IDEAS home Printed from https://ideas.repec.org/a/pal/jorsoc/v56y2005i3d10.1057_palgrave.jors.2601792.html
   My bibliography  Save this article

Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages

Author

Listed:
  • K-L Hou

    (National Defense University, Chungho)

Abstract

The paper studies optimal production run length for a deteriorating production system in which the shortages are allowed and the deterioration processes are characterized by a two-state continuous-time Markov chain. We show that there exists a unique optimal production run length to minimize the expected total relevant cost. In addition, bounds for the optimal production run length are provided to develop the solution procedure. Finally, a numerical example is given to illustrate the results and sensitivity analysis is also performed

Suggested Citation

  • K-L Hou, 2005. "Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 346-350, March.
  • Handle: RePEc:pal:jorsoc:v:56:y:2005:i:3:d:10.1057_palgrave.jors.2601792
    DOI: 10.1057/palgrave.jors.2601792
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1057/palgrave.jors.2601792
    File Function: Abstract
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1057/palgrave.jors.2601792?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wang, Chih-Hsiung & Sheu, Shey-Heui, 2003. "Optimal lot sizing for products sold under free-repair warranty," European Journal of Operational Research, Elsevier, vol. 149(1), pages 131-141, August.
    2. Yeh, Ruey Huei & Ho, Wen-Tsung & Tseng, Sheng-Tsaing, 2000. "Optimal production run length for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 120(3), pages 575-582, February.
    3. Djamaludin, I. & Murthy, D. N. P. & Wilson, R. J., 1994. "Quality control through lot sizing for items sold with warranty," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 97-107, January.
    4. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    5. Ben-Daya, Mohamed, 2002. "The economic production lot-sizing problem with imperfect production processes and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 76(3), pages 257-264, April.
    6. Hau L. Lee, 1992. "Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework," Management Science, INFORMS, vol. 38(9), pages 1314-1328, September.
    7. Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nita Shah & Monika Naik, 2019. "Coordinated production, ordering, shipment and pricing model for supplier-retailer inventory system under trade credit," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 29(2), pages 55-76.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Yeh, Ruey Huei & Ho, Wen-Tsung & Tseng, Sheng-Tsaing, 2000. "Optimal production run length for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 120(3), pages 575-582, February.
    2. Wang, Chih-Hsiung, 2009. "Determining the optimal probing lot size for the wafer probe operation in semiconductor manufacturing," European Journal of Operational Research, Elsevier, vol. 197(1), pages 126-133, August.
    3. Giri, B.C. & Dohi, T., 2007. "Inspection scheduling for imperfect production processes under free repair warranty contract," European Journal of Operational Research, Elsevier, vol. 183(1), pages 238-252, November.
    4. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    5. Da Wen & Pan Ershun & Wang Ying & Liao Wenzhu, 2016. "An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy," Journal of Intelligent Manufacturing, Springer, vol. 27(6), pages 1323-1333, December.
    6. Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
    7. B. C. Giri & T Chakraborty, 2007. "Optimal production, maintenance, and warranty strategies for item sold with rebate combination warranty," Journal of Risk and Reliability, , vol. 221(4), pages 257-264, December.
    8. Hu, Fei & Zong, Qun, 2009. "Optimal production run time for a deteriorating production system under an extended inspection policy," European Journal of Operational Research, Elsevier, vol. 196(3), pages 979-986, August.
    9. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    10. Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
    11. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    12. Wei Huang & Vidyadhar Kulkarni & Jayashankar M. Swaminathan, 2008. "Managing the Inventory of an Item with a Replacement Warranty," Management Science, INFORMS, vol. 54(8), pages 1441-1452, August.
    13. Hsieh, Chung-Chi & Lee, Zong-Zhe, 2005. "Joint determination of production run length and number of standbys in a deteriorating production process," European Journal of Operational Research, Elsevier, vol. 162(2), pages 359-371, April.
    14. Liao, Gwo-Liang & Chen, Yen Hung & Sheu, Shey-Huei, 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance," European Journal of Operational Research, Elsevier, vol. 195(2), pages 348-357, June.
    15. Wang, Chih-Hsiung & Sheu, Shey-Heui, 2003. "Optimal lot sizing for products sold under free-repair warranty," European Journal of Operational Research, Elsevier, vol. 149(1), pages 131-141, August.
    16. Oner, Selma & Bilgic, Taner, 2008. "Economic lot scheduling with uncontrolled co-production," European Journal of Operational Research, Elsevier, vol. 188(3), pages 793-810, August.
    17. Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
    18. K.Y. Kung & Y.D. Huang & H.M. Wee & Y. Daryanto, 2019. "Production-Inventory System for Deteriorating Items with Machine Breakdown, Inspection, and Partial Backordering," Mathematics, MDPI, vol. 7(7), pages 1-26, July.
    19. Yeh, Ruey Huei & Chen, Tzu-Hui, 2006. "Optimal lot size and inspection policy for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 174(2), pages 766-776, October.
    20. Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:56:y:2005:i:3:d:10.1057_palgrave.jors.2601792. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.