IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v118y2009i1p260-268.html
   My bibliography  Save this article

Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems

Author

Listed:
  • de Smidt-Destombes, Karin S.
  • van der Heijden, Matthieu C.
  • van Harten, Aart

Abstract

To achieve a high system availability at minimal costs, relevant decisions include the choice of preventive maintenance frequency, spare part inventory levels and spare part repair capacity. We develop heuristics for the joint optimisation of these variables for (a) a single k-out-of-N system under condition-based maintenance and (b) an installed base of multiple identical k-out-of-N systems under block replacement. We show that a straightforward extension of the METRIC method for spare part inventory optimisation yields inferior results, because both the availability and costs are not necessarily monotonous functions of the decision variables. We develop an adjusted marginal analysis and show that it performs considerably better in numerical experiments.

Suggested Citation

  • de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2009. "Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems," International Journal of Production Economics, Elsevier, vol. 118(1), pages 260-268, March.
  • Handle: RePEc:eee:proeco:v:118:y:2009:i:1:p:260-268
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(08)00272-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2006. "On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out," European Journal of Operational Research, Elsevier, vol. 174(1), pages 182-200, October.
    2. A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
    3. R. Natarajan, 1968. "A Reliability Problem with Spares and Multiple Repair Facilities," Operations Research, INFORMS, vol. 16(5), pages 1041-1057, October.
    4. Zijm, W. Henk & Avsar, Zeynep Muge, 2003. "Capacitated two-indenture models for repairable item systems," International Journal of Production Economics, Elsevier, vol. 81(1), pages 573-588, January.
    5. J-S Kim & K-C Shin & S-K Park, 2000. "An optimal algorithm for repairable-item inventory system with depot spares," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(3), pages 350-357, March.
    6. Park, Young T. & Park, Kyung S., 1986. "Generalized spare ordering policies with random lead time," European Journal of Operational Research, Elsevier, vol. 23(3), pages 320-330, March.
    7. Chelbi, Anis & Ait-Kadi, Daoud, 2001. "Spare provisioning strategy for preventively replaced systems subjected to random failure," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 183-189, December.
    8. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2002. "Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems," International Journal of Production Economics, Elsevier, vol. 79(3), pages 209-230, October.
    9. Zohrul Kabir, A. B. M. & Al-Olayan, Ahmed S., 1996. "A stocking policy for spare part provisioning under age based preventive replacement," European Journal of Operational Research, Elsevier, vol. 90(1), pages 171-181, April.
    10. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2005. "Using repair priorities to reduce stock investment in spare part networks," European Journal of Operational Research, Elsevier, vol. 163(3), pages 733-750, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    2. van Jaarsveld, Willem & Dekker, Rommert, 2011. "Spare parts stock control for redundant systems using reliability centered maintenance data," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1576-1586.
    3. Zhong, Chongquan & Jin, Haibo, 2014. "A novel optimal preventive maintenance policy for a cold standby system based on semi-Markov theory," European Journal of Operational Research, Elsevier, vol. 232(2), pages 405-411.
    4. Wang, Wenbin, 2012. "A stochastic model for joint spare parts inventory and planned maintenance optimisation," European Journal of Operational Research, Elsevier, vol. 216(1), pages 127-139.
    5. Wang, Wenbin, 2011. "A joint spare part and maintenance inspection optimisation model using the Delay-Time concept," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1535-1541.
    6. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
    7. Olde Keizer, Minou C.A. & Teunter, Ruud H. & Veldman, Jasper, 2016. "Clustering condition-based maintenance for systems with redundancy and economic dependencies," European Journal of Operational Research, Elsevier, vol. 251(2), pages 531-540.
    8. Farhadi, Mohammad & Shahrokhi, Mahmoud & Rahmati, Seyed Habib A, 2022. "Developing a supplier selection model based on Markov chain and probability tree for a k-out-of-N system with different quality of spare parts," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
    9. van Jaarsveld, W.L. & Dekker, R., 2010. "Integrating Reliability Centered Maintenance and Spare Parts Stock Control," Econometric Institute Research Papers EI 2010-16, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    10. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    11. Zheng, Meimei & Lin, Jie & Xia, Tangbin & Liu, Yu & Pan, Ershun, 2023. "Joint condition-based maintenance and spare provisioning policy for a K-out-of-N system with failures during inspection intervals," European Journal of Operational Research, Elsevier, vol. 308(3), pages 1220-1232.
    12. Wang, Wenbin & Syntetos, Aris A., 2011. "Spare parts demand: Linking forecasting to equipment maintenance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(6), pages 1194-1209.
    13. Zhang, Xiaohong & Zeng, Jianchao, 2017. "Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems," European Journal of Operational Research, Elsevier, vol. 262(2), pages 479-498.
    14. Wang, Jingjing & Qiu, Qingan & Wang, Huanhuan, 2021. "Joint optimization of condition-based and age-based replacement policy and inventory policy for a two-unit series system," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    15. de Pater, Ingeborg & Mitici, Mihaela, 2021. "Predictive maintenance for multi-component systems of repairables with Remaining-Useful-Life prognostics and a limited stock of spare components," Reliability Engineering and System Safety, Elsevier, vol. 214(C).
