IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v209y2019icp334-345.html
   My bibliography  Save this article

Cross-training policies for repair shops with spare part inventories

Author

Listed:
  • Sleptchenko, Andrei
  • Turan, Hasan Hüseyin
  • Pokharel, Shaligram
  • ElMekkawy, Tarek Y.

Abstract

We study a spare part supply system for repairable spare parts where parallel repair servers may have multiple skills (can repair different failed parts). Demands for the spares occur according to Poisson processes with different rates. The failed spare parts are immediately replaced from the inventory. Otherwise, failed parts are backordered and fulfilled when a spare of the same type becomes available (repaired). The repair servers are heterogeneous and can process certain types of repairables only if they have the necessary skill. In this system, in contrast with the other skill-optimization models, there is a trade-off between adding extra skills to servers (training) or adding extra inventory. In this paper, we formulate a mathematical model to optimize the assignment of skills to servers taking into account inventories for the ready-to-use spares and backorder costs (penalties). To optimize the skill assignments and inventories, we use a hybrid approach combining a Genetic Algorithm (GA) with simulation modeling. The proposed simulation-based optimization heuristic is used for extensive analysis of optimal skill assignments where we show that partial flexibility for repair servers with limited cross-training will lead to lower total system cost.

Suggested Citation

  • Sleptchenko, Andrei & Turan, Hasan Hüseyin & Pokharel, Shaligram & ElMekkawy, Tarek Y., 2019. "Cross-training policies for repair shops with spare part inventories," International Journal of Production Economics, Elsevier, vol. 209(C), pages 334-345.
  • Handle: RePEc:eee:proeco:v:209:y:2019:i:c:p:334-345
    DOI: 10.1016/j.ijpe.2017.12.018
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527317304243
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2017.12.018?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Geert-Jan van Houtum & Bram Kranenburg, 2015. "Spare Parts Inventory Control under System Availability Constraints," International Series in Operations Research and Management Science, Springer, edition 127, number 978-1-4899-7609-3, December.
    2. I. J. B. F. Adan & A. Sleptchenko & G. J. Van Houtum, 2009. "Reducing Costs Of Spare Parts Supply Systems Via Static Priorities," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 26(04), pages 559-585.
    3. S R Agnihothri & A K Mishra & D E Simmons, 2003. "Workforce cross-training decisions in field service systems with two job types," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(4), pages 410-418, April.
    4. William C. Jordan & Stephen C. Graves, 1995. "Principles on the Benefits of Manufacturing Process Flexibility," Management Science, INFORMS, vol. 41(4), pages 577-594, April.
    5. Legros, Benjamin & Jouini, Oualid & Dallery, Yves, 2015. "A flexible architecture for call centers with skill-based routing," International Journal of Production Economics, Elsevier, vol. 159(C), pages 192-207.
    6. Ghaddar, Bissan & Sakr, Nizar & Asiedu, Yaw, 2016. "Spare parts stocking analysis using genetic programming," European Journal of Operational Research, Elsevier, vol. 252(1), pages 136-144.
    7. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2002. "Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems," International Journal of Production Economics, Elsevier, vol. 79(3), pages 209-230, October.
    8. van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
    9. Briš, Radim, 2008. "Parallel simulation algorithm for maintenance optimization based on directed Acyclic Graph," Reliability Engineering and System Safety, Elsevier, vol. 93(6), pages 874-884.
    10. A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
    11. Achal Bassamboo & Ramandeep S. Randhawa & Jan A. Van Mieghem, 2012. "A Little Flexibility Is All You Need: On the Asymptotic Value of Flexible Capacity in Parallel Queuing Systems," Operations Research, INFORMS, vol. 60(6), pages 1423-1435, December.
    12. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    13. Schneider, M. & Grahl, J. & Francas, D. & Vigo, D., 2013. "A Problem-Adjusted Genetic Algorithm for Flexibility Design," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 62381, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    14. Van Horenbeek, Adriaan & Buré, Jasmine & Cattrysse, Dirk & Pintelon, Liliane & Vansteenwegen, Pieter, 2013. "Joint maintenance and inventory optimization systems: A review," International Journal of Production Economics, Elsevier, vol. 143(2), pages 499-508.
    15. Schneider, Michael & Grahl, Jörn & Francas, David & Vigo, Daniele, 2013. "A problem-adjusted genetic algorithm for flexibility design," International Journal of Production Economics, Elsevier, vol. 141(1), pages 56-65.
