IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v34y1986i1p137-144.html
   My bibliography  Save this item

Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Paulson Gjerde, Kathy A. & Slotnick, Susan A., 2004. "Quality and reputation: The effects of external and internal factors over time," International Journal of Production Economics, Elsevier, vol. 89(1), pages 1-20, May.
  2. Khouja, Moutaz, 1999. "The single-period (news-vendor) problem: literature review and suggestions for future research," Omega, Elsevier, vol. 27(5), pages 537-553, October.
  3. Liang-Yuh Ouyang & Cheng-Ju Chuang & Chia-Huei Ho & Chien-Wei Wu, 2014. "An integrated inventory model with quality improvement and two-part credit policy," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 22(3), pages 1042-1061, October.
  4. Pilar I. Vidal-Carreras & Jose P. Garcia-Sabater & Julio J. Garcia-Sabater, 2017. "A practical model for managing inventories with unknown costs and a budget constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 118-129, January.
  5. Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
  6. Liu, Xuejuan & Wang, Wenbin & Peng, Rui, 2015. "An integrated production, inventory and preventive maintenance model for a multi-product production system," Reliability Engineering and System Safety, Elsevier, vol. 137(C), pages 76-86.
  7. Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
  8. Linguo Gong & James Pruett & Kwei Tang, 1997. "A Markovian model for process setup and improvement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(4), pages 383-400, June.
  9. Rezaei, Jafar & Salimi, Negin, 2012. "Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier," International Journal of Production Economics, Elsevier, vol. 137(1), pages 11-18.
  10. Gerardo Treviño-Garza & Krystel K. Castillo-Villar & Leopoldo Eduardo Cárdenas-Barrón, 2015. "Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(9), pages 1705-1716, July.
  11. Sana, Shib Sankar, 2010. "A production-inventory model in an imperfect production process," European Journal of Operational Research, Elsevier, vol. 200(2), pages 451-464, January.
  12. Wang, Chih-Hsiung, 2007. "Economic off-line quality control strategy with two types of inspection errors," European Journal of Operational Research, Elsevier, vol. 179(1), pages 132-147, May.
  13. Wang, Chih-Hsiung & Sheu, Shey-Heui, 2003. "Optimal lot sizing for products sold under free-repair warranty," European Journal of Operational Research, Elsevier, vol. 149(1), pages 131-141, August.
  14. Nativi, Juan Jose & Lee, Seokcheon, 2012. "Impact of RFID information-sharing strategies on a decentralized supply chain with reverse logistics operations," International Journal of Production Economics, Elsevier, vol. 136(2), pages 366-377.
  15. Gupta, Diwakar & Gerchak, Yigal, 1995. "Joint product durability and lot sizing models," European Journal of Operational Research, Elsevier, vol. 84(2), pages 371-384, July.
  16. Prasert Aengchuan & Busaba Phruksaphanrat, 2018. "Comparison of fuzzy inference system (FIS), FIS with artificial neural networks (FIS + ANN) and FIS with adaptive neuro-fuzzy inference system (FIS + ANFIS) for inventory control," Journal of Intelligent Manufacturing, Springer, vol. 29(4), pages 905-923, April.
  17. Bardia Kamrad & Ricardo Ernst, 2001. "An Economic Model for Evaluating Mining and Manufacturing Ventures with Output Yield Uncertainty," Operations Research, INFORMS, vol. 49(5), pages 690-699, October.
  18. Freiesleben, Johannes, 2008. "A proposal for an economic quality loss function," International Journal of Production Economics, Elsevier, vol. 113(2), pages 1012-1024, June.
  19. Jaber, Mohamad Y. & Bonney, Maurice, 2003. "Lot sizing with learning and forgetting in set-ups and in product quality," International Journal of Production Economics, Elsevier, vol. 83(1), pages 95-111, January.
  20. Suárez, Freddy F. & Cusumano, Michael A., 1954- & Fine, Charles H., 1991. "Flexibility and performance : a literature critique and strategic framework," Working papers 3298-91., Massachusetts Institute of Technology (MIT), Sloan School of Management.
  21. Souheil Ayed & Zied Hajej & Sadok Turki & Nidhal Rezg, 2017. "FPA method for optimal production planning under availability/degradation machine and subcontracting constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2135-2148, April.
  22. J-C Tsou & J-M Chen, 2005. "Dynamic model for a defective production system with Poka-Yoke," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(7), pages 799-803, July.
  23. W. Pearn & R. Su & M. Weng & C. Hsu, 2011. "Optimal production run time for two-stage production system with imperfect processes and allowable shortages," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 19(4), pages 533-545, December.
  24. Yassine, Ali & Maddah, Bacel & Salameh, Moueen, 2012. "Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model," International Journal of Production Economics, Elsevier, vol. 135(1), pages 345-352.
  25. Vickson, Raymond G. & Hassini, Elkafi, 2006. "Lot streaming for quality control in two-stage batch production," European Journal of Operational Research, Elsevier, vol. 170(3), pages 824-843, May.
  26. Li, Xiang, 2020. "Reducing channel costs by investing in smart supply chain technologies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 137(C).
