IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v244y2015i3p867-880.html
   My bibliography  Save this article

On the upgrading policy after the redesign of a component for reliability improvement

Author

Listed:
  • Öner, K.B.
  • Kiesmüller, G.P.
  • van Houtum, G.J.

Abstract

We consider an OEM who is responsible for the availability of her systems in the field through performance-based contracts. She detects that a critical reparable component in her systems has a poor reliability performance. She decides to improve its reliability by a redesign of that component and an upgrade of the systems by replacing the old components with the improved ones. We introduce a model for studying the following two upgrading policies that she may implement after the redesign: (1) Upgrade all systems preventively just after the redesign (at time 0), (2) Upgrade systems one-by-one correctively; i.e., only when an old component fails. Under Policy 2, the OEM decides on an initial supply quantity of the improved components. Once this initial supply is depleted, she can procure improved components in fixed-sized batches with a higher unit price. Per policy, we derive total cost functions, which include procurement/replenishment costs of the new components, upgrading costs, repair costs of the new components, inventory holding costs and downtime costs. We perform exact analysis and provide an efficient optimization algorithm for Policy 2. Through a numerical study, we derive insights on which of the two policies is the best one and we show how this depends on the lifetime of the systems, the reliability of the old components, the improvement level in the reliability, the increase in the unit price, downtime costs, the size of installed base, and the batch size.

