IDEAS home Printed from https://ideas.repec.org/p/wiw/wiwrsa/ersa10p1060.html
   My bibliography  Save this paper

On the Design of Public Infrastructure procurements

Author

Listed:
  • Arno Van Der Vlist
  • Sander Hardeman

Abstract

Public procurement of infrastructure has been subject to a long standing debate concerning the procurements' qualification requirements. Basically, it remains unclear what determines public procurement officers to vary procurements' qualification requirements. This research serves to elaborate on public procurements' procedure design. The aim of this paper is to improve our understanding of why contracting authorities choose specific requirements prior to public procurement. What determines variation in public procurements' qualification requirements? For this the procurements' procedure design is modelled as a rational choice among a set of alternatives within a random utility framework. Qualification requirements are chosen as to maximize utility of the procurements' officer. In the empirical part of the paper the procurements' procedure design is modelled as a limited dependent variable model. The data comes from the EIB Monitor Procurements covering public procurements in the Netherlands, and relates to public open procurements of civil work posted by municipalities in the first half of 2009. The model results indicate that requirements do relate to degree of professionalism of the procurement office and to the type of work. These results indicate a rational choice among qualification requirements yet explain about 15 percent of total variation, suggesting other factors at work. Keywords: Construction industry, infrastructure, Bidding, Public Procurement Auctions, municipalities

Suggested Citation

  • Arno Van Der Vlist & Sander Hardeman, 2011. "On the Design of Public Infrastructure procurements," ERSA conference papers ersa10p1060, European Regional Science Association.
  • Handle: RePEc:wiw:wiwrsa:ersa10p1060
    as

