IDEAS home Printed from https://ideas.repec.org/f/pdo204.html
   My authors  Follow this author

Imre Dobos

Personal Details

First Name:Imre
Middle Name:
Last Name:Dobos
Suffix:
RePEc Short-ID:pdo204
1093 Budapest Fővám tér 8. Hungary

Affiliation

Gazdálkodástudományi Kar
Budapesti Corvinus Egyetem

Budapest, Hungary
http://gazdalkodastudomany.uni-corvinus.hu/

:


RePEc:edi:gkcorhu (more details at EDIRC)

Research output

as
Jump to: Working papers Articles

Working papers

  1. Dobos, Imre & Gobsch, Barbara & Pakhomova, Nadezhda & Pishchulov, Grigory & Richter, Knut, 2011. "A vendor-purchaser economic lot size problem with remanufacturing and deposit," Discussion Papers 304, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.

Articles

  1. Dobos, Imre & Gelei, Andrea, 2016. "Bizalom az üzleti kapcsolatokban. A diadikus adatelemzés egy alkalmazása
    [Trust in business relations - an application of dyadic data analysis]
    ," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(3), pages 330-349.
  2. Andrea Gelei & Imre Dobos, 2016. "Mutual Trustworthiness as a Governance Mechanism in Business Relationships – A Dyadic Data Analysis," Acta Oeconomica, Akadémiai Kiadó, Hungary, vol. 66(4), pages 661-684, December.
  3. Dobos, Imre & Vörösmarty, Gyöngyi, 2014. "Green supplier selection and evaluation using DEA-type composite indicators," International Journal of Production Economics, Elsevier, vol. 157(C), pages 273-278.
  4. Imre Dobos & Peter Tallos, 2013. "A dynamic input-output model with renewable resources," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(2), pages 295-305, March.
  5. Imre Dobos & Barbara Gobsch & Nadezhda Pakhomova & Grigory Pishchulov & Knut Richter, 2013. "Design of contract parameters in a closed-loop supply chain," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(4), pages 713-727, December.
  6. Ábel, István & Dobos, Imre, 2011. "Bródy András gazdaságiciklus-elmélete
    [András Bródys theory of economic cycles]
    ," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(1), pages 8-19.
  7. Dobos, Imre, 2011. "The analysis of bullwhip effect in a HMMS-type supply chain," International Journal of Production Economics, Elsevier, vol. 131(1), pages 250-256, May.
  8. Kovács, Erzsébet & Dobos, Imre & Gelei, Andrea, 2010. "Üzleti kapcsolatok modellezése
    [Modelling business relations]
    ," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(7), pages 677-699.
  9. Dobos, Imre, 2009. "Dinamikus optimalizálás és a Leontief-modell
    [Dynamic optimization and the Leontief model]
    ," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(1), pages 84-92.
  10. Imre Dobos & Adél Floriska, 2008. "The efficiency of remanufacturing in a dynamic input–output model," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 16(3), pages 317-328, September.
  11. Dobos, Imre, 2007. "Tradable permits and production-inventory strategies of the firm," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 329-333, July.
  12. Dobos, Imre, 2007. "Egy megjegyzés Bródy András: Leontief zárt dinamikus modellje című dolgozathoz
    [A note on András Bródys study entitled Leontiefs closed dynamic model"]
    ," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(11), pages 1004-1011.
  13. Dobos, Imre & Floriska, Adel, 2007. "The resource conservation effect of recycling in a dynamic Leontief model," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 334-340, July.
  14. Richter, K. & Pakhomova, N.V. & Dobos, I., 2006. "A Wagner/Whitin natural resource stock control model," International Journal of Production Economics, Elsevier, vol. 104(2), pages 419-426, December.
  15. Dobos, Imre & Richter, Knut, 2006. "A production/recycling model with quality consideration," International Journal of Production Economics, Elsevier, vol. 104(2), pages 571-579, December.
  16. Dobos, Imre, 2005. "The effects of emission trading on production and inventories in the Arrow-Karlin model," International Journal of Production Economics, Elsevier, vol. 93(1), pages 301-308, January.
  17. Imre Dobos & Adel Floriska, 2005. "A Dynamic Leontief Model with Non-renewable Resources," Economic Systems Research, Taylor & Francis Journals, vol. 17(3), pages 317-326.
  18. Dobos, Imre & Richter, Knut, 2004. "An extended production/recycling model with stationary demand and return rates," International Journal of Production Economics, Elsevier, vol. 90(3), pages 311-323, August.
  19. Dobos, Imre, 2003. "Optimal production-inventory strategies for a HMMS-type reverse logistics system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 351-360, January.
  20. Dobos, Imre, 2001. "Production strategies under environmental constraints: Continuous-time model with concave costs," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 323-330, May.
  21. Dobos, Imre, 1999. "Production strategies under environmental constraints in an Arrow-Karlin model," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 337-340, March.
  22. Richter, Knut & Dobos, Imre, 1999. "Analysis of the EOQ repair and waste disposal problem with integer setup numbers," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 463-467, March.
  23. Dobos, Imre, 1998. "Production-inventory control under environmental constraints," International Journal of Production Economics, Elsevier, vol. 56(1), pages 123-131, September.
  24. Dobos, Imre, 1996. "Aggregate planning with continuous time," International Journal of Production Economics, Elsevier, vol. 43(1), pages 1-9, May.
  25. Dobos, Imre, 1991. "The Modigliani-Hohn model with capacity and warehousing constraints," International Journal of Production Economics, Elsevier, vol. 24(1-2), pages 49-54, November.

