IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v10y2018i12p4387-d185187.html
   My bibliography  Save this article

Model of Predicting Cost Overrun in Construction Projects

Author

Listed:
  • Edyta Plebankiewicz

    (Institute of Construction Management Cracow University of Technology, Warszawska 24, 31-155 Kraków, Poland)

Abstract

During the construction phase, significant differences between the planned and actual costs of construction projects frequently occur. The paper describes the concept of a model of prediction of the increase in the costs of construction works in relation to those planned. The assumption of the model is to determine the probability of the cost increase for the elements of the object for which it is the largest. A fuzzy Mamdani inference method was proposed for the selection of the elements to be evaluated. In the cost prediction model, fuzzy relations and the compound max-min relations were used. The result of the model are the probabilities of cost overrun for works most exposed to changes in costs. The model can be helpful mainly for the contractor who wants to know not only the probability of the total cost overrun but also the possibility and amount of increase in the costs of individual packages of works or detailed construction works necessary to complete a construction project. Such an approach may help to properly plan expenses related to the implementation and schedule of works along with the cash flow for the project.

Suggested Citation

  • Edyta Plebankiewicz, 2018. "Model of Predicting Cost Overrun in Construction Projects," Sustainability, MDPI, vol. 10(12), pages 1-14, November.
  • Handle: RePEc:gam:jsusta:v:10:y:2018:i:12:p:4387-:d:185187
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/10/12/4387/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/10/12/4387/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Skamris, Mette K. & Flyvbjerg, Bent, 1997. "Inaccuracy of traffic forecasts and cost estimates on large transport projects," Transport Policy, Elsevier, vol. 4(3), pages 141-146, July.
    2. Hans Lind & Fredrik Brunes, 2015. "Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden," Construction Management and Economics, Taylor & Francis Journals, vol. 33(7), pages 554-568, July.
    3. Odeck, James, 2004. "Cost overruns in road construction--what are their sizes and determinants?," Transport Policy, Elsevier, vol. 11(1), pages 43-53, January.
    4. Cantarelli, C.C. & Molin, E.J.E. & van Wee, B. & Flyvbjerg, B., 2012. "Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases," Transport Policy, Elsevier, vol. 22(C), pages 49-56.
    5. Dominic D. Ahiaga-Dagbui & Simon D. Smith, 2014. "Dealing with construction cost overruns using data mining," Construction Management and Economics, Taylor & Francis Journals, vol. 32(7-8), pages 682-694, August.
    6. P. A. Koushki & K. Al-Rashid & N. Kartam, 2005. "Delays and cost increases in the construction of private residential projects in Kuwait," Construction Management and Economics, Taylor & Francis Journals, vol. 23(3), pages 285-294.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. LaPatin, Michaela & Spearing, Lauryn A. & Tiedmann, Helena R. & Hacker, Miriam & Kavvada, Olga & Daniélou, Jean & Faust, Kasey M., 2023. "Controversy in wind energy construction projects: How social systems impact project performance," Energy Policy, Elsevier, vol. 176(C).
    2. Qingpeng Cao & Moses Olabhele Esangbedo & Sijun Bai & Caroline Olufunke Esangbedo, 2019. "Grey SWARA-FUCOM Weighting Method for Contractor Selection MCDM Problem: A Case Study of Floating Solar Panel Energy System Installation," Energies, MDPI, vol. 12(13), pages 1-30, June.
    3. Xuefeng Zhao & Haodong Chen & Jing Liu & Jiaqi Liu & Meng Zhang & Yibing Tao & Junbo Li & Xuyang Wang, 2023. "Research on Full-Element and Multi-Time-Scale Modeling Method of BIM for Lean Construction," Sustainability, MDPI, vol. 15(17), pages 1-17, August.
    4. Edyta Plebankiewicz & Damian Wieczorek, 2020. "Prediction of Cost Overrun Risk in Construction Projects," Sustainability, MDPI, vol. 12(22), pages 1-15, November.
    5. Fengchang Jiang & John Awaitey & Haiyan Xie, 2022. "Analysis of Construction Cost and Investment Planning Using Time Series Data," Sustainability, MDPI, vol. 14(3), pages 1-16, February.
