Generation adequacy and transmission interconnection in regional electricity markets
Author
Abstract
Suggested Citation
DOI: 10.1016/j.enpol.2009.08.060
Note: View the original document on HAL open archive server: https://enpc.hal.science/hal-00716344v1
Download full text from publisher
Other versions of this item:
- Cepeda, Mauricio & Saguan, Marcelo & Finon, Dominique & Pignon, Virginie, 2009. "Generation adequacy and transmission interconnection in regional electricity markets," Energy Policy, Elsevier, vol. 37(12), pages 5612-5622, December.
References listed on IDEAS
- Peter Cramton & Steven Stoft, 2006. "The Convergence of Market Designs for Adequate Generating Capacity," Papers of Peter Cramton 06mdfra, University of Maryland, Department of Economics - Peter Cramton, revised 2006.
- Paul L. Joskow, 2008.
"Lessons Learned From Electricity Market Liberalization,"
The Energy Journal, , vol. 29(2_suppl), pages 9-42, December.
- Paul L. Joskow, 2008. "Lessons Learned from Electricity Market Liberalization," The Energy Journal, International Association for Energy Economics, vol. 0(Special I), pages 9-42.
- Dieter Helm, 2007. "European energy policy: meeting the security of supply and climate change challenges," EIB Papers 2/2007, European Investment Bank, Economics Department.
- Finon, Dominique & Pignon, Virginie, 2008.
"Electricity and long-term capacity adequacy: The quest for regulatory mechanism compatible with electricity market,"
Utilities Policy, Elsevier, vol. 16(3), pages 143-158, September.
- Dominique Finon & Virginie Pignon, 2008. "Electricity and long-term capacity adequacy: The quest for regulatory mechanism compatible with electricity market," Post-Print hal-00716312, HAL.
- De Vries, Laurens J., 2007. "Generation adequacy: Helping the market do its job," Utilities Policy, Elsevier, vol. 15(1), pages 20-35, March.
- Creti, Anna & Fabra, Natalia, 2007. "Supply security and short-run capacity markets for electricity," Energy Economics, Elsevier, vol. 29(2), pages 259-276, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Möbius, Thomas & Riepin, Iegor & Müsgens, Felix & van der Weijde, Adriaan H., 2023. "Risk aversion and flexibility options in electricity markets," Energy Economics, Elsevier, vol. 126(C).
- Ochoa, Camila & Gore, Olga, 2015. "The Finnish power market: Are imports from Russia low-cost?," Energy Policy, Elsevier, vol. 80(C), pages 122-132.
- Astier, Nicolas & Ovaere, Marten, 2022.
"Reliability standards and generation adequacy assessments for interconnected electricity systems,"
Energy Policy, Elsevier, vol. 168(C).
- Nicolas Astier & Marten Ovaere, 2022. "Reliability standards and generation adequacy assessments for interconnected electricity systems," PSE-Ecole d'économie de Paris (Postprint) halshs-03756842, HAL.
- Nicolas Astier & Marten Ovaere, 2022. "Reliability standards and generation adequacy assessments for interconnected electricity systems," Post-Print halshs-03756842, HAL.
- repec:dau:papers:123456789/13152 is not listed on IDEAS
- Ochoa, Camila & van Ackere, Ann, 2015. "Winners and losers of market coupling," Energy, Elsevier, vol. 80(C), pages 522-534.
- Bakhshideh Zad, Bashir & Toubeau, Jean-François & Bruninx, Kenneth & Vatandoust, Behzad & De Grève, Zacharie & Vallée, François, 2022. "Supervised learning-assisted modeling of flow-based domains in European resource adequacy assessments," Applied Energy, Elsevier, vol. 325(C).
- Simeon Hagspiel, 2017. "Reliable Electricity: The Effects of System Integration and Cooperative Measures to Make it Work," EWI Working Papers 2017-13, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Simeon Hagspiel & Andreas Knaut & Jakob Peter, 2017. "Reliability in Multy-Regional Power Systems - Capacity Adequacy and the Role of Interconnectors," EWI Working Papers 2017-7, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Jakob Peter & Johannes Wagner, 2018. "Optimal Allocation of Variable Renewable Energy Considering Contributions to Security of Supply," EWI Working Papers 2018-2, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Zakeri, Behnam & Price, James & Zeyringer, Marianne & Keppo, Ilkka & Mathiesen, Brian Vad & Syri, Sanna, 2018. "The direct interconnection of the UK and Nordic power market – Impact on social welfare and renewable energy integration," Energy, Elsevier, vol. 162(C), pages 1193-1204.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Roques, Fabien & Finon, Dominique, 2017. "Adapting electricity markets to decarbonisation and security of supply objectives: Toward a hybrid regime?," Energy Policy, Elsevier, vol. 105(C), pages 584-596.
- Keppler, Jan Horst & Quemin, Simon & Saguan, Marcelo, 2022.
"Why the sustainable provision of low-carbon electricity needs hybrid markets,"
Energy Policy, Elsevier, vol. 171(C).
- Jan-Horst Keppler & Simon Quemin & Marcelo Saguan, 2022. "Why the sustainable provision of low-carbon electricity needs hybrid markets," Post-Print hal-03964488, HAL.
- Bhagwat, Pradyumna C. & de Vries, Laurens J. & Hobbs, Benjamin F., 2016. "Expert survey on capacity markets in the US: Lessons for the EU," Utilities Policy, Elsevier, vol. 38(C), pages 11-17.
