IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v55y2004i6d10.1057_palgrave.jors.2601725.html
   My bibliography  Save this article

A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield

Author

Listed:
  • T W Sloan

    (University of Miami)

Abstract

In many environments, product yield is heavily influenced by equipment condition. Despite this fact, previous research has either focused on the issue of maintenance, ignoring the effect of equipment condition on yield, or has focused on the issue of production, omitting the possibility of actively changing the machine state. We formulate a Markov decision process model of a single-stage production system in which demand is random. The product yield has a binomial distribution that depends on the equipment condition, which deteriorates over time. The objective is to choose simultaneously the equipment maintenance schedule as well as the quantity to produce in a way that minimizes the sum of expected production, backorder, and holding costs. After proving some results about the structural properties of the optimal policy, numerical problems are used to compare this method to the typical approach of solving the maintenance and production problems sequentially. The results show that the simultaneous solution provides substantial gains over the sequential approach. In the cases studied, the proposed method resulted in an average cost savings of approximately 18%.

Suggested Citation

  • T W Sloan, 2004. "A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 647-656, June.
  • Handle: RePEc:pal:jorsoc:v:55:y:2004:i:6:d:10.1057_palgrave.jors.2601725
    DOI: 10.1057/palgrave.jors.2601725
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2601725
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2601725?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Evan L. Porteus, 1990. "Note---The Impact of Inspection Delay on Process and Inspection Lot Sizing," Management Science, INFORMS, vol. 36(8), pages 999-1007, August.
    2. Srinivas Bollapragada & Thomas E. Morton, 1999. "Myopic Heuristics for the Random Yield Problem," Operations Research, INFORMS, vol. 47(5), pages 713-722, October.
    3. Hau L. Lee & Candace Arai Yano, 1988. "Production Control in Multistage Systems with Variable Yield Losses," Operations Research, INFORMS, vol. 36(2), pages 269-278, April.
    4. Yunzeng Wang & Yigal Gerchak, 1996. "Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand," Management Science, INFORMS, vol. 42(1), pages 130-137, January.
    5. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    6. Mordechai Henig & Yigal Gerchak, 1990. "The Structure of Periodic Review Policies in the Presence of Random Yield," Operations Research, INFORMS, vol. 38(4), pages 634-643, August.
    7. Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
    8. Baker, H. & Ehrhardt, R., 1995. "A dynamic inventory model with random replenishment quantities," Omega, Elsevier, vol. 23(1), pages 109-116, February.
    9. Parlar, Mahmut & Perry, David, 1995. "Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain," European Journal of Operational Research, Elsevier, vol. 84(2), pages 431-443, July.
    10. M. Venkatesan, 1984. "Production-Inventory with Equipment Replacement—PIER," Operations Research, INFORMS, vol. 32(6), pages 1286-1295, December.
    11. Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Huidong Zhang & Dragan Djurdjanovic, 2022. "Integrated production and maintenance planning under uncertain demand with concurrent learning of yield rate," Flexible Services and Manufacturing Journal, Springer, vol. 34(2), pages 429-450, June.
    2. Zhang, Nan & Cai, Kaiquan & Deng, Yingjun & Zhang, Jun, 2023. "Determining the optimal production–maintenance policy of a parallel production system with stochastically interacted yield and deterioration," Reliability Engineering and System Safety, Elsevier, vol. 237(C).
    3. Liu, Yu & Chen, Yiming & Jiang, Tao, 2020. "Dynamic selective maintenance optimization for multi-state systems over a finite horizon: A deep reinforcement learning approach," European Journal of Operational Research, Elsevier, vol. 283(1), pages 166-181.
    4. Zequeira, Romulo I. & Valdes, Jose E. & Berenguer, Christophe, 2008. "Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability," International Journal of Production Economics, Elsevier, vol. 111(2), pages 686-696, February.
    5. Thomas Sloan, 2008. "Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(2), pages 116-129, March.
    6. Borrero, J.S. & Akhavan-Tabatabaei, R., 2013. "Time and inventory dependent optimal maintenance policies for single machine workstations: An MDP approach," European Journal of Operational Research, Elsevier, vol. 228(3), pages 545-555.
    7. Uit Het Broek, Michiel A.J. & Teunter, Ruud H. & de Jonge, Bram & Veldman, Jasper, 2021. "Joint condition-based maintenance and load-sharing optimization for two-unit systems with economic dependency," European Journal of Operational Research, Elsevier, vol. 295(3), pages 1119-1131.
    8. Choi, Sungyong & Jeon, Sumin & Kim, Jinmin & Park, Kwangtae, 2019. "A newsvendor analysis of a binomial yield production process," European Journal of Operational Research, Elsevier, vol. 273(3), pages 983-991.
    9. Nabil Nahas, 2017. "Buffer allocation and preventive maintenance optimization in unreliable production lines," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 85-93, January.
    10. Xiaodong Yao & Xiaolan Xie & Michael C. Fu & Steven I. Marcus, 2005. "Optimal joint preventive maintenance and production policies," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(7), pages 668-681, October.