  27. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
  28. Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
  29. Dangol, Ramesh & Bahl, Mona & Karpak, Birsen, 2015. "Timing cooperative relationships with sequential capability development process to reduce capability development trade-offs," International Journal of Production Economics, Elsevier, vol. 169(C), pages 179-189.
  30. Zequeira, Romulo I. & Valdes, Jose E. & Berenguer, Christophe, 2008. "Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability," International Journal of Production Economics, Elsevier, vol. 111(2), pages 686-696, February.
  31. Kulkarni, Shailesh & Prybutok, Victor, 2004. "Process investment and loss functions: Models and analysis," European Journal of Operational Research, Elsevier, vol. 157(1), pages 120-129, August.
  32. Chang, Hung-Chi & Ho, Chia-Huei, 2010. "Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering"," Omega, Elsevier, vol. 38(3-4), pages 233-237, June.
  33. Darwish, M.A. & Ben-Daya, M., 2007. "Effect of inspection errors and preventive maintenance on a two-stage production inventory system," International Journal of Production Economics, Elsevier, vol. 107(1), pages 301-313, May.
  34. Chiu, Yuan-Shyi Peter & Chang, Huei-Hsin, 2014. "Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note," Economic Modelling, Elsevier, vol. 37(C), pages 143-148.
  35. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
  36. Jaber, Mohamad Y. & Guiffrida, Alfred L., 2004. "Learning curves for processes generating defects requiring reworks," European Journal of Operational Research, Elsevier, vol. 159(3), pages 663-672, December.
  37. P K Tripathy & W-M Wee & P R Majhi, 2003. "An EOQ model with process reliability considerations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(5), pages 549-554, May.
  38. Guu, Sy-Ming & Zhang, Alex X., 2003. "The finite multiple lot sizing problem with interrupted geometric yield and holding costs," European Journal of Operational Research, Elsevier, vol. 145(3), pages 635-644, March.
  39. Liu, Xingchu & Cetinkaya, Sila, 2007. "A note on "quality improvement and setup reduction in the joint economic lot size model"," European Journal of Operational Research, Elsevier, vol. 182(1), pages 194-204, October.
  40. Taleizadeh, Ata Allah & Khanbaglo, Mahboobeh Perak Sari & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "An EOQ inventory model with partial backordering and reparation of imperfect products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 418-434.
  41. Kulkarni, Shailesh S., 2008. "Loss-based quality costs and inventory planning: General models and insights," European Journal of Operational Research, Elsevier, vol. 188(2), pages 428-449, July.
  42. M Khouja, 2003. "Synchronization in supply chains: implications for design and management," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(9), pages 984-994, September.
  43. Karipidis, Philippos I., 2011. "Market evaluations of dimensions of design quality," International Journal of Production Economics, Elsevier, vol. 129(2), pages 292-301, February.
  44. Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
  45. Giri, B.C. & Dohi, T., 2007. "Inspection scheduling for imperfect production processes under free repair warranty contract," European Journal of Operational Research, Elsevier, vol. 183(1), pages 238-252, November.
  46. Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
  47. Jaber, Mohamad Y. & Guiffrida, Alfred L., 2008. "Learning curves for imperfect production processes with reworks and process restoration interruptions," European Journal of Operational Research, Elsevier, vol. 189(1), pages 93-104, August.
  48. Thomas Sloan, 2008. "Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(2), pages 116-129, March.
  49. Ding, Jie & Gong, Linguo, 2008. "The effect of testing equipment shift on optimal decisions in a repetitive testing process," European Journal of Operational Research, Elsevier, vol. 186(1), pages 330-350, April.
  50. Sher, Mikhail M. & Kim, Seung-Lae & Banerjee, Avijit & Paz, Michael T., 2018. "A supply chain coordination mechanism for common items subject to failure in the electronics, defense, and medical industries," International Journal of Production Economics, Elsevier, vol. 203(C), pages 164-173.
  51. Peter McKenzie & Shekhar Jayanthi, 2007. "Ball Aerospace Explores Operational and Financial Trade-Offs in Batch Sizing in Implementing JIT," Interfaces, INFORMS, vol. 37(2), pages 108-119, April.
  52. Jing Wu & Dan Zhang & Yang Yang & Gongshu Wang & Lijie Su, 2022. "Multi-Stage Multi-Product Production and Inventory Planning for Cold Rolling under Random Yield," Mathematics, MDPI, vol. 10(4), pages 1-21, February.
  53. Liao, Gwo-Liang & Chen, Yen Hung & Sheu, Shey-Huei, 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance," European Journal of Operational Research, Elsevier, vol. 195(2), pages 348-357, June.
  54. Waqas Ahmed & Muhammad Jalees & Muhammad Omair & Zainab Mukhtar & Muhammad Imran, 2022. "An inventory management for global supply chain through reworking of defective items having positive inventory level under multi-trade-credit-period," Annals of Operations Research, Springer, vol. 315(1), pages 1-28, August.