Citations

Many of the citations below have been collected in an experimental project, CitEc, where a more detailed citation analysis can be found. These are citations from works listed in RePEc that could be analyzed mechanically. So far, only a minority of all works could be analyzed. See under "Corrections" how you can help improve the citation analysis.

Working papers

  1. Dobos, Imre & Gobsch, Barbara & Pakhomova, Nadezhda & Pishchulov, Grigory & Richter, Knut, 2011. "A vendor-purchaser economic lot size problem with remanufacturing and deposit," Discussion Papers 304, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.

    Cited by:

    1. Absi, Nabil & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Penz, Bernard & Rapine, Christophe, 2016. "The single-item green lot-sizing problem with fixed carbon emissions," European Journal of Operational Research, Elsevier, vol. 248(3), pages 849-855.
    2. Imre Dobos & Barbara Gobsch & Nadezhda Pakhomova & Grigory Pishchulov & Knut Richter, 2013. "Design of contract parameters in a closed-loop supply chain," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(4), pages 713-727, December.
    3. Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2016. "A general production and recovery EOQ model with stationary demand and return rates," Discussion Papers 378, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.

Articles

  1. Dobos, Imre & Vörösmarty, Gyöngyi, 2014. "Green supplier selection and evaluation using DEA-type composite indicators," International Journal of Production Economics, Elsevier, vol. 157(C), pages 273-278.

    Cited by:

    1. Wetzstein, Anton & Hartmann, Evi & Benton jr., W.C. & Hohenstein, Nils-Ole, 2016. "A systematic assessment of supplier selection literature – State-of-the-art and future scope," International Journal of Production Economics, Elsevier, vol. 182(C), pages 304-323.
    2. Hosseini, Seyedmohsen & Barker, Kash, 2016. "A Bayesian network model for resilience-based supplier selection," International Journal of Production Economics, Elsevier, vol. 180(C), pages 68-87.
    3. Qin, Jindong & Liu, Xinwang & Pedrycz, Witold, 2017. "An extended TODIM multi-criteria group decision making method for green supplier selection in interval type-2 fuzzy environment," European Journal of Operational Research, Elsevier, vol. 258(2), pages 626-638.

