Spare parts inventory control under a fixed-term contract with a long-down constraint

Author

Listed:
  • Lamghari-Idrissi, Douniel
  • Basten, Rob
  • van Houtum, Geert-Jan

Abstract

We are interested in service contracts for spare parts. We introduce a new performance measure, XLD (extreme long down), that limits the number of deliveries that are later than an agreed threshold during the contract period. We consider a single item, single location stockpoint serving multiple systems where demand is satisfied in an alternative way if the stockpoint is out of stock. Using a finite horizon Markov decision process, we derive the optimal spare parts inventory policy for meeting the contract at minimum costs. We prove that a state-dependent and time-dependent base stock policy is optimal. We also prove that the optimal base stock level is non-increasing in the number of allowed extreme long downs in the remaining contract period and that the optimal base stock level decreases at most by one unit per step. We formulate three heuristics for our finite horizon problem. These heuristics are a translation of heuristics commonly used for other service measures than the XLD measure. We assess their performance in comparison to the optimal policy. The results of our numerical study show that Heuristic 3, a myopic heuristic, is the best performing with an average optimality gap of 4.5% and an optimality gap lower than 5% in 81% of the instances. The maximum optimality gap is very high for all three heuristics, showing that important savings can be made by taking into account the actual contract performance and the remaining contract duration in stocking decisions.