  55. Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
  56. Chiu, Singa Wang & Liang, Gang-Ming & Chiu, Yuan-Shyi Peter & Chiu, Tiffany, 2019. "Production planning incorporating issues of reliability and backlogging with service level constraint," Operations Research Perspectives, Elsevier, vol. 6(C).
  57. B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
  58. Chayanika Rout & Ravi Shankar Kumar & Debjani Chakraborty & Adrijit Goswami, 2019. "An EPQ model for deteriorating items with imperfect production, inspection errors, rework and shortages : a type-2 fuzzy approach," OPSEARCH, Springer;Operational Research Society of India, vol. 56(3), pages 657-688, September.
  59. Borrero, J.S. & Akhavan-Tabatabaei, R., 2013. "Time and inventory dependent optimal maintenance policies for single machine workstations: An MDP approach," European Journal of Operational Research, Elsevier, vol. 228(3), pages 545-555.
  60. Mitali Sarkar & Biswajit Sarkar, 2019. "Optimization of Safety Stock under Controllable Production Rate and Energy Consumption in an Automated Smart Production Management," Energies, MDPI, vol. 12(11), pages 1-16, May.
  61. Kevin Hsu, Wen-Kai & Yu, Hong-Fwu, 2009. "EOQ model for imperfective items under a one-time-only discount," Omega, Elsevier, vol. 37(5), pages 1018-1026, October.
  62. Biswajit Sarkar & Waqas Ahmed & Seok-Beom Choi & Muhammad Tayyab, 2018. "Sustainable Inventory Management for Environmental Impact through Partial Backordering and Multi-Trade-Credit-Period," Sustainability, MDPI, vol. 10(12), pages 1-28, December.
  63. Yosef Daryanto & Hui Ming Wee & Gede Agus Widyadana, 2019. "Low Carbon Supply Chain Coordination for Imperfect Quality Deteriorating Items," Mathematics, MDPI, vol. 7(3), pages 1-24, March.
  64. Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
  65. Ashoke Kumar Bera & Dipak Kumar Jana, 2017. "Multi-item imperfect production inventory model in Bi-fuzzy environments," OPSEARCH, Springer;Operational Research Society of India, vol. 54(2), pages 260-282, June.
  66. Jaber, Mohamad Y. & Bonney, Maurice & Guiffrida, Alfred L., 2010. "Coordinating a three-level supply chain with learning-based continuous improvement," International Journal of Production Economics, Elsevier, vol. 127(1), pages 27-38, September.
  67. M. Hariga & M. Ben‐Daya, 1998. "Note: The economic manufacturing lot‐sizing problem with imperfect production processes: Bounds and optimal solutions," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(4), pages 423-433, June.
  68. George Li & S. Rajagopalan, 1998. "Process Improvement, Quality, and Learning Effects," Management Science, INFORMS, vol. 44(11-Part-1), pages 1517-1532, November.
  69. Dipak Barman & Gour Chandra Mahata, 2022. "Two-echelon production inventory model with imperfect quality items with ordering cost reduction depending on controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(5), pages 2656-2671, October.
  70. Defersha, Fantahun M. & Chen, Mingyuan, 2008. "A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality," European Journal of Operational Research, Elsevier, vol. 187(1), pages 46-69, May.
  71. Oner, Selma & Bilgic, Taner, 2008. "Economic lot scheduling with uncontrolled co-production," European Journal of Operational Research, Elsevier, vol. 188(3), pages 793-810, August.
  72. M. Ganesh Kumar & R. Uthayakumar, 2017. "An integrated single vendor–buyer inventory model for imperfect production process with stochastic demand in controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1041-1054, November.
  73. Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
  74. W. C. Tsai & Neng-Hui Shih & Chih-Hsiung Wang, 2018. "The effects of inspection delay and restoration cost on the optimal inspection and production policy," OPSEARCH, Springer;Operational Research Society of India, vol. 55(1), pages 187-195, March.
  75. Aditi Khanna & Aakanksha Kishore & Biswajit Sarkar & Chandra K. Jaggi, 2018. "Supply Chain with Customer-Based Two-Level Credit Policies under an Imperfect Quality Environment," Mathematics, MDPI, vol. 6(12), pages 1-35, December.
  76. Wang, Yunzeng & Gerchak, Yigal, 1996. "Continuous review inventory control when capacity is variable," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 381-388, August.
  77. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
  78. R. Patro & Mitali M. Nayak & M. Acharya, 2019. "An EOQ model for fuzzy defective rate with allowable proportionate discount," OPSEARCH, Springer;Operational Research Society of India, vol. 56(1), pages 191-215, March.
  79. Tien-Yu Lin & Kuo-Lung Hou, 2015. "An imperfect quality economic order quantity with advanced receiving," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 535-551, July.
  80. Shoshana Anily & Abraham Grosfeld-Nir, 2006. "An Optimal Lot-Sizing and Offline Inspection Policy in the Case of Nonrigid Demand," Operations Research, INFORMS, vol. 54(2), pages 311-323, April.
  81. Bendavid, Illana & Herer, Yale T., 2009. "Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control," European Journal of Operational Research, Elsevier, vol. 195(1), pages 139-155, May.