  2. Imre Dobos & Peter Tallos, 2013. "A dynamic input-output model with renewable resources," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(2), pages 295-305, March.

    Cited by:

    1. George Halkos & Kyriaki Tsilika, 2016. "Dynamic Input–Output Models in Environmental Problems: A Computational Approach with CAS Software," Computational Economics, Springer;Society for Computational Economics, vol. 47(3), pages 489-497, March.
    2. Jitka Janová & David Hampel, 2016. "Optimal managing of forest structure using data simulated optimal control," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 24(2), pages 297-307, June.

  3. Imre Dobos & Barbara Gobsch & Nadezhda Pakhomova & Grigory Pishchulov & Knut Richter, 2013. "Design of contract parameters in a closed-loop supply chain," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(4), pages 713-727, December.

    Cited by:

    1. Tibor Csendes & Tibor Jordán & Tamás Szántai, 2013. "Editorial," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(4), pages 663-664, December.

  4. Dobos, Imre, 2009. "Dinamikus optimalizálás és a Leontief-modell
    [Dynamic optimization and the Leontief model]
    ," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(1), pages 84-92.

    Cited by:

    1. Bródy, András, 2010. "Fejlődés vagy növekedés?
      [Development or growth?]
      ," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(12), pages 1072-1086.

  5. Dobos, Imre, 2007. "Tradable permits and production-inventory strategies of the firm," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 329-333, July.

    Cited by:

    1. Li, Shoude & Gu, Mengdi, 2012. "The effect of emission permit trading with banking on firm's production–inventory strategies," International Journal of Production Economics, Elsevier, vol. 137(2), pages 304-308.
    2. Tang, Shaolong & Wang, Wenjie & Yan, Hong & Hao, Gang, 2015. "Low carbon logistics: Reducing shipment frequency to cut carbon emissions," International Journal of Production Economics, Elsevier, vol. 164(C), pages 339-350.
    3. Li, Shoude, 2013. "Emission permit banking, pollution abatement and production–inventory control of the firm," International Journal of Production Economics, Elsevier, vol. 146(2), pages 679-685.
    4. García-Alvarado, M.S. & Paquet, M. & Chaabane, A., 2015. "On inventory control of product recovery systems subject to environmental mechanisms," International Journal of Production Economics, Elsevier, vol. 165(C), pages 132-144.

  6. Dobos, Imre, 2007. "Egy megjegyzés Bródy András: Leontief zárt dinamikus modellje című dolgozathoz
    [A note on András Bródys study entitled Leontiefs closed dynamic model"]
    ," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(11), pages 1004-1011.

    Cited by:

    1. Dobos, Imre, 2009. "Dinamikus optimalizálás és a Leontief-modell
      [Dynamic optimization and the Leontief model]
      ," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(1), pages 84-92.
    2. Ábel, István & Dobos, Imre, 2011. "Bródy András gazdaságiciklus-elmélete
      [András Bródys theory of economic cycles]
      ," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(1), pages 8-19.

  7. Dobos, Imre & Floriska, Adel, 2007. "The resource conservation effect of recycling in a dynamic Leontief model," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 334-340, July.

    Cited by:

    1. Baghersad, Milad & Zobel, Christopher W., 2015. "Economic impact of production bottlenecks caused by disasters impacting interdependent industry sectors," International Journal of Production Economics, Elsevier, vol. 168(C), pages 71-80.
    2. Subramanian, Nachiappan & Gunasekaran, Angappa, 2015. "Cleaner supply-chain management practices for twenty-first-century organizational competitiveness: Practice-performance framework and research propositions," International Journal of Production Economics, Elsevier, vol. 164(C), pages 216-233.
    3. Gimenez, Cristina & Sierra, Vicenta & Rodon, Juan, 2012. "Sustainable operations: Their impact on the triple bottom line," International Journal of Production Economics, Elsevier, vol. 140(1), pages 149-159.
    4. Imre Dobos & Peter Tallos, 2013. "A dynamic input-output model with renewable resources," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(2), pages 295-305, March.
    5. Cruz Jr., Jose B. & Tan, Raymond R. & Culaba, Alvin B. & Ballacillo, Jo-Anne, 2009. "A dynamic input-output model for nascent bioenergy supply chains," Applied Energy, Elsevier, pages 86-94.
    6. Yazan, Devrim Murat & Claudio Garavelli, A. & Messeni Petruzzelli, Antonio & Albino, Vito, 2011. "The effect of spatial variables on the economic and environmental performance of bioenergy production chains," International Journal of Production Economics, Elsevier, vol. 131(1), pages 224-233, May.