    16. Suri Gurumurthi & Saif Benjaafar, 2004. "Modeling and analysis of flexible queueing systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(5), pages 755-782, August.
    17. Lee, Loo Hay & Chew, Ek Peng & Teng, Suyan & Chen, Yankai, 2008. "Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem," European Journal of Operational Research, Elsevier, vol. 189(2), pages 476-491, September.
    18. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2005. "Using repair priorities to reduce stock investment in spare part networks," European Journal of Operational Research, Elsevier, vol. 163(3), pages 733-750, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Turan, Hasan Hüseyin & Atmis, Mahir & Kosanoglu, Fuat & Elsawah, Sondoss & Ryan, Michael J., 2020. "A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    2. Yazdekhasti, Amin & sharifzadeh, Shila & Ma, Junfeng, 2022. "A two-echelon two-indenture warranty distribution network development and optimization under batch-ordering inventory policy," International Journal of Production Economics, Elsevier, vol. 249(C).
    3. Moallemi, Enayat A. & Elsawah, Sondoss & Ryan, Michael J., 2020. "Strengthening ‘good’ modelling practices in robust decision support: A reporting guideline for combining multiple model-based methods," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 175(C), pages 3-24.
    4. Voorberg, S. & van Jaarsveld, W. & Eshuis, R. & van Houtum, G.J., 2023. "Information acquisition for service contract quotations made by repair shops," European Journal of Operational Research, Elsevier, vol. 305(3), pages 1166-1177.
    5. Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
    6. Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
    2. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    3. Turan, Hasan Hüseyin & Atmis, Mahir & Kosanoglu, Fuat & Elsawah, Sondoss & Ryan, Michael J., 2020. "A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    4. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    5. Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
    6. van der Heijden, M.C. & Alvarez, E.M. & Schutten, J.M.J., 2013. "Inventory reduction in spare part networks by selective throughput time reduction," International Journal of Production Economics, Elsevier, vol. 143(2), pages 509-517.
    7. Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
    8. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    9. Mabel C. Chou & Geoffrey A. Chua & Huan Zheng, 2014. "On the Performance of Sparse Process Structures in Partial Postponement Production Systems," Operations Research, INFORMS, vol. 62(2), pages 348-365, April.
    10. Timothy C. Y. Chan & Daniel Letourneau & Benjamin G. Potter, 2022. "Sparse flexible design: a machine learning approach," Flexible Services and Manufacturing Journal, Springer, vol. 34(4), pages 1066-1116, December.
    11. Levner, Eugene & Perlman, Yael & Cheng, T.C.E. & Levner, Ilya, 2011. "A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand," International Journal of Production Economics, Elsevier, vol. 132(1), pages 43-51, July.
    12. Knofius, N. & van der Heijden, M.C. & Zijm, W.H.M., 2019. "Consolidating spare parts for asset maintenance with additive manufacturing," International Journal of Production Economics, Elsevier, vol. 208(C), pages 269-280.
    13. Arts, Joachim, 2017. "A multi-item approach to repairable stocking and expediting in a fluctuating demand environment," European Journal of Operational Research, Elsevier, vol. 256(1), pages 102-115.
    14. Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2013. "Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 95-101.
    15. Tiemessen, H.G.H. & van Houtum, G.J., 2013. "Reducing costs of repairable inventory supply systems via dynamic scheduling," International Journal of Production Economics, Elsevier, vol. 143(2), pages 478-488.
    16. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2009. "Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems," International Journal of Production Economics, Elsevier, vol. 118(1), pages 260-268, March.
    17. Sheikh-Zadeh, Alireza & Rossetti, Manuel D., 2020. "Classification methods for problem size reduction in spare part provisioning," International Journal of Production Economics, Elsevier, vol. 219(C), pages 99-114.
    18. S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
    19. Kim, Nayeon & Montreuil, Benoit & Klibi, Walid & Zied Babai, M., 2023. "Network inventory deployment for responsive fulfillment," International Journal of Production Economics, Elsevier, vol. 255(C).
    20. N. Knofius & M. C. Heijden & A. Sleptchenko & W. H. M. Zijm, 2021. "Improving effectiveness of spare parts supply by additive manufacturing as dual sourcing option," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(1), pages 189-221, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:209:y:2019:i:c:p:334-345. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.