Suggested Citation

  • Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2015. "On the upgrading policy after the redesign of a component for reliability improvement," European Journal of Operational Research, Elsevier, vol. 244(3), pages 867-880.
  • Handle: RePEc:eee:ejores:v:244:y:2015:i:3:p:867-880
    DOI: 10.1016/j.ejor.2015.02.007
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221715001046
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2015.02.007?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ali Dogramaci & Nelson M. Fraiman, 2004. "Replacement Decisions with Maintenance Under Uncertainty: An Imbedded Optimal Control Model," Operations Research, INFORMS, vol. 52(5), pages 785-794, October.
    2. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
    3. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2010. "Optimization of component reliability in the design phase of capital goods," European Journal of Operational Research, Elsevier, vol. 205(3), pages 615-624, September.
    4. Sampath Rajagopalan & Medini R. Singh & Thomas E. Morton, 1998. "Capacity Expansion and Replacement in Growing Markets with Uncertain Technological Breakthroughs," Management Science, INFORMS, vol. 44(1), pages 12-30, January.
    5. Nair, Suresh K. & Hopp, Wallace J., 1992. "A model for equipment replacement due to technological obsolescence," European Journal of Operational Research, Elsevier, vol. 63(2), pages 207-221, December.
    6. Jose A. Guajardo & Morris A. Cohen & Sang-Hyun Kim & Serguei Netessine, 2012. "Impact of Performance-Based Contracting on Product Reliability: An Empirical Analysis," Management Science, INFORMS, vol. 58(5), pages 961-979, May.
    7. Abraham Mehrez & Gad Rabinowitz & Eli Shemesh, 2000. "A Discrete Maintenance and Replacement Model under Technological Breakthrough Expectations," Annals of Operations Research, Springer, vol. 99(1), pages 351-372, December.
    8. G. Bethuyne, 2002. "The Timing of Technology Adoption by a Cost-minimizing Firm," Journal of Economics, Springer, vol. 76(2), pages 123-154, June.
    9. Clavareau, Julien & Labeau, Pierre-Etienne, 2009. "Maintenance and replacement policies under technological obsolescence," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 370-381.
    10. Kranenburg, A.A. & van Houtum, G.J., 2009. "A new partial pooling structure for spare parts networks," European Journal of Operational Research, Elsevier, vol. 199(3), pages 908-921, December.
    11. Sophie Mercier, 2008. "Optimal replacement policy for obsolete components with general failure rates," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 24(3), pages 221-235, May.
    12. Clavareau, Julien & Labeau, Pierre-Etienne, 2009. "A Petri net-based modelling of replacement strategies under technological obsolescence," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 357-369.
    13. Sophie Mercier & Pierre‐Etienne Labeau, 2004. "Optimal replacement policy for a series system with obsolescence," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 20(1), pages 73-91, January.
    14. Suresh Sethi & Suresh Chand, 1979. "Planning Horizon Procedures for Machine Replacement Models," Management Science, INFORMS, vol. 25(2), pages 140-151, February.
    15. Nguyen, T.P. Khanh & Yeung, Thomas G. & Castanier, Bruno, 2013. "Optimal maintenance and replacement decisions under technological change with consideration of spare parts inventories," International Journal of Production Economics, Elsevier, vol. 143(2), pages 472-477.
    16. Suresh K. Nair, 1995. "Modeling Strategic Investment Decisions Under Sequential Technological Change," Management Science, INFORMS, vol. 41(2), pages 282-297, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zheng, Wei & Li, Bo & Song, Dongping & Li, Yanran, 2023. "Innovative development strategy of a risk-averse firm considering product unreliability under competition," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 172(C).
    2. Qianru Ge & Willem van Jaarsveld & Zümbül Atan, 2020. "Optimal redesign decisions through failure rate estimates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(4), pages 254-271, June.
    3. Westerweel, Bram & Basten, Rob J.I. & van Houtum, Geert-Jan, 2018. "Traditional or Additive Manufacturing? Assessing Component Design Options through Lifecycle Cost Analysis," European Journal of Operational Research, Elsevier, vol. 270(2), pages 570-585.
    4. Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mellal, Mohamed Arezki, 2020. "Obsolescence – A review of the literature," Technology in Society, Elsevier, vol. 63(C).
    2. Nguyen, T.P. Khanh & Yeung, Thomas G. & Castanier, Bruno, 2013. "Optimal maintenance and replacement decisions under technological change with consideration of spare parts inventories," International Journal of Production Economics, Elsevier, vol. 143(2), pages 472-477.
    3. Nguyen, T.P.K. & Castanier, Bruno & Yeung, Thomas G., 2014. "Maintaining a system subject to uncertain technological evolution," Reliability Engineering and System Safety, Elsevier, vol. 128(C), pages 56-65.
    4. Qianru Ge & Willem van Jaarsveld & Zümbül Atan, 2020. "Optimal redesign decisions through failure rate estimates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(4), pages 254-271, June.
    5. Khanh T.P. Nguyen & Thomas Yeung & Bruno Castanier, 2017. "Acquisition of new technology information for maintenance and replacement policies," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2212-2231, April.
    6. Yatsenko, Yuri & Hritonenko, Natali, 2017. "Machine replacement under evolving deterministic and stochastic costs," International Journal of Production Economics, Elsevier, vol. 193(C), pages 491-501.
    7. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    8. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
    9. Rahman, Atiqur & Loulou, Richard, 2001. "Technology acquisition with technological progress: effects of expectations, rivalry and uncertainty," European Journal of Operational Research, Elsevier, vol. 129(1), pages 159-185, February.
    10. Kurtuluş Barış Öner & Alan Scheller-Wolf & Geert-Jan van Houtum, 2013. "Redundancy Optimization for Critical Components in High-Availability Technical Systems," Operations Research, INFORMS, vol. 61(1), pages 244-264, February.
    11. A. Bensoussan & Q. Feng & S. P. Sethi, 2022. "Integrating equipment investment strategy with maintenance operations under uncertain failures," Annals of Operations Research, Springer, vol. 317(2), pages 353-386, October.
    12. Yuri Yatsenko & Natali Hritonenko, 2016. "Asset replacement under improving operating and capital costs: a practical approach," International Journal of Production Research, Taylor & Francis Journals, vol. 54(10), pages 2922-2933, May.
    13. Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
    14. Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
    15. Yatsenko, Yuri & Hritonenko, Natali, 2015. "Algorithms for asset replacement under limited technological forecast," International Journal of Production Economics, Elsevier, vol. 160(C), pages 26-33.
    16. Phuc Hong Nguyen & Kung-Jeng Wang, 2019. "Strategic capacity portfolio planning under demand uncertainty and technological change," Flexible Services and Manufacturing Journal, Springer, vol. 31(4), pages 926-944, December.
    17. Mørch, Ove & Fagerholt, Kjetil & Pantuso, Giovanni & Rakke, Jørgen, 2017. "Maximizing the rate of return on the capital employed in shipping capacity renewal," Omega, Elsevier, vol. 67(C), pages 42-53.
    18. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    19. Jieun Lee & Hyung-Deok Shin & Saehwa Hong, 2021. "Servitization of Global Manufacturing Business," Journal of Industry, Competition and Trade, Springer, vol. 21(4), pages 565-584, December.
    20. Wang, Yulan & Wallace, Stein W. & Shen, Bin & Choi, Tsan-Ming, 2015. "Service supply chain management: A review of operational models," European Journal of Operational Research, Elsevier, vol. 247(3), pages 685-698.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:244:y:2015:i:3:p:867-880. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.