  8. Dobos, Imre & Richter, Knut, 2006. "A production/recycling model with quality consideration," International Journal of Production Economics, Elsevier, vol. 104(2), pages 571-579, December.

    Cited by:

    1. Jaber, Mohamad Y. & Rosen, Marc A., 2008. "The economic order quantity repair and waste disposal model with entropy cost," European Journal of Operational Research, Elsevier, vol. 188(1), pages 109-120, July.
    2. Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2015. "Complete solution of the extended EOQ repair and waste disposal model with switching costs," Discussion Papers 376, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
    3. El Saadany, Ahmed M.A. & Jaber, Mohamad Y. & Bonney, Maurice, 2013. "How many times to remanufacture?," International Journal of Production Economics, Elsevier, vol. 143(2), pages 598-604.
    4. Niknejad, A. & Petrovic, D., 2014. "Optimisation of integrated reverse logistics networks with different product recovery routes," European Journal of Operational Research, Elsevier, vol. 238(1), pages 143-154.
    5. Kovačić, Danijel & Usenik, Janez & Bogataj, Marija, 2017. "Optimal decisions on investments in Urban Energy Cogeneration plants – Extended MRP and fuzzy approach to the stochastic systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 583-595.
    6. Chen, Jen-Ming & Chang, Chia-I, 2012. "The co-opetitive strategy of a closed-loop supply chain with remanufacturing," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(2), pages 387-400.
    7. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
    8. Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2016. "A general production and recovery EOQ model with stationary demand and return rates," Discussion Papers 378, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.

  9. Dobos, Imre, 2005. "The effects of emission trading on production and inventories in the Arrow-Karlin model," International Journal of Production Economics, Elsevier, vol. 93(1), pages 301-308, January.

    Cited by:

    1. Xu, Xiaoping & Zhang, Wei & He, Ping & Xu, Xiaoyan, 2017. "Production and pricing problems in make-to-order supply chain with cap-and-trade regulation," Omega, Elsevier, vol. 66(PB), pages 248-257.
    2. Xiutian Shi & Yuan Qian & Ciwei Dong, 2017. "Economic and Environmental Performance of Fashion Supply Chain: The Joint Effect of Power Structure and Sustainable Investment," Sustainability, MDPI, Open Access Journal, vol. 9(6), pages 1-22, June.
    3. Li, Shoude & Gu, Mengdi, 2012. "The effect of emission permit trading with banking on firm's production–inventory strategies," International Journal of Production Economics, Elsevier, vol. 137(2), pages 304-308.
    4. Dobos, Imre, 2007. "Tradable permits and production-inventory strategies of the firm," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 329-333, July.
    5. Li, Shoude, 2013. "Emission permit banking, pollution abatement and production–inventory control of the firm," International Journal of Production Economics, Elsevier, vol. 146(2), pages 679-685.
    6. García-Alvarado, M.S. & Paquet, M. & Chaabane, A., 2015. "On inventory control of product recovery systems subject to environmental mechanisms," International Journal of Production Economics, Elsevier, vol. 165(C), pages 132-144.
    7. Rentizelas, Athanasios A. & Tolis, Athanasios I. & Tatsiopoulos, Ilias P., 2012. "Investment planning in electricity production under CO2 price uncertainty," International Journal of Production Economics, Elsevier, vol. 140(2), pages 622-629.

