IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v92y1996i1p1-27.html
   My bibliography  Save this item

Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2007. "A classification of assembly line balancing problems," European Journal of Operational Research, Elsevier, vol. 183(2), pages 674-693, December.
  2. Jean-Sébastien Tancrez & Philippe Chevalier & Pierre Semal, 2011. "Probability masses fitting in the analysis of manufacturing flow lines," Annals of Operations Research, Springer, vol. 182(1), pages 163-191, January.
  3. He, Xin-Feng & Wu, Su & Li, Quan-Lin, 2007. "Production variability of production lines," International Journal of Production Economics, Elsevier, vol. 107(1), pages 78-87, May.
  4. Nan Chen & Yuan Yuan & Shiyu Zhou, 2011. "Performance analysis of queue length monitoring of M/G/1 systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(8), pages 782-794, December.
  5. Jeffrey M. Alden & Lawrence D. Burns & Theodore Costy & Richard D. Hutton & Craig A. Jackson & David S. Kim & Kevin A. Kohls & Jonathan H. Owen & Mark A. Turnquist & David J. Vander Veen, 2006. "General Motors Increases Its Production Throughput," Interfaces, INFORMS, vol. 36(1), pages 6-25, February.
  6. George Liberopoulos & George Kozanidis & Panagiotis Tsarouhas, 2007. "Performance Evaluation of an Automatic Transfer Line with WIP Scrapping During Long Failures," Manufacturing & Service Operations Management, INFORMS, vol. 9(1), pages 62-83, December.
  7. Macchi, Marco & Kristjanpoller, Fredy & Garetti, Marco & Arata, Adolfo & Fumagalli, Luca, 2012. "Introducing buffer inventories in the RBD analysis of process production systems," Reliability Engineering and System Safety, Elsevier, vol. 104(C), pages 84-95.
  8. Perkgoz, Cahit & Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2007. "A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms," European Journal of Operational Research, Elsevier, vol. 180(1), pages 292-308, July.
  9. Jean-Sébastien Tancrez, 2020. "A decomposition method for assembly/disassembly systems with blocking and general distributions," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 272-296, June.
  10. Farhood Rismanchian & Young Hoon Lee, 2018. "Moment-based approximations for first- and second-order transient performance measures of an unreliable workstation," Operational Research, Springer, vol. 18(1), pages 75-95, April.
  11. Carlos Chaves & Abhijit Gosavi, 2022. "On general multi-server queues with non-poisson arrivals and medium traffic: a new approximation and a COVID-19 ventilator case study," Operational Research, Springer, vol. 22(5), pages 5205-5229, November.
  12. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
  13. Osorio, Carolina & Bierlaire, Michel, 2009. "An analytic finite capacity queueing network model capturing the propagation of congestion and blocking," European Journal of Operational Research, Elsevier, vol. 196(3), pages 996-1007, August.
  14. Tan, Bar[iota]s, 1999. "Variance of the output as a function of time: Production line dynamics," European Journal of Operational Research, Elsevier, vol. 117(3), pages 470-484, September.
  15. Belmansour, Ahmed-Tidjani & Nourelfath, Mustapha, 2010. "An aggregation method for performance evaluation of a tandem homogenous production line with machines having multiple failure modes," Reliability Engineering and System Safety, Elsevier, vol. 95(11), pages 1193-1201.
  16. Tancrez, Jean-Sbastien & Semal, Pierre & Chevalier, Philippe, 2009. "Histogram based bounds and approximations for production lines," European Journal of Operational Research, Elsevier, vol. 197(3), pages 1133-1141, September.
  17. Laurentiu Rece & Sorin Vlase & Daniel Ciuiu & Giorgian Neculoiu & Stefan Mocanu & Arina Modrea, 2022. "Queueing Theory-Based Mathematical Models Applied to Enterprise Organization and Industrial Production Optimization," Mathematics, MDPI, vol. 10(14), pages 1-32, July.
  18. Chen, Shih-Pin, 2016. "Time value of delays in unreliable production systems with mixed uncertainties of fuzziness and randomness," European Journal of Operational Research, Elsevier, vol. 255(3), pages 834-844.
  19. Sumi Kim & Seongmoon Kim, 2015. "Differentiated waiting time management according to patient class in an emergency care center using an open Jackson network integrated with pooling and prioritizing," Annals of Operations Research, Springer, vol. 230(1), pages 35-55, July.
  20. Maria Chiara Magnanini & Tullio Tolio, 2020. "Switching- and hedging- point policy for preventive maintenance with degrading machines: application to a two-machine line," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 241-271, June.
  21. Konstantinos S. Boulas & Georgios D. Dounias & Chrissoleon T. Papadopoulos, 2023. "A hybrid evolutionary algorithm approach for estimating the throughput of short reliable approximately balanced production lines," Journal of Intelligent Manufacturing, Springer, vol. 34(2), pages 823-852, February.
  22. Li, Na & Zhang, Mike Tao & Deng, Shiming & Lee, Zu-Hsu & Zhang, Lawrence & Zheng, Li, 2007. "Single-station performance evaluation and improvement in semiconductor manufacturing: A graphical approach," International Journal of Production Economics, Elsevier, vol. 107(2), pages 397-403, June.
  23. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
  24. Korporaal, R. & Ridder, A.A.N. & Kloprogge, P. & Dekker, R., 1999. "Capacity planning of prisons in the Netherlands," Econometric Institute Research Papers EI 9909-/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  25. Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Modelling complex assemblies as a queueing network for lead time control," European Journal of Operational Research, Elsevier, vol. 174(1), pages 150-168, October.
  26. Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
  27. Simge Yelkenci Kose & Ozcan Kilincci, 2020. "A multi-objective hybrid evolutionary approach for buffer allocation in open serial production lines," Journal of Intelligent Manufacturing, Springer, vol. 31(1), pages 33-51, January.
  28. Tan, Baris, 1998. "Effects of variability on the due-time performance of a continuous materials flow production system in series," International Journal of Production Economics, Elsevier, vol. 54(1), pages 87-100, January.
  29. Beixin Xia & Binghai Zhou & Ci Chen & Lifeng Xi, 2016. "A generalized-exponential decomposition method for the analysis of inhomogeneous assembly/disassembly systems with unreliable machines and finite buffers," Journal of Intelligent Manufacturing, Springer, vol. 27(4), pages 765-779, August.
  30. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Tavakkoli-Moghaddam, Reza, 2011. "Resource allocation in dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 215(3), pages 670-678, December.
  31. Saeed Yaghoubi, 2015. "Due-date assignment for multi-server multi-stage assembly systems," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(7), pages 1246-1256, May.
  32. Elisa Gebennini & Andrea Grassi & Cesare Fantuzzi & Stanley Gershwin & Irvin Schick, 2013. "Discrete time model for two-machine one-buffer transfer lines with restart policy," Annals of Operations Research, Springer, vol. 209(1), pages 41-65, October.
  33. Kiesmüller, G.P. & Sachs, F.E., 2020. "Spare parts or buffer? How to design a transfer line with unreliable machines," European Journal of Operational Research, Elsevier, vol. 284(1), pages 121-134.
  34. Dhouib, K. & Gharbi, A. & Landolsi, N., 2009. "Throughput assessment of mixed-model flexible transfer lines with unreliable machines," International Journal of Production Economics, Elsevier, vol. 122(2), pages 619-627, December.
  35. Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
  36. Osorio, Carolina & Bierlaire, Michel, 2012. "A tractable analytical model for large-scale congested protein synthesis networks," European Journal of Operational Research, Elsevier, vol. 219(3), pages 588-597.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.