  82. Da Wen & Pan Ershun & Wang Ying & Liao Wenzhu, 2016. "An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy," Journal of Intelligent Manufacturing, Springer, vol. 27(6), pages 1323-1333, December.
  83. Noura Yassine, 2020. "A sustainable economic production model: effects of quality and emissions tax from transportation," Annals of Operations Research, Springer, vol. 290(1), pages 73-94, July.
  84. Liao, Gwo-Liang & Sheu, Shey-Huei, 2011. "Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 130(1), pages 118-124, March.
  85. Jaber, Mohamad Y. & Khan, Mehmood, 2010. "Managing yield by lot splitting in a serial production line with learning, rework and scrap," International Journal of Production Economics, Elsevier, vol. 124(1), pages 32-39, March.
  86. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
  87. Golmohammadi, Amirmohsen & Taghavi, Majid & Farivar, Samira & Azad, Nader, 2018. "Three strategies for engaging a buyer in supplier development efforts," International Journal of Production Economics, Elsevier, vol. 206(C), pages 1-14.
  88. Liao, Gwo-Liang, 2007. "Optimal production correction and maintenance policy for imperfect process," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1140-1149, November.
  89. Lee, Hsu-Hua, 2008. "The investment model in preventive maintenance in multi-level production systems," International Journal of Production Economics, Elsevier, vol. 112(2), pages 816-828, April.
  90. Ivan Darma Wangsa & Hui Ming Wee & Shih-Hsien Tseng, 2019. "A coordinated vendor–buyer system considering loss and damage claims, insurance cost and stochastic lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 384-398, June.
  91. Nourelfath, Mustapha & Nahas, Nabil & Ben-Daya, Mohamed, 2016. "Integrated preventive maintenance and production decisions for imperfect processes," Reliability Engineering and System Safety, Elsevier, vol. 148(C), pages 21-31.
  92. Yu-Chung Tsao, 2015. "A piecewise nonlinear optimization for a production-inventory model under maintenance, variable setup costs, and trade credits," Annals of Operations Research, Springer, vol. 233(1), pages 465-481, October.
  93. C. K. Sivashankari & R. Valarmathi, 2023. "Optimal pricing and production lot-size policies in imperfect production system with price-sensitive demand, reworking, scrap, and sales return," Operational Research, Springer, vol. 23(3), pages 1-28, September.
  94. Li, Dong & Nagurney, Anna, 2015. "A general multitiered supply chain network model of quality competition with suppliers," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 336-356.
  95. Darwish, M.A., 2008. "EPQ models with varying setup cost," International Journal of Production Economics, Elsevier, vol. 113(1), pages 297-306, May.
  96. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
  97. Nita Shah & Monika Naik, 2019. "Coordinated production, ordering, shipment and pricing model for supplier-retailer inventory system under trade credit," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 29(2), pages 55-76.
  98. K-L Hou, 2005. "Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 346-350, March.
  99. Xiao, Wei & Li, Kai & Fu, Hong, 2021. "Quality investment in a decentralized assembly system with backward shareholding," International Journal of Production Economics, Elsevier, vol. 242(C).
  100. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
  101. Nasr, Walid W. & Maddah, Bacel & Salameh, Moueen K., 2013. "EOQ with a correlated binomial supply," International Journal of Production Economics, Elsevier, vol. 144(1), pages 248-255.
  102. Ouyang, Liang-Yuh & Chang, Chun-Tao, 2013. "Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging," International Journal of Production Economics, Elsevier, vol. 144(2), pages 610-617.
  103. Khan, M. & Jaber, M.Y. & Wahab, M.I.M., 2010. "Economic order quantity model for items with imperfect quality with learning in inspection," International Journal of Production Economics, Elsevier, vol. 124(1), pages 87-96, March.
  104. Hong, Jae-Dong & Kim, Seung-Lae & Hayya, Jack C., 1996. "Dynamic setup reduction in production lot sizing with nonconstant deterministic demand," European Journal of Operational Research, Elsevier, vol. 90(1), pages 182-196, April.
  105. Voros, Jozsef, 2002. "Product balancing under conditions of quality inflation, cost pressures and growth strategies," European Journal of Operational Research, Elsevier, vol. 141(1), pages 153-166, August.
  106. Marchi, B. & Zanoni, S. & Zavanella, L.E. & Jaber, M.Y., 2019. "Supply chain models with greenhouse gases emissions, energy usage, imperfect process under different coordination decisions," International Journal of Production Economics, Elsevier, vol. 211(C), pages 145-153.
  107. Priyamvada & Prerna Gautam & Aditi Khanna, 2021. "Sustainable production strategies for deteriorating and imperfect quality items with an investment in preservation technology," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 12(5), pages 910-918, October.
  108. Cordon, Carlos, 1995. "Quality defaults and work-in-process inventory," European Journal of Operational Research, Elsevier, vol. 80(2), pages 240-251, January.
  109. Fakher, Hossein Beheshti & Nourelfath, Mustapha & Gendreau, Michel, 2018. "Integrating production, maintenance and quality: A multi-period multi-product profit-maximization model," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 191-201.