  10. Imre Dobos & Adel Floriska, 2005. "A Dynamic Leontief Model with Non-renewable Resources," Economic Systems Research, Taylor & Francis Journals, vol. 17(3), pages 317-326.

    Cited by:

    1. George Halkos & Kyriaki Tsilika, 2016. "Dynamic Input–Output Models in Environmental Problems: A Computational Approach with CAS Software," Computational Economics, Springer;Society for Computational Economics, vol. 47(3), pages 489-497, March.
    2. Imre Dobos & Peter Tallos, 2013. "A dynamic input-output model with renewable resources," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(2), pages 295-305, March.
    3. Jitka Janová & David Hampel, 2016. "Optimal managing of forest structure using data simulated optimal control," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 24(2), pages 297-307, June.
    4. Dobos, Imre & Floriska, Adel, 2007. "The resource conservation effect of recycling in a dynamic Leontief model," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 334-340, July.

  11. Dobos, Imre & Richter, Knut, 2004. "An extended production/recycling model with stationary demand and return rates," International Journal of Production Economics, Elsevier, vol. 90(3), pages 311-323, August.

    Cited by:

    1. Jaber, Mohamad Y. & Rosen, Marc A., 2008. "The economic order quantity repair and waste disposal model with entropy cost," European Journal of Operational Research, Elsevier, vol. 188(1), pages 109-120, July.
    2. Konstantaras, I. & Skouri, K., 2010. "Lot sizing for a single product recovery system with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 203(2), pages 326-335, June.
    3. Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2015. "Complete solution of the extended EOQ repair and waste disposal model with switching costs," Discussion Papers 376, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
    4. Tahirov, Nail & Hasanov, Parviz & Jaber, Mohamad Y., 2016. "Optimization of closed-loop supply chain of multi-items with returned subassemblies," International Journal of Production Economics, Elsevier, vol. 174(C), pages 1-10.
    5. El Saadany, Ahmed M.A. & Jaber, Mohamad Y. & Bonney, Maurice, 2013. "How many times to remanufacture?," International Journal of Production Economics, Elsevier, vol. 143(2), pages 598-604.
    6. Govindan, Kannan & Popiuc, Maria Nicoleta, 2014. "Reverse supply chain coordination by revenue sharing contract: A case for the personal computers industry," European Journal of Operational Research, Elsevier, vol. 233(2), pages 326-336.
    7. Pati, Rupesh Kumar & Vrat, Prem & Kumar, Pradeep, 2006. "Economic analysis of paper recycling vis-a-vis wood as raw material," International Journal of Production Economics, Elsevier, vol. 103(2), pages 489-508, October.
    8. Melis Teksan, Z. & Geunes, Joseph, 2016. "An EOQ model with price-dependent supply and demand," International Journal of Production Economics, Elsevier, vol. 178(C), pages 22-33.
    9. Kovačić, Danijel & Usenik, Janez & Bogataj, Marija, 2017. "Optimal decisions on investments in Urban Energy Cogeneration plants – Extended MRP and fuzzy approach to the stochastic systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 583-595.
    10. Widyadana, Gede Agus & Wee, Hui Ming, 2012. "An economic production quantity model for deteriorating items with multiple production setups and rework," International Journal of Production Economics, Elsevier, vol. 138(1), pages 62-67.
    11. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
    12. El Saadany, Ahmed M.A. & Jaber, Mohamad Y., 2011. "A production/remanufacture model with returns' subassemblies managed differently," International Journal of Production Economics, Elsevier, vol. 133(1), pages 119-126, September.
    13. Wei, Cansheng & Li, Yongjian & Cai, Xiaoqiang, 2011. "Robust optimal policies of production and inventory with uncertain returns and demand," International Journal of Production Economics, Elsevier, vol. 134(2), pages 357-367, December.
    14. Omar, Mohd & Yeo, Ivan, 2009. "A model for a production-repair system under a time-varying demand process," International Journal of Production Economics, Elsevier, vol. 119(1), pages 17-23, May.
    15. Omar, Mohd & Yeo, Ivan, 2014. "A production–repair inventory model with time-varying demand and multiple setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 398-405.
    16. Zhichao Zhang & Qing Zhang & Zhi Liu & Xiaoxue Zheng, 2018. "Static and Dynamic Pricing Strategies in a Closed-Loop Supply Chain with Reference Quality Effects," Sustainability, MDPI, Open Access Journal, vol. 10(1), pages 1-31, January.
    17. Feng, Yan & Viswanathan, S., 2011. "A new lot-sizing heuristic for manufacturing systems with product recovery," International Journal of Production Economics, Elsevier, vol. 133(1), pages 432-438, September.
    18. Lu, Liang & Qi, Xiangtong & Liu, Zhixin, 2014. "On the cooperation of recycling operations," European Journal of Operational Research, Elsevier, vol. 233(2), pages 349-358.
    19. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
    20. Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2016. "A general production and recovery EOQ model with stationary demand and return rates," Discussion Papers 378, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
    21. Choi, Dae-Won & Hwang, Hark & Koh, Shie-Gheun, 2007. "A generalized ordering and recovery policy for reusable items," European Journal of Operational Research, Elsevier, vol. 182(2), pages 764-774, October.
    22. Dobos, Imre & Richter, Knut, 2006. "A production/recycling model with quality consideration," International Journal of Production Economics, Elsevier, vol. 104(2), pages 571-579, December.
    23. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2011. "An economic production and remanufacturing model with learning effects," International Journal of Production Economics, Elsevier, vol. 131(1), pages 115-127, May.

