IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v55y2017i8p2135-2148.html
   My bibliography  Save this article

FPA method for optimal production planning under availability/degradation machine and subcontracting constraint

Author

Listed:
  • Souheil Ayed
  • Zied Hajej
  • Sadok Turki
  • Nidhal Rezg

Abstract

This work treats an industrial problematic of a manufacturing system M1 subject to random failure and that satisfies a random demand under required service level. To ensure the satisfaction of the demand, it calls up on a second manufacturing system M2 that is a subcontractor and has a stochastic service level. This paper aims to determine an optimal production plan taking into account the degradation of the manufacturing system following its production rate and its availability. The unavailability of the machine M1 is due to the non-negligible preventive and corrective maintenance actions duration. To consider a realistic case of the subcontractor, we consider that is not able to respond to the variation of the demand, and then it assumed that the manufacturer can order a minimum fixed quantity. We then derive an optimal production plan taking into account the degradation of the machine and simultaneously minimising: inventory, degradation and production cost. An algorithm based on finite perturbation analysis is proposed to determine the optimal production plan and the sensitivity study of the availability is presented.

Suggested Citation

  • Souheil Ayed & Zied Hajej & Sadok Turki & Nidhal Rezg, 2017. "FPA method for optimal production planning under availability/degradation machine and subcontracting constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2135-2148, April.
  • Handle: RePEc:taf:tprsxx:v:55:y:2017:i:8:p:2135-2148
    DOI: 10.1080/00207543.2016.1165879
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2016.1165879
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2016.1165879?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ioannis Paschalidis & Yong Liu & Christos Cassandras & Christos Panayiotou, 2004. "Inventory Control for Supply Chains with Service Level Constraints: A Synergy between Large Deviations and Perturbation Analysis," Annals of Operations Research, Springer, vol. 126(1), pages 231-258, February.
    2. Chelbi, Anis & Ait-Kadi, Daoud, 2004. "Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance," European Journal of Operational Research, Elsevier, vol. 156(3), pages 712-718, August.
    3. Zied Hajej & Sadok Turki & Nidhal Rezg, 2015. "Modelling and analysis for sequentially optimising production, maintenance and delivery activities taking into account product returns," International Journal of Production Research, Taylor & Francis Journals, vol. 53(15), pages 4694-4719, August.
    4. Gharbi, A. & Kenne, J. P., 2000. "Production and preventive maintenance rates control for a manufacturing system: An experimental design approach," International Journal of Production Economics, Elsevier, vol. 65(3), pages 275-287, May.
    5. Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    6. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    7. Van der Duyn Schouten, F. A. & Vanneste, S. G., 1995. "Maintenance optimization of a production system with buffer capacity," European Journal of Operational Research, Elsevier, vol. 82(2), pages 323-338, April.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zequeira, Romulo I. & Valdes, Jose E. & Berenguer, Christophe, 2008. "Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability," International Journal of Production Economics, Elsevier, vol. 111(2), pages 686-696, February.
    2. Berthaut, F. & Gharbi, A. & Kenné, J.-P. & Boulet, J.-F., 2010. "Improved joint preventive maintenance and hedging point policy," International Journal of Production Economics, Elsevier, vol. 127(1), pages 60-72, September.
    3. Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    4. Borrero, J.S. & Akhavan-Tabatabaei, R., 2013. "Time and inventory dependent optimal maintenance policies for single machine workstations: An MDP approach," European Journal of Operational Research, Elsevier, vol. 228(3), pages 545-555.
    5. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    6. Karamatsoukis, C.C. & Kyriakidis, E.G., 2010. "Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer," European Journal of Operational Research, Elsevier, vol. 207(1), pages 297-308, November.
    7. Berthaut, F. & Gharbi, A. & Dhouib, K., 2011. "Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell," Omega, Elsevier, vol. 39(6), pages 642-654, December.
    8. Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
    9. Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
    10. Thomas Sloan, 2008. "Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(2), pages 116-129, March.
    11. Gharbi, A. & Kenne, J.-P. & Beit, M., 2007. "Optimal safety stocks and preventive maintenance periods in unreliable manufacturing systems," International Journal of Production Economics, Elsevier, vol. 107(2), pages 422-434, June.
    12. Song, Dong-Ping, 2009. "Production and preventive maintenance control in a stochastic manufacturing system," International Journal of Production Economics, Elsevier, vol. 119(1), pages 101-111, May.
    13. Liao, Gwo-Liang & Sheu, Shey-Huei, 2011. "Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 130(1), pages 118-124, March.
    14. Cormier, Gilles & Rezg, Nidhal, 2009. "An integrated production planning model for molds and end items," International Journal of Production Economics, Elsevier, vol. 121(1), pages 68-71, September.
    15. Paulson Gjerde, Kathy A. & Slotnick, Susan A., 2004. "Quality and reputation: The effects of external and internal factors over time," International Journal of Production Economics, Elsevier, vol. 89(1), pages 1-20, May.
    16. Pilar I. Vidal-Carreras & Jose P. Garcia-Sabater & Julio J. Garcia-Sabater, 2017. "A practical model for managing inventories with unknown costs and a budget constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 118-129, January.
    17. Freiesleben, Johannes, 2008. "A proposal for an economic quality loss function," International Journal of Production Economics, Elsevier, vol. 113(2), pages 1012-1024, June.
    18. Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
    19. Leonid Mylnikov & Martin Kuetz, 2017. "Electric Power Supply Subsystem and its Role in Solving Production System Management and Planning Issues," International Journal of Energy Economics and Policy, Econjournals, vol. 7(5), pages 191-200.
    20. Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:8:p:2135-2148. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.