  110. Zhang, Jianzhong & Xu, Chengxian, 2010. "Inverse optimization for linearly constrained convex separable programming problems," European Journal of Operational Research, Elsevier, vol. 200(3), pages 671-679, February.
  111. Sraboni Mandal & Danish Ali Khan, 2015. "Integrated inventory model with uniform demand for one vendor one customer," International Journal of Business Performance and Supply Chain Modelling, Inderscience Enterprises Ltd, vol. 7(1), pages 36-52.
  112. Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
  113. R. Uthayakumar & M. Rameswari, 2012. "An Economic Production Quantity Model for Defective Items with Trapezoidal type Demand Rate," Journal of Optimization Theory and Applications, Springer, vol. 154(3), pages 1055-1079, September.
  114. Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
  115. Chiu, Singa Wang & Pai, Fan-Yun & Wu, Wen Kuei, 2013. "Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework," Economic Modelling, Elsevier, vol. 35(C), pages 593-596.
  116. Izzet Sahin & Hakan Polatoglu, 1995. "Distributions of manufacturer's and user's replacement costs under warranty," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(8), pages 1233-1250, December.
  117. Chandrashekar, Ashok & Callarman, Thomas E., 1998. "A modelling study of the effects of continuous incremental improvement in the case of a process shop," European Journal of Operational Research, Elsevier, vol. 109(1), pages 111-121, August.
  118. Abraham Grosfeld‐Nir & Eyal Cohen & Yigal Gerchak, 2007. "Production to order and off‐line inspection when the production process is partially observable," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(8), pages 845-858, December.
  119. Veldman, Jasper & Gaalman, Gerard, 2014. "A model of strategic product quality and process improvement incentives," International Journal of Production Economics, Elsevier, vol. 149(C), pages 202-210.
  120. Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
  121. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
  122. Freimer, Michael & Thomas, Douglas & Tyworth, John, 2006. "The value of setup cost reduction and process improvement for the economic production quantity model with defects," European Journal of Operational Research, Elsevier, vol. 173(1), pages 241-251, August.
  123. Gyu C. Kim & Marc J. Schniederjans, 2000. "Use of Short-run Statistical Process Control Techniques: A Comparison of JIT and Non-JIT Manufacturing," American Journal of Business, Emerald Group Publishing, vol. 15(1), pages 21-30.
  124. Abu Hashan Md Mashud & Dipa Roy & Yosef Daryanto & Mohd Helmi Ali, 2020. "A Sustainable Inventory Model with Imperfect Products, Deterioration, and Controllable Emissions," Mathematics, MDPI, vol. 8(11), pages 1-21, November.
  125. Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
  126. Yimin Wang & Wendell Gilland & Brian Tomlin, 2010. "Mitigating Supply Risk: Dual Sourcing or Process Improvement?," Manufacturing & Service Operations Management, INFORMS, vol. 12(3), pages 489-510, September.
  127. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2009. "Production lot sizing with process deterioration and machine breakdown under inspection schedule," Omega, Elsevier, vol. 37(2), pages 257-271, April.
  128. Kaijie Zhu & Rachel Q. Zhang & Fugee Tsung, 2007. "Pushing Quality Improvement Along Supply Chains," Management Science, INFORMS, vol. 53(3), pages 421-436, March.
  129. Kim, DaeSoo & Lee, Won J., 1998. "Optimal joint pricing and lot sizing with fixed and variable capacity," European Journal of Operational Research, Elsevier, vol. 109(1), pages 212-227, August.
  130. Subhendu Ruidas & Mijanur Rahaman Seikh & Prasun Kumar Nayak, 2020. "An EPQ model with stock and selling price dependent demand and variable production rate in interval environment," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(2), pages 385-399, April.
  131. Gérard P. Cachon & Karan Girotra & Serguei Netessine, 2020. "Interesting, Important, and Impactful Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 22(1), pages 214-222, January.
  132. Maity, K. & Maiti, M., 2007. "Possibility and necessity constraints and their defuzzification--A multi-item production-inventory scenario via optimal control theory," European Journal of Operational Research, Elsevier, vol. 177(2), pages 882-896, March.
  133. Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.
  134. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2007. "An integrated vendor-buyer inventory model with quality improvement and lead time reduction," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 349-358, July.
  135. Gong, Qiguo & Chen, Guohui & Zhang, Wen & Wang, Hui, 2022. "The role of humans in flexible smart factories," International Journal of Production Economics, Elsevier, vol. 254(C).
  136. Yeh, Ruey Huei & Ho, Wen-Tsung & Tseng, Sheng-Tsaing, 2000. "Optimal production run length for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 120(3), pages 575-582, February.
  137. Freiesleben, Johannes, 2010. "Proposing a new approach to discussing economic effects of design quality," International Journal of Production Economics, Elsevier, vol. 124(2), pages 348-359, April.
  138. L-C Lin & K-L Hou, 2005. "An inventory system with investment to reduce yield variability and set-up cost," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(1), pages 67-74, January.
