IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v143y2013i2p304-315.html
   My bibliography  Save this article

An adaptive base stock policy for repairable item inventory control

Author

Listed:
  • Selçuk, B.

Abstract

This paper presents an adaptive base stock policy for a repairable item inventory control problem. Base stock level of a repairable item is updated based on the work-in-process (WIP) inventory level in repair facility with update frequency modeled as a separate tactical control parameter together with a standard base stock level. Stock-out situations are handled by emergency shipments, and priority shipments are used when updating the base stock level. A single-item single-location problem is considered, with repair facility having a limited capacity, and the problem is modeled by a two-dimensional continuous-time Markov chain, which is then solved explicitly by using matrix geometric methods. Numerical results are provided that show, for a given downtime target, the new policy achieves substantial reduction in inventory on-hand and significant saving in total cost.

Suggested Citation

  • Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
  • Handle: RePEc:eee:proeco:v:143:y:2013:i:2:p:304-315
    DOI: 10.1016/j.ijpe.2012.01.011
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527312000138
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2012.01.011?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. T. W. Archibald & S. A. E. Sassen & L. C. Thomas, 1997. "An Optimal Policy for a Two Depot Inventory Problem with Stock Transfer," Management Science, INFORMS, vol. 43(2), pages 173-183, February.
    2. Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
    3. Aronis, Kostas-Platon & Magou, Ioulia & Dekker, Rommert & Tagaras, George, 2004. "Inventory control of spare parts using a Bayesian approach: A case study," European Journal of Operational Research, Elsevier, vol. 154(3), pages 730-739, May.
    4. Donald Gross, 1982. "On the Ample Service Assumption of Palm's Theorem in Inventory Modeling," Management Science, INFORMS, vol. 28(9), pages 1065-1079, September.
    5. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2002. "Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems," International Journal of Production Economics, Elsevier, vol. 79(3), pages 209-230, October.
    6. Patrik Alfredsson & Jos Verrijdt, 1999. "Modeling Emergency Supply Flexibility in a Two-Echelon Inventory System," Management Science, INFORMS, vol. 45(10), pages 1416-1431, October.
    7. Anil Kukreja & Charles P. Schmidt & David M. Miller, 2001. "Stocking Decisions for Low-Usage Items in a Multilocation Inventory System," Management Science, INFORMS, vol. 47(10), pages 1371-1383, October.
    8. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    9. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    10. Kranenburg, A.A. & van Houtum, G.J., 2009. "A new partial pooling structure for spare parts networks," European Journal of Operational Research, Elsevier, vol. 199(3), pages 908-921, December.
    11. Caggiano, Kathryn E. & Jackson, Peter L. & Muckstadt, John A. & Rappold, James A., 2009. "Efficient computation of time-based customer service levels in a multi-item, multi-echelon supply chain: A practical approach for inventory optimization," European Journal of Operational Research, Elsevier, vol. 199(3), pages 744-749, December.
    12. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2005. "Using repair priorities to reduce stock investment in spare part networks," European Journal of Operational Research, Elsevier, vol. 163(3), pages 733-750, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2012. "Approximate evaluation of multi-location inventory models with lateral transshipments and hold back levels," European Journal of Operational Research, Elsevier, vol. 218(3), pages 624-635.
    2. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
    3. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    4. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    5. Olsson, Fredrik, 2010. "An inventory model with unidirectional lateral transshipments," European Journal of Operational Research, Elsevier, vol. 200(3), pages 725-732, February.
    6. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    7. van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2019. "Optimal lateral transshipment policies for a two location inventory problem with multiple demand classes," European Journal of Operational Research, Elsevier, vol. 272(2), pages 481-495.
    8. van Wingerden, E. & Tan, T. & Van Houtum, G.J., 2019. "The impact of an emergency warehouse in a two-echelon spare parts network," European Journal of Operational Research, Elsevier, vol. 276(3), pages 983-997.
    9. Somarin, Aghil Rezaei & Sharma, Pankaj & Tiwari, Sunil & Chen, Songlin, 2023. "Stock reallocation policy for repairable service parts in case of supply disruptions due to extreme weather events," International Journal of Production Economics, Elsevier, vol. 256(C).
    10. Patriarca, Riccardo & Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2016. "Inventory optimization for a customer airline in a Performance Based Contract," Journal of Air Transport Management, Elsevier, vol. 57(C), pages 206-216.
    11. Erhun Özkan & Geert-Jan Houtum & Yasemin Serin, 2015. "A new approximate evaluation method for two-echelon inventory systems with emergency shipments," Annals of Operations Research, Springer, vol. 224(1), pages 147-169, January.
    12. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    13. Johansson, Lina & Olsson, Fredrik, 2018. "Age-based inventory control in a multi-echelon system with emergency replenishments," European Journal of Operational Research, Elsevier, vol. 265(3), pages 951-961.
    14. Satır, Benhür & Savasaneril, Secil & Serin, Yasemin, 2012. "Pooling through lateral transshipments in service parts systems," European Journal of Operational Research, Elsevier, vol. 220(2), pages 370-377.
    15. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    16. S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
    17. Van der Heide, G. & Van Foreest, N.D. & Roodbergen, K.J., 2018. "Optimizing stock levels for rental systems with a support warehouse and partial backordering," European Journal of Operational Research, Elsevier, vol. 265(1), pages 107-118.
    18. Al Hanbali, Ahmad & van der Heijden, Matthieu, 2013. "Interval availability analysis of a two-echelon, multi-item system," European Journal of Operational Research, Elsevier, vol. 228(3), pages 494-503.
    19. Frank Schneider & Ulrich W. Thonemann & Diego Klabjan, 2018. "Optimization of Battery Charging and Purchasing at Electric Vehicle Battery Swap Stations," Transportation Science, INFORMS, vol. 52(5), pages 1211-1234, October.
    20. Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:143:y:2013:i:2:p:304-315. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.