Author
Listed:
- Jaoui, Nadia
- Klibi, Walid
- El Hachemi, Nizar
- Aouam, Tarik
- Fender, Michel
Abstract
This study addresses a novel production network design problem with an expanded scope inspired by a real-world business context. The problem involves strategic decisions for a long-term horizon regarding production sites’ location and capacity, suppliers’ selection, and transportation modes choice, given in-house vs external service providers’ options. To support these decisions, we integrate key tactical decisions for a large set of planning periods, involving flows between origin–destination pairs, production levels based on bill of materials, and inventory levels. Additionally, we consider uncertainty in raw material availability at suppliers, disruption in production capacities, and perturbation in transportation flows. First, we develop a multi-stage stochastic program that re-optimizes strategic decisions at each design period. Then, this program is reformulated into a multi-cycle two-stage stochastic model. Uncertainty is modeled through a finite set of scenarios generated using the Latin hypercube sampling technique, and the sample average approximation method is used to calibrate the sample size. Given the challenging solvability of the model, we proposed an advanced solution approach that builds on the recently introduced Partial Benders Decomposition (PBD) technique with new scenario creation strategies. Our experiments highlight the superiority of the proposed PBD’s variant in terms of solution quality and time reaching the best solution, compared to classical approaches. Furthermore, we demonstrate the benefits of enlarging the scope of the production network design problem by integrating all strategic decisions, which can yield gains of up to 36% compared to addressing them separately. Finally, we underscore the importance of stochastic modeling, contributing to cost reductions of over 3% compared to the deterministic counterpart.
Suggested Citation
Jaoui, Nadia & Klibi, Walid & El Hachemi, Nizar & Aouam, Tarik & Fender, Michel, 2026.
"Multi-cycle production network design under supply uncertainty,"
European Journal of Operational Research, Elsevier, vol. 330(3), pages 816-837.
Handle:
RePEc:eee:ejores:v:330:y:2026:i:3:p:816-837
DOI: 10.1016/j.ejor.2025.09.008
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:330:y:2026:i:3:p:816-837. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.