    16. Zhu, Mixin & Zhou, Xiaojun, 2023. "Hierarchical-clustering-based joint optimization of spare part provision and maintenance scheduling for serial-parallel multi-station manufacturing systems," International Journal of Production Economics, Elsevier, vol. 264(C).
    17. Zahedi-Hosseini, Farhad & Scarf, Philip & Syntetos, Aris, 2017. "Joint optimisation of inspection maintenance and spare parts provisioning: a comparative study of inventory policies using simulation and survey data," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 306-316.
    18. Ito, Kodo & Mizutani, Satoshi & Nakagawa, Toshio, 2020. "Optimal inspection models with minimal repair," Reliability Engineering and System Safety, Elsevier, vol. 201(C).
    19. de Jonge, Bram & Scarf, Philip A., 2020. "A review on maintenance optimization," European Journal of Operational Research, Elsevier, vol. 285(3), pages 805-824.
    20. Wang, Jun & Zhu, Xiaoyan, 2021. "Joint optimization of condition-based maintenance and inventory control for a k-out-of-n:F system of multi-state degrading components," European Journal of Operational Research, Elsevier, vol. 290(2), pages 514-529.
    21. Zhang, Qin & Liu, Yu & Xiahou, Tangfan & Huang, Hong-Zhong, 2023. "A heuristic maintenance scheduling framework for a military aircraft fleet under limited maintenance capacities," Reliability Engineering and System Safety, Elsevier, vol. 235(C).
    22. Safaei, Fatemeh & Ahmadi, Jafar & Taghipour, Sharareh, 2022. "A maintenance policy for a k-out-of-n system under enhancing the system’s operating time and safety constraints, and selling the second-hand components," Reliability Engineering and System Safety, Elsevier, vol. 218(PA).
    23. Van Horenbeek, Adriaan & Buré, Jasmine & Cattrysse, Dirk & Pintelon, Liliane & Vansteenwegen, Pieter, 2013. "Joint maintenance and inventory optimization systems: A review," International Journal of Production Economics, Elsevier, vol. 143(2), pages 499-508.
    24. Zhang, Xiaohong & Liao, Haitao & Zeng, Jianchao & Shi, Guannan & Zhao, Bing, 2021. "Optimal Condition-based Opportunistic Maintenance and Spare Parts Provisioning for a Two-unit System using a State Space Partitioning Approach," Reliability Engineering and System Safety, Elsevier, vol. 209(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2007. "Availability of k-out-of-N systems under block replacement sharing limited spares and repair capacity," International Journal of Production Economics, Elsevier, vol. 107(2), pages 404-421, June.
    2. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2006. "On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out," European Journal of Operational Research, Elsevier, vol. 174(1), pages 182-200, October.
    3. Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
    4. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    5. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    6. Wang, Wenbin, 2012. "A stochastic model for joint spare parts inventory and planned maintenance optimisation," European Journal of Operational Research, Elsevier, vol. 216(1), pages 127-139.
    7. Van Horenbeek, Adriaan & Buré, Jasmine & Cattrysse, Dirk & Pintelon, Liliane & Vansteenwegen, Pieter, 2013. "Joint maintenance and inventory optimization systems: A review," International Journal of Production Economics, Elsevier, vol. 143(2), pages 499-508.
    8. Sleptchenko, Andrei & Turan, Hasan Hüseyin & Pokharel, Shaligram & ElMekkawy, Tarek Y., 2019. "Cross-training policies for repair shops with spare part inventories," International Journal of Production Economics, Elsevier, vol. 209(C), pages 334-345.
    9. Turan, Hasan Hüseyin & Atmis, Mahir & Kosanoglu, Fuat & Elsawah, Sondoss & Ryan, Michael J., 2020. "A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    10. Nguyen, T.P. Khanh & Yeung, Thomas G. & Castanier, Bruno, 2013. "Optimal maintenance and replacement decisions under technological change with consideration of spare parts inventories," International Journal of Production Economics, Elsevier, vol. 143(2), pages 472-477.
    11. Tiemessen, H.G.H. & van Houtum, G.J., 2013. "Reducing costs of repairable inventory supply systems via dynamic scheduling," International Journal of Production Economics, Elsevier, vol. 143(2), pages 478-488.
    12. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    13. van der Heijden, M.C. & Alvarez, E.M. & Schutten, J.M.J., 2013. "Inventory reduction in spare part networks by selective throughput time reduction," International Journal of Production Economics, Elsevier, vol. 143(2), pages 509-517.
    14. Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
    15. Minjae Park & Ki Mun Jung & Dong Ho Park, 2016. "Optimal warranty policies considering repair service and replacement service under the manufacturer’s perspective," Annals of Operations Research, Springer, vol. 244(1), pages 117-132, September.
    16. Patriarca, Riccardo & Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2016. "Inventory optimization for a customer airline in a Performance Based Contract," Journal of Air Transport Management, Elsevier, vol. 57(C), pages 206-216.
    17. Nasuh Buyukkaramikli & Henny Ooijen & J. Bertrand, 2015. "Integrating inventory control and capacity management at a maintenance service provider," Annals of Operations Research, Springer, vol. 231(1), pages 185-206, August.
    18. Levner, Eugene & Perlman, Yael & Cheng, T.C.E. & Levner, Ilya, 2011. "A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand," International Journal of Production Economics, Elsevier, vol. 132(1), pages 43-51, July.
    19. Panagiotidou, Sofia, 2014. "Joint optimization of spare parts ordering and maintenance policies for multiple identical items subject to silent failures," European Journal of Operational Research, Elsevier, vol. 235(1), pages 300-314.
    20. Parvaneh Samouei & Amir Kheirkhah & Parviz Fattahi, 2015. "A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount," Annals of Operations Research, Springer, vol. 226(1), pages 551-563, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:118:y:2009:i:1:p:260-268. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.