  12. Dobos, Imre, 2003. "Optimal production-inventory strategies for a HMMS-type reverse logistics system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 351-360, January.

    Cited by:

    1. Dobos, Imre, 2011. "The analysis of bullwhip effect in a HMMS-type supply chain," International Journal of Production Economics, Elsevier, vol. 131(1), pages 250-256, May.
    2. Hsueh, Che-Fu, 2011. "An inventory control model with consideration of remanufacturing and product life cycle," International Journal of Production Economics, Elsevier, vol. 133(2), pages 645-652, October.
    3. De Giovanni, Pietro & Reddy, Puduru V. & Zaccour, Georges, 2016. "Incentive strategies for an optimal recovery program in a closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 249(2), pages 605-617.
    4. Wang, Wenyuan & Wang, Yue & Mo, Daniel & Tseng, Mitchell M., 2017. "Managing component reuse in remanufacturing under product diffusion dynamics," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 551-560.
    5. Wilcox, William & Horvath, Philip A. & Griffis, Stanley E. & Autry, Chad W., 2011. "A Markov model of liquidity effects in reverse logistics processes: The effects of random volume and passage," International Journal of Production Economics, Elsevier, vol. 129(1), pages 86-101, January.
    6. Wang, Reay-Chen & Liang, Tien-Fu, 2005. "Applying possibilistic linear programming to aggregate production planning," International Journal of Production Economics, Elsevier, vol. 98(3), pages 328-341, December.
    7. Chen, Chialin & Liu, Lucy Qian, 2014. "Pricing and quality decisions and financial incentives for sustainable product design with recycled material content under price leadership," International Journal of Production Economics, Elsevier, vol. 147(PC), pages 666-677.
    8. Kenné, Jean-Pierre & Dejax, Pierre & Gharbi, Ali, 2012. "Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 135(1), pages 81-93.
    9. García-Rodríguez, Francisco J. & Castilla-Gutiérrez, Carlos & Bustos-Flores, Carlos, 2013. "Implementation of reverse logistics as a sustainable tool for raw material purchasing in developing countries: The case of Venezuela," International Journal of Production Economics, Elsevier, vol. 141(2), pages 582-592.
    10. Polotski, Vladimir & Kenne, Jean-Pierre & Gharbi, Ali, 2017. "Production and setup policy optimization for hybrid manufacturing–remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 322-333.
    11. Dobos, Imre & Richter, Knut, 2004. "An extended production/recycling model with stationary demand and return rates," International Journal of Production Economics, Elsevier, vol. 90(3), pages 311-323, August.