    11. Michiel A. J. uit het Broek & Ruud H. Teunter & Bram de Jonge & Jasper Veldman & Nicky D. Van Foreest, 2020. "Condition-Based Production Planning: Adjusting Production Rates to Balance Output and Failure Risk," Manufacturing & Service Operations Management, INFORMS, vol. 22(4), pages 792-811, July.
    12. Kutzner, Sarah C. & Kiesmüller, Gudrun P., 2013. "Optimal control of an inventory-production system with state-dependent random yield," European Journal of Operational Research, Elsevier, vol. 227(3), pages 444-452.
    13. Zhang, Nan & Cai, Kaiquan & Deng, Yingjun & Zhang, Jun, 2024. "Joint optimization of condition-based maintenance and condition-based production of a single equipment considering random yield and maintenance delay," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    14. Abdelhamid Boudjelida, 2019. "On the robustness of joint production and maintenance scheduling in presence of uncertainties," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1515-1530, April.
    15. David L. Kaufman & Mark E. Lewis, 2007. "Machine maintenance with workload considerations," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(7), pages 750-766, October.
    16. Karamatsoukis, C.C. & Kyriakidis, E.G., 2010. "Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer," European Journal of Operational Research, Elsevier, vol. 207(1), pages 297-308, November.
    17. Ekin, Tahir, 2018. "Integrated maintenance and production planning with endogenous uncertain yield," Reliability Engineering and System Safety, Elsevier, vol. 179(C), pages 52-61.
    18. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kaijie Zhu & Rachel Q. Zhang & Fugee Tsung, 2007. "Pushing Quality Improvement Along Supply Chains," Management Science, INFORMS, vol. 53(3), pages 421-436, March.
    2. Xu, He, 2010. "Managing production and procurement through option contracts in supply chains with random yield," International Journal of Production Economics, Elsevier, vol. 126(2), pages 306-313, August.
    3. Gel, Esma S. & Salman, F. Sibel, 2022. "Dynamic ordering decisions with approximate learning of supply yield uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
    4. Qing Li & Shaohui Zheng, 2006. "Joint Inventory Replenishment and Pricing Control for Systems with Uncertain Yield and Demand," Operations Research, INFORMS, vol. 54(4), pages 696-705, August.
    5. Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
    6. Burak Kazaz, 2004. "Production Planning Under Yield and Demand Uncertainty with Yield-Dependent Cost and Price," Manufacturing & Service Operations Management, INFORMS, vol. 6(3), pages 209-224, October.
    7. Asli Sencer Erdem & Mehmet Murat Fadilog̃lu & Süleyman Özekici, 2006. "An EOQ model with multiple suppliers and random capacity," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(1), pages 101-114, February.
    8. Mart, Turgut & Duran, Serhan & Bakal, İsmail Serdar, 2013. "Tactical inventory and backorder decisions for systems with predictable production yield," International Journal of Production Economics, Elsevier, vol. 143(2), pages 294-303.
    9. Matthew J. Sobel & Volodymyr Babich, 2012. "Optimality of Myopic Policies for Dynamic Lot-Sizing Problems in Serial Production Lines with Random Yields and Autoregressive Demand," Operations Research, INFORMS, vol. 60(6), pages 1520-1536, December.
    10. Erdem, Asli Sencer & Ozekici, Suleyman, 2002. "Inventory models with random yield in a random environment," International Journal of Production Economics, Elsevier, vol. 78(3), pages 239-253, August.
    11. Diwakar Gupta & William L. Cooper, 2005. "Stochastic Comparisons in Production Yield Management," Operations Research, INFORMS, vol. 53(2), pages 377-384, April.
    12. Jim (Junmin) Shi & Xiaohang Yue & Yao Zhao, 2014. "Operations sequencing for a multi‐stage production inventory system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(2), pages 144-154, March.
    13. Peter Berling & Danja R. Sonntag, 2022. "Inventory control in production–inventory systems with random yield and rework: The unit‐tracking approach," Production and Operations Management, Production and Operations Management Society, vol. 31(6), pages 2628-2645, June.
    14. Song, Yuyue & Wang, Yunzeng, 2017. "Periodic review inventory systems with fixed order cost and uniform random yield," European Journal of Operational Research, Elsevier, vol. 257(1), pages 106-117.
    15. S. Andrew Starbird, 1997. "Acceptance sampling, imperfect production, and the optimality of zero defects," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 515-530, September.
    16. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
    17. Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
    18. Wang, Daqin & Tang, Ou & Zhang, Lihua, 2014. "A periodic review lot sizing problem with random yields, disruptions and inventory capacity," International Journal of Production Economics, Elsevier, vol. 155(C), pages 330-339.
    19. Juhwen Hwang & Medini R. Singh, 1998. "Optimal Production Policies for Multi-Stage Systems with Setup Costs and Uncertain Capacities," Management Science, INFORMS, vol. 44(9), pages 1279-1294, September.
    20. Argon, Nilay Tanik & Gullu, Refik & Erkip, Nesim, 2001. "Analysis of an inventory system under backorder correlated deterministic demand and geometric supply process," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 247-254, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:55:y:2004:i:6:d:10.1057_palgrave.jors.2601725. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.