IDEAS home Printed from https://ideas.repec.org/e/pah165.html
   My authors  Follow this author

Dominic D. Ahiaga-Dagbui

Personal Details

First Name:Dominic
Middle Name:D.
Last Name:Ahiaga-Dagbui
Suffix:
RePEc Short-ID:pah165
[This author has chosen not to make the email address public]

Affiliation

Aberdeen Business School
Robert Gordon University

Aberdeen, United Kingdom
http://www.rgu.ac.uk/abs/
RePEc:edi:bsrguuk (more details at EDIRC)

Research output

as
Jump to: Articles

Articles

  1. Love, Peter E.D. & Ika, Lavagnon A. & Ahiaga-Dagbui, Dominic D., 2019. "On de-bunking ‘fake news’ in a post truth era: Why does the Planning Fallacy explanation for cost overruns fall short?," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 397-408.
  2. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
  3. Love, Peter E.D. & Ahiaga-Dagbui, Dominic & Welde, Morten & Odeck, James, 2017. "Light rail transit cost performance: Opportunities for future-proofing," Transportation Research Part A: Policy and Practice, Elsevier, vol. 100(C), pages 27-39.
  4. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D. & Irani, Zahir, 2016. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 184-194.
  5. Dominic D. Ahiaga-Dagbui & Simon D. Smith, 2014. "Dealing with construction cost overruns using data mining," Construction Management and Economics, Taylor & Francis Journals, vol. 32(7-8), pages 682-694, August.

Citations

Many of the citations below have been collected in an experimental project, CitEc, where a more detailed citation analysis can be found. These are citations from works listed in RePEc that could be analyzed mechanically. So far, only a minority of all works could be analyzed. See under "Corrections" how you can help improve the citation analysis.

Articles

  1. Love, Peter E.D. & Ika, Lavagnon A. & Ahiaga-Dagbui, Dominic D., 2019. "On de-bunking ‘fake news’ in a post truth era: Why does the Planning Fallacy explanation for cost overruns fall short?," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 397-408.

    Cited by:

    1. Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Molin, Eric & Rønnest, Arne & Stewa, 2019. "On de-bunking “Fake News” in the post-truth era: How to reduce statistical error in research," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 409-411.

  2. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.

    Cited by:

    1. Bartlomiej Rokicki, 2022. "Cost Underruns in Major Road Transport Infrastructure Projects—The Surprising Experience of Poland," Sustainability, MDPI, vol. 14(21), pages 1-18, November.
    2. Love, Peter E.D. & Sing, Michael C.P. & Ika, Lavagnon A. & Newton, Sidney, 2019. "The cost performance of transportation projects: The fallacy of the Planning Fallacy account," Transportation Research Part A: Policy and Practice, Elsevier, vol. 122(C), pages 1-20.
    3. Chapman, Paul & Quang, Cuong, 2021. "Major Project Risk Management: Reconciling Complexity during Delivery with the Inside View in Planning," SocArXiv j9sw8, Center for Open Science.
    4. Bartlomiej Rokicki & Krzysztof Ostaszewski, 2022. "Actuarial Credibility Approach in Adjusting Initial Cost Estimates of Transport Infrastructure Projects," Sustainability, MDPI, vol. 14(20), pages 1-12, October.
    5. Alan Walsh & Peter Walker, 2021. "Re-Evaluating Megaproject Cost Overruns: Putting Changes Into Perspective," International Journal of Innovation and Economic Development, Inovatus Services Ltd., vol. 6(6), pages 19-29, February.
    6. Delei Yang & Jun Zhu & Qingbin Cui & Qinghua He & Xian Zheng, 2021. "The Diffusion Mechanism of Megaproject Citizenship Behavior: The Role of Institutional Isomorphism," Sustainability, MDPI, vol. 13(15), pages 1-19, July.
    7. Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Molin, Eric & Rønnest, Arne & Stewa, 2019. "On de-bunking “Fake News” in the post-truth era: How to reduce statistical error in research," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 409-411.
    8. Love, Peter E.D. & Ika, Lavagnon A. & Ahiaga-Dagbui, Dominic D., 2019. "On de-bunking ‘fake news’ in a post truth era: Why does the Planning Fallacy explanation for cost overruns fall short?," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 397-408.
    9. Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Lunn, Daniel & Molin, Eric & Rønnes, 2018. "Five things you should know about cost overrun," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 174-190.
    10. Love, Peter E.D. & Ika, Lavagnon & Matthews, Jane & Fang, Weili, 2021. "Shared leadership, value and risks in large scale transport projects: Re-calibrating procurement policy for post COVID-19," Research in Transportation Economics, Elsevier, vol. 90(C).
    11. Tobias Onshuus Malvik & Agnar Johansen & Olav Torp & Nils O. E. Olsson, 2021. "Evaluation of Target Value Delivery and Opportunity Management as Complementary Practices," Sustainability, MDPI, vol. 13(14), pages 1-19, July.
    12. Andrius Montrimas & Jurgita Bruneckienė & Vaidas Gaidelys, 2021. "Beyond the Socio-Economic Impact of Transport Megaprojects," Sustainability, MDPI, vol. 13(15), pages 1-29, July.
    13. Love, Peter E.D. & Ika, Lavagnon A., 2021. "The ‘context’ of transport project cost performance: Insights from contract award to final construction costs," Research in Transportation Economics, Elsevier, vol. 90(C).