  13. Dobos, Imre, 2001. "Production strategies under environmental constraints: Continuous-time model with concave costs," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 323-330, May.

    Cited by:

    1. Miemczyk, Joe, 2008. "An exploration of institutional constraints on developing end-of-life product recovery capabilities," International Journal of Production Economics, Elsevier, vol. 115(2), pages 272-282, October.
    2. Joe Miemczyk, 2008. "An exploration of institutional constraints on developing end-of-life product recovery capabilities," Post-Print hal-00765366, HAL.

  14. Dobos, Imre, 1999. "Production strategies under environmental constraints in an Arrow-Karlin model," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 337-340, March.

    Cited by:

    1. Dobos, Imre, 2001. "Production strategies under environmental constraints: Continuous-time model with concave costs," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 323-330, May.
    2. Li, Shoude & Gu, Mengdi, 2012. "The effect of emission permit trading with banking on firm's production–inventory strategies," International Journal of Production Economics, Elsevier, vol. 137(2), pages 304-308.
    3. Dobos, Imre, 2007. "Tradable permits and production-inventory strategies of the firm," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 329-333, July.
    4. Dobos, Imre, 2005. "The effects of emission trading on production and inventories in the Arrow-Karlin model," International Journal of Production Economics, Elsevier, vol. 93(1), pages 301-308, January.

  15. Richter, Knut & Dobos, Imre, 1999. "Analysis of the EOQ repair and waste disposal problem with integer setup numbers," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 463-467, March.

    Cited by:

    1. Bayindir, Z. Pelin & Erkip, Nesim & Gullu, Refik, 2003. "A model to evaluate inventory costs in a remanufacturing environment," International Journal of Production Economics, Elsevier, vol. 81(1), pages 597-607, January.
    2. Konstantaras, I. & Papachristos, S., 2007. "Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options," European Journal of Operational Research, Elsevier, vol. 178(2), pages 433-448, April.
    3. Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2015. "Complete solution of the extended EOQ repair and waste disposal model with switching costs," Discussion Papers 376, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
    4. Byung Duk Song & Young Dae Ko, 2017. "Effect of Inspection Policies and Residual Value of Collected Used Products: A Mathematical Model and Genetic Algorithm for a Closed-Loop Green Manufacturing System," Sustainability, MDPI, Open Access Journal, vol. 9(9), pages 1-14, September.
    5. van der Laan, Erwin, 2003. "An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing," International Journal of Production Economics, Elsevier, vol. 81(1), pages 317-331, January.
    6. Melis Teksan, Z. & Geunes, Joseph, 2016. "An EOQ model with price-dependent supply and demand," International Journal of Production Economics, Elsevier, vol. 178(C), pages 22-33.
    7. Kovačić, Danijel & Usenik, Janez & Bogataj, Marija, 2017. "Optimal decisions on investments in Urban Energy Cogeneration plants – Extended MRP and fuzzy approach to the stochastic systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 583-595.
    8. Dobos, Imre & Gobsch, Barbara & Pakhomova, Nadezhda & Pishchulov, Grigory & Richter, Knut, 2011. "A vendor-purchaser economic lot size problem with remanufacturing and deposit," Discussion Papers 304, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
    9. Miemczyk, Joe, 2008. "An exploration of institutional constraints on developing end-of-life product recovery capabilities," International Journal of Production Economics, Elsevier, vol. 115(2), pages 272-282, October.
    10. Omar, Mohd & Yeo, Ivan, 2009. "A model for a production-repair system under a time-varying demand process," International Journal of Production Economics, Elsevier, vol. 119(1), pages 17-23, May.
    11. Omar, Mohd & Yeo, Ivan, 2014. "A production–repair inventory model with time-varying demand and multiple setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 398-405.
    12. Z P Bayındır & N Erkip & R Güllü, 2005. "Assessing the benefits of remanufacturing option under one-way substitution," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, pages 286-296.
    13. Feng, Yan & Viswanathan, S., 2011. "A new lot-sizing heuristic for manufacturing systems with product recovery," International Journal of Production Economics, Elsevier, vol. 133(1), pages 432-438, September.
    14. Joe Miemczyk, 2008. "An exploration of institutional constraints on developing end-of-life product recovery capabilities," Post-Print hal-00765366, HAL.
    15. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
    16. Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2016. "A general production and recovery EOQ model with stationary demand and return rates," Discussion Papers 378, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
    17. Dobos, Imre & Richter, Knut, 2004. "An extended production/recycling model with stationary demand and return rates," International Journal of Production Economics, Elsevier, vol. 90(3), pages 311-323, August.