  139. T W Sloan, 2004. "A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 647-656, June.
  140. Khan, M. & Jaber, M.Y. & Guiffrida, A.L. & Zolfaghari, S., 2011. "A review of the extensions of a modified EOQ model for imperfect quality items," International Journal of Production Economics, Elsevier, vol. 132(1), pages 1-12, July.
  141. Bazan, Ehab & Jaber, Mohamad Y. & Zanoni, Simone & Zavanella, Lucio E., 2014. "Vendor Managed Inventory (VMI) with Consignment Stock (CS) agreement for a two-level supply chain with an imperfect production process with/without restoration interruptions," International Journal of Production Economics, Elsevier, vol. 157(C), pages 289-301.
  142. Subhendu Ruidas & Mijanur Rahaman Seikh & Prasun Kumar Nayak, 2022. "A production-repairing inventory model considering demand and the proportion of defective items as rough intervals," Operational Research, Springer, vol. 22(3), pages 2803-2829, July.
  143. Sana, Shib Sankar & Goyal, Suresh Kumar & Chaudhuri, Kripasindhu, 2007. "An imperfect production process in a volume flexible inventory model," International Journal of Production Economics, Elsevier, vol. 105(2), pages 548-559, February.
  144. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
  145. Wang, Chih-Hsiung, 2009. "Determining the optimal probing lot size for the wafer probe operation in semiconductor manufacturing," European Journal of Operational Research, Elsevier, vol. 197(1), pages 126-133, August.
  146. Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
  147. Voros, Jozsef, 1999. "Lot sizing with quality improvement and setup time reduction," European Journal of Operational Research, Elsevier, vol. 113(3), pages 568-574, March.
  148. Jaber, M.Y. & Bonney, M. & Moualek, I., 2009. "An economic order quantity model for an imperfect production process with entropy cost," International Journal of Production Economics, Elsevier, vol. 118(1), pages 26-33, March.
  149. Soumya Kanti Hota & Biswajit Sarkar & Santanu Kumar Ghosh, 2020. "Effects of Unequal Lot Size and Variable Transportation in Unreliable Supply Chain Management," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
  150. Tang, Kwei & Gong, Linguo & Chang, Dong-Shang, 2003. "Optimal process control policies under a time-varying cost structure," European Journal of Operational Research, Elsevier, vol. 149(1), pages 197-210, August.
  151. Ying-Ju Chen & Brian Tomlin & Yimin Wang, 2013. "Coproduct Technologies: Product Line Design and Process Innovation," Management Science, INFORMS, vol. 59(12), pages 2772-2789, December.
  152. Nitish Jain & Sameer Hasija & Dana G. Popescu, 2013. "Optimal Contracts for Outsourcing of Repair and Restoration Services," Operations Research, INFORMS, vol. 61(6), pages 1295-1311, December.
  153. Zheng, Yanyan & Zhao, Yingxue & Wang, Nengmin & Meng, Xiaoge & Yang, Honglin, 2022. "Financing decision for a remanufacturing supply chain with a capital constrained retailer: A study from the perspective of market uncertainty," International Journal of Production Economics, Elsevier, vol. 245(C).
  154. Rini & Priyamvada & Chandra K. Jaggi, 2021. "Sustainable and flexible production system for a deteriorating item with quality consideration," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 12(5), pages 951-960, October.
  155. Ongkunaruk, P. & Wahab, M.I.M. & Chen, Y., 2016. "A genetic algorithm for a joint replenishment problem with resource and shipment constraints and defective items," International Journal of Production Economics, Elsevier, vol. 175(C), pages 142-152.
  156. Ki Ling Cheung & Warren H. Hausman, 1997. "Joint determination of preventive maintenance and safety stocks in an unreliable production environment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(3), pages 257-272, April.
  157. Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
  158. H. Dharma Kwon, 2010. "Invest or Exit? Optimal Decisions in the Face of a Declining Profit Stream," Operations Research, INFORMS, vol. 58(3), pages 638-649, June.
  159. Wakhid Ahmad Jauhari & I Nyoman Pujawan & Mokh Suef, 2023. "Sustainable inventory management with hybrid production system and investment to reduce defects," Annals of Operations Research, Springer, vol. 324(1), pages 543-572, May.
  160. S. Andrew Starbird, 1997. "Acceptance sampling, imperfect production, and the optimality of zero defects," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 515-530, September.
  161. Viliam Makis, 1998. "Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(2), pages 165-186, March.
  162. Bimal Kumar Sett & Bikash Koli Dey & Biswajit Sarkar, 2020. "Autonomated Inspection Policy for Smart Factory—An Improved Approach," Mathematics, MDPI, vol. 8(10), pages 1-19, October.
  163. Abraham Grosfeld-Nir & Yigal Gerchak & Qi-Ming He, 2000. "Manufacturing to Order with Random Yield and Costly Inspection," Operations Research, INFORMS, vol. 48(5), pages 761-767, October.
  164. Lie-Fern Hsu & Jia-Tzer Hsu, 2016. "Economic production quantity (EPQ) models under an imperfect production process with shortages backordered," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(4), pages 852-867, March.
