mönch, 2011. "Metaheuristics for scheduling jobs with incompatible families on parallel batching machines," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(12), pages 2083-2096, December.
    9. Muter, İbrahim, 2020. "Exact algorithms to minimize makespan on single and parallel batch processing machines," European Journal of Operational Research, Elsevier, vol. 285(2), pages 470-483.
    10. Renan Spencer Trindade & Olinto César Bassi de Araújo & Marcia Helena Costa Fampa & Felipe Martins Müller, 2018. "Modelling and symmetry breaking in scheduling problems on batch processing machines," International Journal of Production Research, Taylor & Francis Journals, vol. 56(22), pages 7031-7048, November.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
    2. Zhang, Han & Li, Kai & Jia, Zhao-hong & Chu, Chengbin, 2023. "Minimizing total completion time on non-identical parallel batch machines with arbitrary release times using ant colony optimization," European Journal of Operational Research, Elsevier, vol. 309(3), pages 1024-1046.
    3. Xu, Jun & Wang, Jun-Qiang & Liu, Zhixin, 2022. "Parallel batch scheduling: Impact of increasing machine capacity," Omega, Elsevier, vol. 108(C).
    4. Zhou, Shengchao & Xie, Jianhui & Du, Ni & Pang, Yan, 2018. "A random-keys genetic algorithm for scheduling unrelated parallel batch processing machines with different capacities and arbitrary job sizes," Applied Mathematics and Computation, Elsevier, vol. 334(C), pages 254-268.
    5. Bin Ji & Xin Xiao & Samson S. Yu & Guohua Wu, 2023. "A Hybrid Large Neighborhood Search Method for Minimizing Makespan on Unrelated Parallel Batch Processing Machines with Incompatible Job Families," Sustainability, MDPI, vol. 15(5), pages 1-25, February.
    6. Guo-Qiang Fan & Jun-Qiang Wang & Zhixin Liu, 2025. "Mixed batch scheduling with non-identical job sizes to minimize makespan," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 47(1), pages 105-127, March.
    7. Jianxin Fang & Brenda Cheang & Andrew Lim, 2023. "Problems and Solution Methods of Machine Scheduling in Semiconductor Manufacturing Operations: A Survey," Sustainability, MDPI, vol. 15(17), pages 1-44, August.
    8. Shaoxiang Zheng & Naiming Xie & Qiao Wu, 2025. "An exact approach for bi-objective non-identical batch processing machines scheduling," Annals of Operations Research, Springer, vol. 346(3), pages 2307-2347, March.
    9. Eduardo Queiroga & Rian G. S. Pinheiro & Quentin Christ & Anand Subramanian & Artur A. Pessoa, 2021. "Iterated local search for single machine total weighted tardiness batch scheduling," Journal of Heuristics, Springer, vol. 27(3), pages 353-438, June.
    10. Ozturk, Onur, 2020. "A truncated column generation algorithm for the parallel batch scheduling problem to minimize total flow time," European Journal of Operational Research, Elsevier, vol. 286(2), pages 432-443.
    11. Tian, Zheng & Zheng, Li, 2024. "Single machine parallel-batch scheduling under time-of-use electricity prices: New formulations and optimisation approaches," European Journal of Operational Research, Elsevier, vol. 312(2), pages 512-524.
    12. Bin Ji & Shujing Zhang & Samson S. Yu & Binqiao Zhang, 2023. "Mathematical Modeling and A Novel Heuristic Method for Flexible Job-Shop Batch Scheduling Problem with Incompatible Jobs," Sustainability, MDPI, vol. 15(3), pages 1-26, January.
    13. Melouk, Sharif & Damodaran, Purushothaman & Chang, Ping-Yu, 2004. "Minimizing makespan for single machine batch processing with non-identical job sizes using simulated annealing," International Journal of Production Economics, Elsevier, vol. 87(2), pages 141-147, January.
    14. Artur Alves Pessoa & Teobaldo Bulhões & Vitor Nesello & Anand Subramanian, 2022. "Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling," INFORMS Journal on Computing, INFORMS, vol. 34(3), pages 1512-1530, May.
    15. Muter, İbrahim, 2020. "Exact algorithms to minimize makespan on single and parallel batch processing machines," European Journal of Operational Research, Elsevier, vol. 285(2), pages 470-483.
    16. Jia, Zhao-hong & Li, Kai & Leung, Joseph Y.-T., 2015. "Effective heuristic for makespan minimization in parallel batch machines with non-identical capacities," International Journal of Production Economics, Elsevier, vol. 169(C), pages 1-10.
    17. Zhou, Shengchao & Liu, Ming & Chen, Huaping & Li, Xueping, 2016. "An effective discrete differential evolution algorithm for scheduling uniform parallel batch processing machines with non-identical capacities and arbitrary job sizes," International Journal of Production Economics, Elsevier, vol. 179(C), pages 1-11.
    18. Nodari Vakhania & Badri Mamporia, 2020. "Fast Algorithms for Basic Supply Chain Scheduling Problems," Mathematics, MDPI, vol. 8(11), pages 1-19, November.
    19. Li, Kai & Jia, Zhao-hong & Leung, Joseph Y.-T., 2015. "Integrated production and delivery on parallel batching machines," European Journal of Operational Research, Elsevier, vol. 247(3), pages 755-763.
    20. Damodaran, Purushothaman & Kumar Manjeshwar, Praveen & Srihari, Krishnaswami, 2006. "Minimizing makespan on a batch-processing machine with non-identical job sizes using genetic algorithms," International Journal of Production Economics, Elsevier, vol. 103(2), pages 882-891, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:flsman:v:36:y:2024:i:2:d:10.1007_s10696-023-09488-9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.