  16. Dobos, Imre, 1998. "Production-inventory control under environmental constraints," International Journal of Production Economics, Elsevier, vol. 56(1), pages 123-131, September.

    Cited by:

    1. Dobos, Imre, 2011. "The analysis of bullwhip effect in a HMMS-type supply chain," International Journal of Production Economics, Elsevier, vol. 131(1), pages 250-256, May.
    2. Dobos, Imre, 2001. "Production strategies under environmental constraints: Continuous-time model with concave costs," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 323-330, May.
    3. Li, Shoude & Gu, Mengdi, 2012. "The effect of emission permit trading with banking on firm's production–inventory strategies," International Journal of Production Economics, Elsevier, vol. 137(2), pages 304-308.
    4. Dobos, Imre, 2007. "Tradable permits and production-inventory strategies of the firm," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 329-333, July.

  17. Dobos, Imre, 1996. "Aggregate planning with continuous time," International Journal of Production Economics, Elsevier, vol. 43(1), pages 1-9, May.

    Cited by:

    1. Gansterer, Margaretha, 2015. "Aggregate planning and forecasting in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 521-528.
    2. Molinder, Anders, 1995. "Application of calculus of variations to a continuous time aggregate production model," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 273-280, October.

  18. Dobos, Imre, 1991. "The Modigliani-Hohn model with capacity and warehousing constraints," International Journal of Production Economics, Elsevier, vol. 24(1-2), pages 49-54, November.

    Cited by:

    1. Dobos, Imre, 2007. "Tradable permits and production-inventory strategies of the firm," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 329-333, July.

More information

Research fields, statistics, top rankings, if available.

Statistics

Access and download statistics for all items

Co-authorship network on CollEc

NEP Fields

NEP is an announcement service for new working papers, with a weekly report in each of many fields. This author has had 1 paper announced in NEP. These are the fields, ordered by number of announcements, along with their dates. If the author is listed in the directory of specialists for this field, a link is also provided.
  1. No paper was announced in a field specific NEP report

Corrections

All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. For general information on how to correct material on RePEc, see these instructions.

To update listings or check citations waiting for approval, Imre Dobos should log into the RePEc Author Service.

To make corrections to the bibliographic information of a particular item, find the technical contact on the abstract page of that item. There, details are also given on how to add or correct references and citations.

To link different versions of the same work, where versions have a different title, use this form. Note that if the versions have a very similar title and are in the author's profile, the links will usually be created automatically.

Please note that most corrections can take a couple of weeks to filter through the various RePEc services.

IDEAS is a RePEc service hosted by the Research Division of the Federal Reserve Bank of St. Louis . RePEc uses bibliographic data supplied by the respective publishers.