    Download full text from publisher

    File URL: https://www-sre.wu.ac.at/ersa/ersaconfs/ersa10/ERSA2010finalpaper1060.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Estache, Antonio & Iimi, Atsushi, 2008. "Procurement efficiency for infrastructure development and financial needs reassessed," Policy Research Working Paper Series 4662, The World Bank.
    2. Dakshina G. De Silva & Timothy Dunne & Georgia Kosmopoulou, 2003. "An Empirical Analysis of Entrant and Incumbent Bidding in Road Construction Auctions," Journal of Industrial Economics, Wiley Blackwell, vol. 51(3), pages 295-316, September.
    3. Patrick Bajari & Lixin Ye, 2003. "Deciding Between Competition and Collusion," The Review of Economics and Statistics, MIT Press, vol. 85(4), pages 971-989, November.
    4. Srabana Gupta, 2001. "The Effect of Bid Rigging on Prices: A Study of the Highway Construction Industry," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 19(4), pages 451-465, December.
    5. Estache, Antonio & Iimi, Atsushi, 2009. "Auctions with endogenous participation and quality thresholds : evidence from ODA infrastructure procurement," Policy Research Working Paper Series 4853, The World Bank.
    6. Train,Kenneth E., 2009. "Discrete Choice Methods with Simulation," Cambridge Books, Cambridge University Press, number 9780521747387.
    7. De Silva, Dakshina G. & Dunne, Timothy & Kankanamge, Anuruddha & Kosmopoulou, Georgia, 2008. "The impact of public information on bidding in highway procurement auctions," European Economic Review, Elsevier, vol. 52(1), pages 150-181, January.
    8. Gaver, Kenneth M & Zimmerman, Jerold L, 1977. "An Analysis of Competitive Bidding on BART Contracts," The Journal of Business, University of Chicago Press, vol. 50(3), pages 279-295, July.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hiroshi Ohashi, 2009. "Effects of Transparency in Procurement Practices on Government Expenditure: A Case Study of Municipal Public Works," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 34(3), pages 267-285, May.
    2. Estache, Antonio & Iimi, Atsushi, 2011. "(Un)bundling infrastructure procurement: Evidence from water supply and sewage projects," Utilities Policy, Elsevier, vol. 19(2), pages 104-114, June.
    3. De Silva, Dakshina G. & Kosmopoulou, Georgia & Lamarche, Carlos, 2009. "The effect of information on the bidding and survival of entrants in procurement auctions," Journal of Public Economics, Elsevier, vol. 93(1-2), pages 56-72, February.
    4. Antonio Estache & Atsushi Iimi, 2012. "Quality or Price? Evidence from ODA-Financed Public Procurement," Public Finance Review, , vol. 40(4), pages 435-469, July.
    5. De Silva, D & Pagel, B. & Peeters, R.J.A.P., 2008. "Sequential versus simultaneous auctioning of procurement contracts with common value and private value components," Research Memorandum 005, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
    6. De Silva, Dakshina G. & Hubbard, Timothy P. & Kosmopoulou, Georgia, 2020. "An evaluation of a bidder training program," International Journal of Industrial Organization, Elsevier, vol. 72(C).
    7. Dakshina De Silva & Thomas Jeitschko & Georgia Kosmopoulou, 2009. "Entry and Bidding in Common and Private Value Auctions with an Unknown Number of Rivals," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 35(1), pages 73-93, September.
    8. Paul Klemperer, 2007. "Bidding Markets," Journal of Competition Law and Economics, Oxford University Press, vol. 3(1), pages 1-47.
    9. Saini, Viplav, 2010. "Reserve prices in a dynamic auction when bidders are capacity-constrained," Economics Letters, Elsevier, vol. 108(3), pages 303-306, September.
    10. Ilke Onur & Bedri Kamil Onur Tas, 2019. "Optimal bidder participation in public procurement auctions," International Tax and Public Finance, Springer;International Institute of Public Finance, vol. 26(3), pages 595-617, June.
    11. Mats A. Bergman & Johan Lundberg & Sofia Lundberg & Johan Y. Stake, 2020. "Interactions Across Firms and Bid Rigging," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 56(1), pages 107-130, February.
    12. Atsushi Iimi, 2013. "Testing Low-Balling Strategy in Rural Road Procurement," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 43(3), pages 243-261, November.
    13. Antonio Estache & Atsushi Iimi, 2010. "Bidder Asymmetry in Infrastructure Procurement: Are There any Fringe Bidders?," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 36(2), pages 163-187, March.
    14. Sheng Li & Peter Philips, 2012. "Construction Procurement Auctions: Do Entrant Bidders Employ More Aggressive Strategies than Incumbent Bidders?," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 40(3), pages 191-205, May.
    15. David Barrus & Frank Scott, 2020. "Single Bidders and Tacit Collusion in Highway Procurement Auctions," Journal of Industrial Economics, Wiley Blackwell, vol. 68(3), pages 483-522, September.
    16. de Leverano, Adriano, 2019. "Collusion through market sharing agreements: Evidence from Quebec's road paving market," ZEW Discussion Papers 19-053, ZEW - Leibniz Centre for European Economic Research.
    17. Dakshina De Silva & Georgia Kosmopoulou & Beatrice Pagel & Ronald Peeters, 2013. "The Impact of Timing on Bidding Behavior in Procurement Auctions of Contracts with Private Costs," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 42(3), pages 321-343, May.
    18. Gregory Lewis & Patrick Bajari, 2014. "Moral Hazard, Incentive Contracts, and Risk: Evidence from Procurement," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 81(3), pages 1201-1228.
    19. De Silva, Dakshina G. & Dunne, Timothy & Kosmopoulou, Georgia & Lamarche, Carlos, 2012. "Disadvantaged business enterprise goals in government procurement contracting: An analysis of bidding behavior and costs," International Journal of Industrial Organization, Elsevier, vol. 30(4), pages 377-388.
    20. Georgia Kosmopoulou & Xueqi Zhou, 2014. "Price Adjustment Policies in Procurement Contracting: An Analysis of Bidding Behavior," Journal of Industrial Economics, Wiley Blackwell, vol. 62(1), pages 77-112, March.

    More about this item

    Keywords

    construction industry; infrastructure; bidding; public procurement auctions; municipalities;
    All these keywords.

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wiw:wiwrsa:ersa10p1060. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Gunther Maier (email available below). General contact details of provider: http://www.ersa.org .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.