Suggested Citation

  • Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.
  • Handle: RePEc:eee:proeco:v:219:y:2020:i:c:p:123-137
    DOI: 10.1016/j.ijpe.2019.05.023
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552731930204X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2019.05.023?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine & Senthil Veeraraghavan, 2010. "Contracting for Infrequent Restoration and Recovery of Mission-Critical Systems," Management Science, INFORMS, vol. 56(9), pages 1551-1567, September.
    2. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    3. Huiskonen, Janne, 2001. "Maintenance spare parts logistics: Special characteristics and strategic choices," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 125-133, May.
    4. Jing-Sheng Song & Li Xiao & Hanqin Zhang & Paul Zipkin, 2017. "Optimal Policies for a Dual-Sourcing Inventory Problem with Endogenous Stochastic Lead Times," Operations Research, INFORMS, vol. 65(2), pages 379-395, April.
    5. Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
    6. M. Berg & M. J. M. Posner, 1985. "Customer delays in M/M/c repair systems with spares," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 32(2), pages 287-299, May.
    7. Al Hanbali, Ahmad & van der Heijden, Matthieu, 2013. "Interval availability analysis of a two-echelon, multi-item system," European Journal of Operational Research, Elsevier, vol. 228(3), pages 494-503.
    8. Sleptchenko, Andrei & Turan, Hasan Hüseyin & Pokharel, Shaligram & ElMekkawy, Tarek Y., 2019. "Cross-training policies for repair shops with spare part inventories," International Journal of Production Economics, Elsevier, vol. 209(C), pages 334-345.
    9. van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2019. "Optimal lateral transshipment policies for a two location inventory problem with multiple demand classes," European Journal of Operational Research, Elsevier, vol. 272(2), pages 481-495.
    10. Jing-Sheng Song, 1998. "On the Order Fill Rate in a Multi-Item, Base-Stock Inventory System," Operations Research, INFORMS, vol. 46(6), pages 831-845, December.
    11. Knofius, N. & van der Heijden, M.C. & Zijm, W.H.M., 2019. "Consolidating spare parts for asset maintenance with additive manufacturing," International Journal of Production Economics, Elsevier, vol. 208(C), pages 269-280.
    12. Kazuo Murota, 2005. "Note on Multimodularity and L-Convexity," Mathematics of Operations Research, INFORMS, vol. 30(3), pages 658-661, August.
    13. Bruce Hajek, 1985. "Extremal Splittings of Point Processes," Mathematics of Operations Research, INFORMS, vol. 10(4), pages 543-556, November.
    14. Kathryn E. Caggiano & Peter L. Jackson & John A. Muckstadt & James A. Rappold, 2007. "Optimizing Service Parts Inventory in a Multiechelon, Multi-Item Supply Chain with Time-Based Customer Service-Level Agreements," Operations Research, INFORMS, vol. 55(2), pages 303-318, April.
    15. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    16. Dreyfuss, Michael & Giat, Yahel, 2017. "Optimal spares allocation to an exchangeable-item repair system with tolerable wait," European Journal of Operational Research, Elsevier, vol. 261(2), pages 584-594.
    17. Douglas J. Thomas, 2005. "Measuring Item Fill-Rate Performance in a Finite Horizon," Manufacturing & Service Operations Management, INFORMS, vol. 7(1), pages 74-80, September.
    18. Luo, Ming & Wu, Shaomin, 2018. "A mean-variance optimisation approach to collectively pricing warranty policies," International Journal of Production Economics, Elsevier, vol. 196(C), pages 101-112.
    19. Paul Zipkin, 2008. "On the Structure of Lost-Sales Inventory Models," Operations Research, INFORMS, vol. 56(4), pages 937-944, August.
    20. Larsen, C. & Thorstenson, A., 2014. "The order and volume fill rates in inventory control systems," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 13-19.
    21. Engin Topan & Tarkan Tan & Geert-Jan van Houtum & Rommert Dekker, 2018. "Using imperfect advance demand information in lost-sales inventory systems with the option of returning inventory," IISE Transactions, Taylor & Francis Journals, vol. 50(3), pages 246-264, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yahel Giat, 2024. "Stock Levels and Repair Sourcing in a Periodic Review Exchangeable Item Repair System," Logistics, MDPI, vol. 8(2), pages 1-19, March.
    2. Tianwen Song & Qiang Zhang & Junmu Ran & Wenxue Ran, 2021. "Research on Supplier Collaboration of Daily Consumer Goods under Uncertainty of Supply and Demand," Sustainability, MDPI, vol. 13(10), pages 1-15, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Douniel Lamghari-Idrissi & Roy van Hugten & Geert-Jan van Houtum & Rob Basten, 2022. "Increasing Chip Availability Through a New After-Sales Service Supply Concept at ASML," Interfaces, INFORMS, vol. 52(5), pages 460-470, September.
    2. Dreyfuss, Michael & Giat, Yahel, 2017. "Optimal spares allocation to an exchangeable-item repair system with tolerable wait," European Journal of Operational Research, Elsevier, vol. 261(2), pages 584-594.
    3. Al Hanbali, Ahmad & van der Heijden, Matthieu, 2013. "Interval availability analysis of a two-echelon, multi-item system," European Journal of Operational Research, Elsevier, vol. 228(3), pages 494-503.
    4. Sun, Mingyao & Ng, Chi To & Yang, Liu & Zhang, Tianhua, 2024. "Optimal after-sales service offering strategy: Additive manufacturing, traditional manufacturing, or hybrid?," International Journal of Production Economics, Elsevier, vol. 268(C).
    5. Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
    6. Zhuang, Weifen & Li, Michael Z.F., 2012. "Monotone optimal control for a class of Markov decision processes," European Journal of Operational Research, Elsevier, vol. 217(2), pages 342-350.
    7. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    8. Christos Zacharias & Michael Pinedo, 2017. "Managing Customer Arrivals in Service Systems with Multiple Identical Servers," Manufacturing & Service Operations Management, INFORMS, vol. 19(4), pages 639-656, October.
    9. Qing Li & Peiwen Yu, 2014. "Multimodularity and Its Applications in Three Stochastic Dynamic Inventory Problems," Manufacturing & Service Operations Management, INFORMS, vol. 16(3), pages 455-463, July.
    10. Johansson, Lina & Olsson, Fredrik, 2018. "Age-based inventory control in a multi-echelon system with emergency replenishments," European Journal of Operational Research, Elsevier, vol. 265(3), pages 951-961.
    11. Sgarbossa, Fabio & Peron, Mirco & Lolli, Francesco & Balugani, Elia, 2021. "Conventional or additive manufacturing for spare parts management: An extensive comparison for Poisson demand," International Journal of Production Economics, Elsevier, vol. 233(C).
    12. Zhan Pang & Frank Y. Chen & Youyi Feng, 2012. "Technical Note---A Note on the Structure of Joint Inventory-Pricing Control with Leadtimes," Operations Research, INFORMS, vol. 60(3), pages 581-587, June.
    13. Zhang, Shuguang & Dan, Bin & Zhou, Maosen, 2019. "After-sale service deployment and information sharing in a supply chain under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 279(2), pages 351-363.
    14. Teunter, R.H. & Syntetos, A.A. & Babai, M.Z., 2017. "Stock keeping unit fill rate specification," European Journal of Operational Research, Elsevier, vol. 259(3), pages 917-925.
    15. N. Knofius & M. C. Heijden & A. Sleptchenko & W. H. M. Zijm, 2021. "Improving effectiveness of spare parts supply by additive manufacturing as dual sourcing option," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(1), pages 189-221, March.
    16. Shan Wang & Nan Liu & Guohua Wan, 2020. "Managing Appointment-Based Services in the Presence of Walk-in Customers," Management Science, INFORMS, vol. 66(2), pages 667-686, February.
    17. Larsen, Christian, 2011. "Derivation of confidence intervals of service measures in a base-stock inventory control system with low-frequent demand," International Journal of Production Economics, Elsevier, vol. 131(1), pages 69-75, May.
    18. Zhen Xu & Jiheng Zhang & Rachel Q. Zhang, 2019. "Instantaneous Control of Brownian Motion with a Positive Lead Time," Mathematics of Operations Research, INFORMS, vol. 44(3), pages 943-965, August.
    19. Prak, Dennis & Teunter, Ruud & Babai, Mohamed Zied & Boylan, John E. & Syntetos, Aris, 2021. "Robust compound Poisson parameter estimation for inventory control," Omega, Elsevier, vol. 104(C).
    20. Voorberg, S. & van Jaarsveld, W. & Eshuis, R. & van Houtum, G.J., 2023. "Information acquisition for service contract quotations made by repair shops," European Journal of Operational Research, Elsevier, vol. 305(3), pages 1166-1177.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:219:y:2020:i:c:p:123-137. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.