IDEAS home Printed from https://ideas.repec.org/a/spr/cejnor/v32y2024i3d10.1007_s10100-023-00871-3.html
   My bibliography  Save this article

Performance analysis of a production system with two deteriorating machines and a finite buffer

Author

Listed:
  • Hatice Ucar Guner

    (Istanbul Rumeli University)

  • Alper Murat

    (Wayne State University)

  • Ratna Babu Chinnam

    (Wayne State University)

Abstract

Manufacturing systems commonly face machine degradation over time due to usage, with deteriorated machines being more likely to fail and reduce production throughput. However, accurately quantifying the impact of machine health degradation on system performance remains a challenge, which can impede effective decision-making on the factory floor. There is a lack of analytical methods to accurately quantify the impact of machine health degradation on overall system performance, which can impede effective decision-making on the factory floor. To address this challenge, we propose an exact model for evaluating the production performance of a discrete material flow line consisting of two deteriorating machines and a finite buffer. Our model considers cases where failed machines can be perfectly or imperfectly repaired or maintained and uses Markov chains to model the state transitions of the system and estimate the throughput, which can assist in making better production and maintenance decisions. We investigate the influence of system parameters on performance, including the interactions between machine condition, system throughput, and buffer levels, and compare the performance of our method with existing approaches that consider only one operational state or use equivalent reliability parameters for all states. Our approach provides a more accurate and comprehensive analysis of the impact of machine degradation on system performance, with significant implications for improving manufacturing process efficiency and effectiveness.

Suggested Citation

  • Hatice Ucar Guner & Alper Murat & Ratna Babu Chinnam, 2024. "Performance analysis of a production system with two deteriorating machines and a finite buffer," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 32(3), pages 621-651, September.
  • Handle: RePEc:spr:cejnor:v:32:y:2024:i:3:d:10.1007_s10100-023-00871-3
    DOI: 10.1007/s10100-023-00871-3
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10100-023-00871-3
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10100-023-00871-3?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to

    for a different version of it.

    References listed on IDEAS

    as
    1. Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
    2. Tan, BarIs & Gershwin, Stanley B., 2009. "Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer," International Journal of Production Economics, Elsevier, vol. 120(2), pages 327-339, August.
    3. Stanley B. Gershwin & Irvin C. Schick, 1983. "Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers," Operations Research, INFORMS, vol. 31(2), pages 354-380, April.
    4. Daniel Bergeron & M. Anouar Jamali & Hidehiko Yamamoto, 2010. "Modelling and analysis of manufacturing systems: a review of existing models," International Journal of Product Development, Inderscience Enterprises Ltd, vol. 10(1/2/3), pages 46-61.
    5. Jingchuan Chen & Zhiyang Jia & Xiaohan Wang, 2022. "Dynamic performance prediction in flexible production lines with two geometric machines," International Journal of Production Research, Taylor & Francis Journals, vol. 60(13), pages 4006-4024, July.
    6. Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha & Gershwin, Stanley B., 2017. "Performance evaluation of a two-machine line with a finite buffer and condition-based maintenance," Reliability Engineering and System Safety, Elsevier, vol. 166(C), pages 61-72.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
    2. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
    3. Wei, Shuaichong & Nourelfath, Mustapha & Nahas, Nabil, 2023. "Analysis of a production line subject to degradation and preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
    4. Elisa Gebennini & Andrea Grassi & Cesare Fantuzzi & Stanley Gershwin & Irvin Schick, 2013. "Discrete time model for two-machine one-buffer transfer lines with restart policy," Annals of Operations Research, Springer, vol. 209(1), pages 41-65, October.
    5. Zhang, Yongjin & Zhao, Ming & Zhang, Yanjun & Pan, Ruilin & Cai, Jing, 2020. "Dynamic and steady-state performance analysis for multi-state repairable reconfigurable manufacturing systems with buffers," European Journal of Operational Research, Elsevier, vol. 283(2), pages 491-510.
    6. Zhang, Ning & Qi, Faqun & Zhang, Chengjie & Zhou, Hongming, 2022. "Joint optimization of condition-based maintenance policy and buffer capacity for a two-unit series system," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
    7. Maria Chiara Magnanini & Tullio Tolio, 2020. "Switching- and hedging- point policy for preventive maintenance with degrading machines: application to a two-machine line," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 241-271, June.
    8. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Tavakkoli-Moghaddam, Reza, 2011. "Resource allocation in dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 215(3), pages 670-678, December.
    9. Jean-Sébastien Tancrez, 2020. "A decomposition method for assembly/disassembly systems with blocking and general distributions," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 272-296, June.
    10. Stefan Helber & Katja Schimmelpfeng & Raik Stolletz & Svenja Lagershausen, 2011. "Using linear programming to analyze and optimize stochastic flow lines," Annals of Operations Research, Springer, vol. 182(1), pages 193-211, January.
    11. Chame, Anna & Tsallis, Constantino, 1990. "Criticality of the discrete N-vector ferromagnet in a cubic lattice with a free surface," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 165(1), pages 41-63.
    12. Barış Tan, 2019. "Production Control with Price, Cost, and Demand Uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1057-1085, December.
    13. S. Göttlich & S. Kühn & J. A. Schwarz & R. Stolletz, 2016. "Approximations of time-dependent unreliable flow lines with finite buffers," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 83(3), pages 295-323, June.
    14. Konstantinos S. Boulas & Georgios D. Dounias & Chrissoleon T. Papadopoulos, 2023. "A hybrid evolutionary algorithm approach for estimating the throughput of short reliable approximately balanced production lines," Journal of Intelligent Manufacturing, Springer, vol. 34(2), pages 823-852, February.
    15. Korporaal, R. & Ridder, A.A.N. & Kloprogge, P. & Dekker, R., 1999. "Capacity planning of prisons in the Netherlands," Econometric Institute Research Papers EI 9909-/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    16. Ünsal Özdoğru & Tayfur Altiok, 2015. "Continuous material flow systems: analysis of marine ports handling bulk materials," Annals of Operations Research, Springer, vol. 231(1), pages 79-104, August.
    17. Dhouib, K. & Gharbi, A. & Landolsi, N., 2009. "Throughput assessment of mixed-model flexible transfer lines with unreliable machines," International Journal of Production Economics, Elsevier, vol. 122(2), pages 619-627, December.
    18. George Liberopoulos & George Kozanidis & Panagiotis Tsarouhas, 2007. "Performance Evaluation of an Automatic Transfer Line with WIP Scrapping During Long Failures," Manufacturing & Service Operations Management, INFORMS, vol. 9(1), pages 62-83, December.
    19. Yang, Hongbing & Li, Wenchao & Wang, Bin, 2021. "Joint optimization of preventive maintenance and production scheduling for multi-state production systems based on reinforcement learning," Reliability Engineering and System Safety, Elsevier, vol. 214(C).
    20. Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:cejnor:v:32:y:2024:i:3:d:10.1007_s10100-023-00871-3. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.