  165. Vörös, József, 2003. "A minőség figyelembevételének szükségessége az egyensúlyi állapot meghatározásában [The need to consider quality when determining a state of equilibrium]," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(1), pages 6-21.
  166. Anna Nagurney & Dong Li, 2015. "A supply chain network game theory model with product differentiation, outsourcing of production and distribution, and quality and price competition," Annals of Operations Research, Springer, vol. 226(1), pages 479-503, March.
  167. Hsieh, Chung-Chi & Lee, Zong-Zhe, 2005. "Joint determination of production run length and number of standbys in a deteriorating production process," European Journal of Operational Research, Elsevier, vol. 162(2), pages 359-371, April.
  168. Khouja, Moutaz & Goyal, Suresh, 2008. "A review of the joint replenishment problem literature: 1989-2005," European Journal of Operational Research, Elsevier, vol. 186(1), pages 1-16, April.
  169. Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
  170. Hyun Kim, Chang & Hong, Yushin, 1999. "An optimal production run length in deteriorating production processes," International Journal of Production Economics, Elsevier, vol. 58(2), pages 183-189, January.
  171. Sy-Ming Guu & Chun-Yi Lin, 2018. "The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico’s heuristic," Annals of Operations Research, Springer, vol. 269(1), pages 167-183, October.
  172. Liang-Yuh Ouyang & Chun-Tao Chang & Philip Shum, 2012. "The EOQ with defective items and partially permissible delay in payments linked to order quantity derived algebraically," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 20(1), pages 141-160, March.
  173. Sarkar, Biswajit & Moon, Ilkyeong, 2014. "Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 204-213.
  174. Naoufel Cheikhrouhou & Biswajit Sarkar & Baishakhi Ganguly & Asif Iqbal Malik & Rafael Batista & Young Hae Lee, 2018. "Optimization of sample size and order size in an inventory model with quality inspection and return of defective items," Annals of Operations Research, Springer, vol. 271(2), pages 445-467, December.
  175. Ching‐Chin Chern & Ping Yang, 1999. "Determining a threshold control policy for an imperfect production system with rework jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(3), pages 273-301, April.
  176. Emre Berk & Onurcan Ayas & M. Ali Ülkü, 2023. "Optimizing Process-Improvement Efforts for Supply Chain Operations under Disruptions: New Structural Results," Sustainability, MDPI, vol. 15(17), pages 1-23, August.
  177. Hong, Jae-Dong, 1997. "Optimal production cycles, procurement schedules, and joint investment in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 100(3), pages 413-428, August.
  178. Asif Iqbal Malik & Biswajit Sarkar, 2019. "Coordinating Supply-Chain Management under Stochastic Fuzzy Environment and Lead-Time Reduction," Mathematics, MDPI, vol. 7(5), pages 1-28, May.
  179. Liu, John J. & Yang, Ping, 1996. "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," European Journal of Operational Research, Elsevier, vol. 91(3), pages 517-527, June.
  180. Chen, Cheng-Kang & Lo, Chih-Chung & Liao, Yi-Xiang, 2008. "Optimal lot size with learning consideration on an imperfect production system with allowable shortages," International Journal of Production Economics, Elsevier, vol. 113(1), pages 459-469, May.
  181. Stephen M. Gilbert & Hena M Bar, 1999. "The value of observing the condition of a deteriorating machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(7), pages 790-808, October.
  182. Tiwari, Sunil & Kazemi, Nima & Modak, Nikunja Mohan & Cárdenas-Barrón, Leopoldo Eduardo & Sarkar, Sumon, 2020. "The effect of human errors on an integrated stochastic supply chain model with setup cost reduction and backorder price discount," International Journal of Production Economics, Elsevier, vol. 226(C).
  183. Sudipta Sinha & Nikunja Mohan Modak & Shib Sankar Sana, 2020. "An entropic order quantity inventory model for quality assessment considering price sensitive demand," OPSEARCH, Springer;Operational Research Society of India, vol. 57(1), pages 88-103, March.
  184. Maddah, Bacel & Moussawi, Lama & Jaber, Mohamad Y., 2010. "Lot sizing with a Markov production process and imperfect items scrapped," International Journal of Production Economics, Elsevier, vol. 124(2), pages 340-347, April.
  185. Wee, H.M. & Yu, Jonas & Chen, M.C., 2007. "Optimal inventory model for items with imperfect quality and shortage backordering," Omega, Elsevier, vol. 35(1), pages 7-11, February.
  186. El-Ferik, Sami, 2008. "Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy," European Journal of Operational Research, Elsevier, vol. 186(1), pages 150-163, April.
  187. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
  188. Ben-Daya, Mohamed, 2002. "The economic production lot-sizing problem with imperfect production processes and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 76(3), pages 257-264, April.
  189. Richter, Knut, 1996. "The EOQ repair and waste disposal model with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 95(2), pages 313-324, December.
  190. R. Udayakumar & S. Priyan & Mandeep Mittal & Anuwat Jirawattanapanit & Grienggrai Rajchakit & Pramet Kaewmesri, 2022. "A Sustainable Production Scheduling with Backorders under Different Forms of Rework Process and Green Investment," Sustainability, MDPI, vol. 14(24), pages 1-38, December.