- Cepeda, Mauricio & Finon, Dominique, 2013. "How to correct for long-term externalities of large-scale wind power development by a capacity mechanism?," Energy Policy, Elsevier, vol. 61(C), pages 671-685.
- de Vries, Laurens & Heijnen, Petra, 2008. "The impact of electricity market design upon investment under uncertainty: The effectiveness of capacity mechanisms," Utilities Policy, Elsevier, vol. 16(3), pages 215-227, September.
- Sebastian Schäfer & Lisa Altvater, 2019. "On the functioning of a capacity market with an increasing share of renewable energy," Journal of Regulatory Economics, Springer, vol. 56(1), pages 59-84, August.
- Dominique Finon & Fabien Roques, 2013.
"European Electricity Market Reforms: The "Visible Hand" of Public Coordination,"
Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
- Dominique Finon & Fabien Roques, 2013. "European Electricity Market Reforms: The "Visible Hand" of Public Coordination," Post-Print hal-00984254, HAL.
- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2018. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Working Paper Series in Production and Energy 27, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
- repec:dau:papers:123456789/13149 is not listed on IDEAS
- Sakellaris, Kostis, 2009. "The Greek Capacity Adequacy Mechanism: Design, Incentives, Strategic Behavior and Regulatory Remedies," MPRA Paper 24642, University Library of Munich, Germany.
- Christina Elberg, 2014. "Cross-Border Effects of Capacity Mechanisms in Electricity Markets," EWI Working Papers 2014-11, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Meyer, Roland & Gore, Olga, 2015. "Cross-border effects of capacity mechanisms: Do uncoordinated market design changes contradict the goals of the European market integration?," Energy Economics, Elsevier, vol. 51(C), pages 9-20.
- Foley, A.M. & Ó Gallachóir, B.P. & McKeogh, E.J. & Milborrow, D. & Leahy, P.G., 2013. "Addressing the technical and market challenges to high wind power integration in Ireland," Renewable and Sustainable Energy Reviews, Elsevier, vol. 19(C), pages 692-703.
- Elberg, Christina & Kranz, Sebastian, 2013.
"Capacity Mechanisms and Effects on Market Structure,"
VfS Annual Conference 2013 (Duesseldorf): Competition Policy and Regulation in a Global Economic Order
79811, Verein für Socialpolitik / German Economic Association.
- Christina Elberg & Sebastian Kranz, 2014. "Capacity Mechanisms and Effects on Market Structure," EWI Working Papers 2014-4, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- repec:bla:opecrv:v:32:y:2008:i:2:p:150-183 is not listed on IDEAS
- Simshauser, Paul & Tian, Yuan & Whish-Wilson, Patrick, 2015. "Vertical integration in energy-only electricity markets," Economic Analysis and Policy, Elsevier, vol. 48(C), pages 35-56.
- Simshauser, Paul, 2020.
"Merchant renewables and the valuation of peaking plant in energy-only markets,"
Energy Economics, Elsevier, vol. 91(C).
- Paul Simshauser, 2020. "Merchant renewables and the valuation of peaking plant in energy-only markets," Working Papers EPRG2002, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P., 2020. "Merchant renewables and the valuation of peaking plant in energy-only markets," Cambridge Working Papers in Economics 2002, Faculty of Economics, University of Cambridge.
- Roques, Fabien A., 2008.
"Market design for generation adequacy: Healing causes rather than symptoms,"
Utilities Policy, Elsevier, vol. 16(3), pages 171-183, September.
- Fabien A. Roques, 2007. "Market Design for Generation Adequacy: Healing Causes rather than Symptoms," Working Papers EPRG 0810, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Roques, F.A., 2008. "Market Design for Generation Adequacy: Healing Causes rather than Symptoms," Cambridge Working Papers in Economics 0821, Faculty of Economics, University of Cambridge.
- Bhagwat, Pradyumna C. & Richstein, Jörn C. & Chappin, Emile J.L. & Iychettira, Kaveri K. & Vries, Laurens J. De, 2017. "Cross-border effects of capacity mechanisms in interconnected power systems," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 46, pages 33-47.
- Keppler, Jan Horst, 2017.
"Rationales for capacity remuneration mechanisms: Security of supply externalities and asymmetric investment incentives,"
Energy Policy, Elsevier, vol. 105(C), pages 562-570.
- Jan Horst Keppler, 2017. "Rationales for Capacity Remuneration Mechanisms: Security of Supply Externalities and Asymmetric Investment Incentives," Post-Print hal-01609383, HAL.
- Simshauser, Paul, 2022.
"Rooftop solar PV and the peak load problem in the NEM's Queensland region,"
Energy Economics, Elsevier, vol. 109(C).
- Paul Simshauser, 2021. "Rooftop solar PV and the peak load problem in the NEM’s Queensland region," Working Papers EPRG2125, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P., 2021. "Rooftop Solar PV and the Peak Load Problem in the NEM's Queensland Region," Cambridge Working Papers in Economics 2180, Faculty of Economics, University of Cambridge.
- Weiss, Olga & Bogdanov, Dmitry & Salovaara, Kaisa & Honkapuro, Samuli, 2017. "Market designs for a 100% renewable energy system: Case isolated power system of Israel," Energy, Elsevier, vol. 119(C), pages 266-277.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-00716344. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.
Printed from https://ideas.repec.org/p/hal/journl/hal-00716344.html