IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v81-82y2003i1p573-588.html
   My bibliography  Save this article

Capacitated two-indenture models for repairable item systems

Author

Listed:
  • Zijm, W. Henk
  • Avsar, Zeynep Muge

Abstract

No abstract is available for this item.

Suggested Citation

  • Zijm, W. Henk & Avsar, Zeynep Muge, 2003. "Capacitated two-indenture models for repairable item systems," International Journal of Production Economics, Elsevier, vol. 81(1), pages 573-588, January.
  • Handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:573-588
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(02)00360-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Warren H. Hausman & Gary D. Scudder, 1982. "Priority Scheduling Rules for Repairable Inventory Systems," Management Science, INFORMS, vol. 28(11), pages 1215-1232, November.
    2. Yong-Joo Lee & Paul Zipkin, 1992. "Tandem Queues with Planned Inventories," Operations Research, INFORMS, vol. 40(5), pages 936-947, October.
    3. John A. Muckstadt, 1973. "A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System," Management Science, INFORMS, vol. 20(4-Part-I), pages 472-481, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    2. Nasuh Buyukkaramikli & Henny Ooijen & J. Bertrand, 2015. "Integrating inventory control and capacity management at a maintenance service provider," Annals of Operations Research, Springer, vol. 231(1), pages 185-206, August.
    3. Patriarca, Riccardo & Costantino, Francesco & Di Gravio, Giulio & Tronci, Massimo, 2016. "Inventory optimization for a customer airline in a Performance Based Contract," Journal of Air Transport Management, Elsevier, vol. 57(C), pages 206-216.
    4. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2006. "On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out," European Journal of Operational Research, Elsevier, vol. 174(1), pages 182-200, October.
    5. Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
    6. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    7. de Smidt-Destombes, Karin S. & van der Heijden, Matthieu C. & van Harten, Aart, 2009. "Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems," International Journal of Production Economics, Elsevier, vol. 118(1), pages 260-268, March.
    8. García-Benito, Juan Carlos & Martín-Peña, María-Luz, 2021. "A redistribution model with minimum backorders of spare parts: A proposal for the defence sector," European Journal of Operational Research, Elsevier, vol. 291(1), pages 178-193.
    9. Tiemessen, H.G.H. & van Houtum, G.J., 2013. "Reducing costs of repairable inventory supply systems via dynamic scheduling," International Journal of Production Economics, Elsevier, vol. 143(2), pages 478-488.
    10. Avṣar, Zeynep Müge & Henk Zijm, W., 2014. "Approximate queueing models for capacitated multi-stage inventory systems under base-stock control," European Journal of Operational Research, Elsevier, vol. 236(1), pages 135-146.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    2. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    3. David Simchi-Levi & Yao Zhao, 2005. "Safety Stock Positioning in Supply Chains with Stochastic Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 295-318, December.
    4. Tiemessen, H.G.H. & van Houtum, G.J., 2013. "Reducing costs of repairable inventory supply systems via dynamic scheduling," International Journal of Production Economics, Elsevier, vol. 143(2), pages 478-488.
    5. Alfredsson, Patrik, 1997. "Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities," European Journal of Operational Research, Elsevier, vol. 99(3), pages 584-595, June.
    6. Zipkin, Paul, 1995. "Processing networks with planned inventories: Tandem queues with feedback," European Journal of Operational Research, Elsevier, vol. 80(2), pages 344-349, January.
    7. Sen Lin & Bo Li & Antonio Arreola-Risa & Yiwei Huang, 2023. "Optimizing a single-product production-inventory system under constant absolute risk aversion," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 31(3), pages 510-537, October.
    8. Duri, C. & Frein, Y. & Di Mascolo, M., 2000. "Performance evaluation and design of base stock systems," European Journal of Operational Research, Elsevier, vol. 127(1), pages 172-188, November.
    9. van der Heijden, M.C. & Alvarez, E.M. & Schutten, J.M.J., 2013. "Inventory reduction in spare part networks by selective throughput time reduction," International Journal of Production Economics, Elsevier, vol. 143(2), pages 509-517.
    10. Voorberg, S. & van Jaarsveld, W. & Eshuis, R. & van Houtum, G.J., 2023. "Information acquisition for service contract quotations made by repair shops," European Journal of Operational Research, Elsevier, vol. 305(3), pages 1166-1177.
    11. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    12. van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
    13. van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
    14. Almehdawe, Eman & Jewkes, Elizabeth, 2013. "Performance analysis and optimization of hybrid manufacturing systems under a batch ordering policy," International Journal of Production Economics, Elsevier, vol. 144(1), pages 200-208.
    15. Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
    16. Hernan Caceres & Dongchen Yu & Alexander Nikolaev, 2018. "Evaluating shortfall distributions in periodic inventory systems with stochastic endogenous demands and lead-times," Annals of Operations Research, Springer, vol. 271(2), pages 405-427, December.
    17. S. Christian Albright & Amit Gupta, 1993. "Steady‐state approximation of a multiechelon multi‐indentured repairable‐item inventory system with a single repair facility," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(4), pages 479-493, June.
    18. Wang, Naichao & Li, Mingyuan & Xiao, Boping & Ma, Lin, 2019. "Availability analysis of a general time distribution system with the consideration of maintenance and spares," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
    19. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    20. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:573-588. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.