  191. M. Jaber & Z. Givi, 2015. "Imperfect production process with learning and forgetting effects," Computational Management Science, Springer, vol. 12(1), pages 129-152, January.
  192. Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
  193. B. C. Giri & T Chakraborty, 2007. "Optimal production, maintenance, and warranty strategies for item sold with rebate combination warranty," Journal of Risk and Reliability, , vol. 221(4), pages 257-264, December.
  194. Fine, Charles H., 1989. "Developments in manufacturing technology and economic evaluation models," Working papers 3012-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
  195. Awasthy, Prakash & Hazra, Jishnu, 2020. "Collaboration under outcome-based contracts for information technology services," European Journal of Operational Research, Elsevier, vol. 286(1), pages 350-359.
  196. Monami Das Roy & Shib Sankar Sana, 2021. "Inter-dependent lead-time and ordering cost reduction strategy: a supply chain model with quality control, lead-time dependent backorder and price-sensitive stochastic demand," OPSEARCH, Springer;Operational Research Society of India, vol. 58(3), pages 690-710, September.
  197. Nadeau, Marie-Claude & Kar, Ashish & Roth, Richard & Kirchain, Randolph, 2010. "A dynamic process-based cost modeling approach to understand learning effects in manufacturing," International Journal of Production Economics, Elsevier, vol. 128(1), pages 223-234, November.
  198. Wahab, M.I.M. & Mamun, S.M.H. & Ongkunaruk, P., 2011. "EOQ models for a coordinated two-level international supply chain considering imperfect items and environmental impact," International Journal of Production Economics, Elsevier, vol. 134(1), pages 151-158, November.
  199. R. Canan Savaskan & Shantanu Bhattacharya & Luk N. Van Wassenhove, 2004. "Closed-Loop Supply Chain Models with Product Remanufacturing," Management Science, INFORMS, vol. 50(2), pages 239-252, February.
  200. Quigley, John & Walls, Lesley & Demirel, Güven & MacCarthy, Bart L. & Parsa, Mahdi, 2018. "Supplier quality improvement: The value of information under uncertainty," European Journal of Operational Research, Elsevier, vol. 264(3), pages 932-947.
  201. Jaber, Mohamad Y. & Zanoni, Simone & Zavanella, Lucio E., 2014. "Economic order quantity models for imperfect items with buy and repair options," International Journal of Production Economics, Elsevier, vol. 155(C), pages 126-131.
  202. White, Richard E. & Prybutok, Victor, 2001. "The relationship between JIT practices and type of production system," Omega, Elsevier, vol. 29(2), pages 113-124, April.
  203. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
  204. Williams, William W. & Tang, Kwei & Gong, Linguo, 2000. "Process improvement for a container-filling process with random shifts," International Journal of Production Economics, Elsevier, vol. 66(1), pages 23-31, June.
  205. Ganeshan, Ram & Kulkarni, Shailesh & Boone, Tonya, 2001. "Production economics and process quality: A Taguchi perspective," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 343-350, May.
  206. Yeh, Ruey Huei & Chen, Tzu-Hui, 2006. "Optimal lot size and inspection policy for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 174(2), pages 766-776, October.
  207. Dey, O. & Giri, B.C., 2014. "Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 222-228.
  208. Khan, Mehmood & Jaber, Mohamad Y. & Bonney, Maurice, 2011. "An economic order quantity (EOQ) for items with imperfect quality and inspection errors," International Journal of Production Economics, Elsevier, vol. 133(1), pages 113-118, September.
  209. Wang, Chih-Hsiung, 2005. "Integrated production and product inspection policy for a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 95(1), pages 123-134, January.
  210. Michael Alles & Amin Amershi & Srikant Datar & Ratna Sarkar, 2000. "Information and Incentive Effects of Inventory in JIT Production," Management Science, INFORMS, vol. 46(12), pages 1528-1544, December.
  211. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
  212. Chih‐Hsiung Wang, 2006. "Optimal production and maintenance policy for imperfect production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(2), pages 151-156, March.
  213. Irfanullah Khan & Jihed Jemai & Han Lim & Biswajit Sarkar, 2019. "Effect of Electrical Energy on the Manufacturing Setup Cost Reduction, Transportation Discounts, and Process Quality Improvement in a Two-Echelon Supply Chain Management under a Service-Level Constrai," Energies, MDPI, vol. 12(19), pages 1-32, September.
  214. Gu, Wei & Li, Meng & Wang, Chen & Shang, Jennifer & Wei, Lirong, 2021. "Strategic sourcing selection for bike-sharing rebalancing: An evolutionary game approach," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 156(C).
  215. Diaby, Moustapha, 1995. "Optimal setup time reduction for a single product with dynamic demands," European Journal of Operational Research, Elsevier, vol. 85(3), pages 532-540, September.
  216. Gong, Linguo, 2012. "The effect of testing errors on a repetitive testing process," European Journal of Operational Research, Elsevier, vol. 220(1), pages 115-124.
  217. Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.