  3. Love, Peter E.D. & Ahiaga-Dagbui, Dominic & Welde, Morten & Odeck, James, 2017. "Light rail transit cost performance: Opportunities for future-proofing," Transportation Research Part A: Policy and Practice, Elsevier, vol. 100(C), pages 27-39.

    Cited by:

    1. Li, Xinjian & Love, Peter E.D. & Luo, Hanbin & Fang, Weili, 2022. "A systemic model for implementing land value capture to support urban rail transit infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 156(C), pages 90-112.
    2. Christiono Utomo & Sulfiah Dwi Astarini & Dewa Made Satriya Wibawa Mertha & Yani Rahmawati & Aqsha & Cahyono Bintang Nurcahyo & Maulita Nahdiyah, 2022. "Decision Factors of Stakeholder Integration in Connected Construction for Circular Economics," Sustainability, MDPI, vol. 14(23), pages 1-18, December.
    3. Savindi Caldera & Sherif Mostafa & Cheryl Desha & Sherif Mohamed, 2021. "Exploring the Role of Digital Infrastructure Asset Management Tools for Resilient Linear Infrastructure Outcomes in Cities and Towns: A Systematic Literature Review," Sustainability, MDPI, vol. 13(21), pages 1-25, October.
    4. Zhao, Jianfeng & Liu, Henry J. & Love, Peter E.D. & Greenwood, David J. & Sing, Michael C.P., 2022. "Public-private partnerships: A dynamic discrete choice model for road projects," Socio-Economic Planning Sciences, Elsevier, vol. 82(PA).
    5. Love, Peter E.D. & Ika, Lavagnon A. & Matthews, Jane & Li, Xinjian & Fang, Weili, 2021. "A procurement policy-making pathway to future-proof large-scale transport infrastructure assets," Research in Transportation Economics, Elsevier, vol. 90(C).

  4. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D. & Irani, Zahir, 2016. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 184-194.

    Cited by:

    1. Bartlomiej Rokicki, 2022. "Cost Underruns in Major Road Transport Infrastructure Projects—The Surprising Experience of Poland," Sustainability, MDPI, vol. 14(21), pages 1-18, November.
    2. Love, Peter E.D. & Sing, Michael C.P. & Ika, Lavagnon A. & Newton, Sidney, 2019. "The cost performance of transportation projects: The fallacy of the Planning Fallacy account," Transportation Research Part A: Policy and Practice, Elsevier, vol. 122(C), pages 1-20.
    3. Chapman, Paul & Quang, Cuong, 2021. "Major Project Risk Management: Reconciling Complexity during Delivery with the Inside View in Planning," SocArXiv j9sw8, Center for Open Science.
    4. Munday, Max & Reynolds, Laura & Roberts, Annette, 2023. "Re-appraising ‘in-process’ benefits of strategic infrastructure improvements: Capturing the unexpected socio-economic impacts for lagging regions," Transport Policy, Elsevier, vol. 134(C), pages 119-127.
    5. Temitope Seun Omotayo & Bankole Awuzie & Valerie Kenechukwu Obi & Saheed Ajayi & Lovelin Ifeoma Obi & Oluyomi Osobajo & Adekunle Oke, 2022. "The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a COVID-19 Epidemic Era," SAGE Open, , vol. 12(2), pages 21582440221, May.
    6. Love, Peter E.D. & Ahiaga-Dagbui, Dominic & Welde, Morten & Odeck, James, 2017. "Light rail transit cost performance: Opportunities for future-proofing," Transportation Research Part A: Policy and Practice, Elsevier, vol. 100(C), pages 27-39.
    7. Giorgio Locatelli, 2018. "Why are Megaprojects, Including Nuclear Power Plants, Delivered Overbudget and Late? Reasons and Remedies," Papers 1802.07312, arXiv.org.
    8. Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
    9. Schubert, Daniel & Sys, Christa & Vanelslander, Thierry & Roumboutsos, Athena, 2022. "No-queue road pricing: A comprehensive policy instrument for Europe?," Utilities Policy, Elsevier, vol. 78(C).
    10. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
    11. James Odeck, 2019. "Variation in cost overruns of transportation projects: an econometric meta-regression analysis of studies reported in the literature," Transportation, Springer, vol. 46(4), pages 1345-1368, August.
    12. Maryam Hussain Abal-Seqan & Shaligram Pokharel & Khalid Kamal Naji, 2023. "Key Success Factors and Their Impact on the Performance of Construction Projects: Case in Qatar," Sustainability, MDPI, vol. 15(4), pages 1-20, February.
    13. Love, Peter E.D. & Zhou, Jingyang & Edwards, David J. & Irani, Zahir & Sing, Chun-Pong, 2017. "Off the rails: The cost performance of infrastructure rail projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 99(C), pages 14-29.
    14. Dawei Chen & Fangxu Mo & Ye Chen & Jun Zhang & Xinyu You, 2022. "Optimization of Ramp Locations along Freeways: A Dynamic Programming Approach," Sustainability, MDPI, vol. 14(15), pages 1-13, August.
    15. Love, Peter E.D. & Ika, Lavagnon A., 2021. "The ‘context’ of transport project cost performance: Insights from contract award to final construction costs," Research in Transportation Economics, Elsevier, vol. 90(C).

  5. Dominic D. Ahiaga-Dagbui & Simon D. Smith, 2014. "Dealing with construction cost overruns using data mining," Construction Management and Economics, Taylor & Francis Journals, vol. 32(7-8), pages 682-694, August.

    Cited by:

    1. Mahir Msawil & Faris Elghaish & Krisanthi Seneviratne & Stephen McIlwaine, 2021. "Developing a Parametric Cash Flow Forecasting Model for Complex Infrastructure Projects: A Comparative Study," Sustainability, MDPI, vol. 13(20), pages 1-26, October.
    2. YeEun Jang & JeongWook Son & June-Seong Yi, 2021. "Classifying the Level of Bid Price Volatility Based on Machine Learning with Parameters from Bid Documents as Risk Factors," Sustainability, MDPI, vol. 13(7), pages 1-18, April.
    3. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D. & Irani, Zahir, 2016. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 184-194.
    4. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
    5. Jeng-Wen Lin & Pu Fun Shen & Bing-Jean Lee, 2015. "Repetitive Model Refinement for Questionnaire Design Improvement in the Evaluation of Working Characteristics in Construction Enterprises," Sustainability, MDPI, vol. 7(11), pages 1-15, November.
    6. Edyta Plebankiewicz, 2018. "Model of Predicting Cost Overrun in Construction Projects," Sustainability, MDPI, vol. 10(12), pages 1-14, November.

More information

Research fields, statistics, top rankings, if available.

Statistics

Access and download statistics for all items

Corrections

All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. For general information on how to correct material on RePEc, see these instructions.

To update listings or check citations waiting for approval, Dominic D. Ahiaga-Dagbui should log into the RePEc Author Service.

To make corrections to the bibliographic information of a particular item, find the technical contact on the abstract page of that item. There, details are also given on how to add or correct references and citations.

To link different versions of the same work, where versions have a different title, use this form. Note that if the versions have a very similar title and are in the author's profile, the links will usually be created automatically.

Please note that most corrections can take a couple of weeks to filter through the various RePEc services.

IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.