    6. Jarosław Górecki & Manuel Díaz-Madroñero, 2020. "Who Risks and Wins?—Simulated Cost Variance in Sustainable Construction Projects," Sustainability, MDPI, vol. 12(8), pages 1-31, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Edyta Plebankiewicz & Damian Wieczorek, 2020. "Prediction of Cost Overrun Risk in Construction Projects," Sustainability, MDPI, vol. 12(22), pages 1-15, November.
    2. Verweij, Stefan & van Meerkerk, Ingmar & Korthagen, Iris A., 2015. "Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration," Transport Policy, Elsevier, vol. 37(C), pages 195-202.
    3. Chong, Uven & Hopkins, Omar, 2016. "An international experience on the evolution of road costs during the project life cycle," Transport Policy, Elsevier, vol. 48(C), pages 60-66.
    4. Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
    5. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D. & Irani, Zahir, 2016. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 184-194.
    6. Catalão, Francisco Pinheiro & Cruz, Carlos Oliveira & Sarmento, Joaquim Miranda, 2019. "The determinants of cost deviations and overruns in transport projects, an endogenous models approach," Transport Policy, Elsevier, vol. 74(C), pages 224-238.
    7. Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 2020. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(6), pages 1250-1259, December.
    8. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
    9. Miranda Sarmento, J.J., 2014. "Public private partnerships," Other publications TiSEM c7d4c978-234c-4f88-83ed-1, Tilburg University, School of Economics and Management.
    10. Odeck, James, 2014. "Do reforms reduce the magnitudes of cost overruns in road projects? Statistical evidence from Norway," Transportation Research Part A: Policy and Practice, Elsevier, vol. 65(C), pages 68-79.
    11. Adriana Gómez-Cabrera & Amalia Sanz-Benlloch & Laura Montalban-Domingo & Jose Luis Ponz-Tienda & Eugenio Pellicer, 2020. "Identification of Factors Affecting the Performance of Rural Road Projects in Colombia," Sustainability, MDPI, vol. 12(18), pages 1-18, September.
    12. Love, Peter E.D. & Zhou, Jingyang & Edwards, David J. & Irani, Zahir & Sing, Chun-Pong, 2017. "Off the rails: The cost performance of infrastructure rail projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 99(C), pages 14-29.
    13. Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
    14. Jarosław Górecki & Manuel Díaz-Madroñero, 2020. "Who Risks and Wins?—Simulated Cost Variance in Sustainable Construction Projects," Sustainability, MDPI, vol. 12(8), pages 1-31, April.
    15. Massimo Finocchiaro Castro & Calogero Guccio & Giacomo Pignataro & Ilde Rizzo, 2018. "Is competition able to counteract the inefficiency of corruption? The case of Italian public works," Economia e Politica Industriale: Journal of Industrial and Business Economics, Springer;Associazione Amici di Economia e Politica Industriale, vol. 45(1), pages 55-84, March.
    16. Athias, Laure & Nunez, Antonio, 2008. "The more the merrier? Number of bidders, information dispersion, renegotiation and winner’s curse in toll road concessions," MPRA Paper 10539, University Library of Munich, Germany.
    17. C. Guccio & G. Pignataro & I. Rizzo, 2012. "Determinants of adaptation costs in procurement: an empirical estimation on Italian public works contracts," Applied Economics, Taylor & Francis Journals, vol. 44(15), pages 1891-1909, May.
    18. James Odeck, 2019. "Variation in cost overruns of transportation projects: an econometric meta-regression analysis of studies reported in the literature," Transportation, Springer, vol. 46(4), pages 1345-1368, August.
    19. Dejan Makovšek & Marian Moszoro, 2018. "Risk pricing inefficiency in public–private partnerships," Transport Reviews, Taylor & Francis Journals, vol. 38(3), pages 298-321, May.
    20. Cavalieri, Marina & Cristaudo, Rossana & Guccio, Calogero, 2019. "On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects," Transport Policy, Elsevier, vol. 79(C), pages 21-36.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:10:y:2018:i:12:p:4387-:d:185187. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.