Identification of Factors Affecting the Performance of Rural Road Projects in Colombia

Author

Listed:
  • Adriana Gómez-Cabrera

    (Civil and Environmental Engineering Department, Universidad de los Andes, 111711 Bogotá, Colombia
    Civil Engineering Department, Pontificia Universidad Javeriana, 111711 Bogotá, Colombia)

  • Amalia Sanz-Benlloch

    (Construction Project Management Research Group, Universitat Politècnica de València, Camino de Vera s/n, 46022 Valencia, Spain)

  • Laura Montalban-Domingo

    (Construction Project Management Research Group, Universitat Politècnica de València, Camino de Vera s/n, 46022 Valencia, Spain)

  • Jose Luis Ponz-Tienda

    (Civil and Environmental Engineering Department, Universidad de los Andes, 111711 Bogotá, Colombia)

  • Eugenio Pellicer

    (Construction Project Management Research Group, Universitat Politècnica de València, Camino de Vera s/n, 46022 Valencia, Spain)

Abstract

Rural roads play an indispensable role in economic and social well-being, especially in developing countries, contributing to achieving the Sustainable Development Goals. For this reason, it is necessary to plan these projects properly to guarantee their success. In this line, the objective of this research is to identify significant variables generating overruns in time and cost using empirical data of 535 rural road projects in Colombia from 2015 to 2018. Bivariate analysis, with statistical tools like Spearman’s Rho and Kruskal–Wallis, allowed identifying that higher values of variables like budget and project intensity are related to higher deviations in cost and time. Additionally, it was found that projects with shorter durations are reporting higher time overruns. The worst performers are projects executed in the year that council mayors start their terms, those developed in municipalities with more resources, and those awarded using a competitive bidding process. Multivariate analysis, through Random Forest, assessed the effect of considering all variables interacting simultaneously and ranking them in order of importance. The results demonstrated a relationship between cost and time performance, and that numerical variables are more significant than the categorical ones. This study contributes to a better understanding of the causes of delays and cost overruns on rural roads, providing useful insight for researchers and industry practitioners.

Suggested Citation

  • Adriana Gómez-Cabrera & Amalia Sanz-Benlloch & Laura Montalban-Domingo & Jose Luis Ponz-Tienda & Eugenio Pellicer, 2020. "Identification of Factors Affecting the Performance of Rural Road Projects in Colombia," Sustainability, MDPI, vol. 12(18), pages 1-18, September.
  • Handle: RePEc:gam:jsusta:v:12:y:2020:i:18:p:7377-:d:410745
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/12/18/7377/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/12/18/7377/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Batool, Aysha & Abbas, Faisal, 2017. "Reasons for delay in selected hydro-power projects in Khyber Pakhtunkhwa (KPK), Pakistan," Renewable and Sustainable Energy Reviews, Elsevier, vol. 73(C), pages 196-204.
    2. Cantarelli, C.C. & Molin, E.J.E. & van Wee, B. & Flyvbjerg, B., 2012. "Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases," Transport Policy, Elsevier, vol. 22(C), pages 49-56.
    3. Maria J Bastante-Ceca & Jose L Fuentes-Bargues & Levente Hufnagel & Florin Constantin Mihai & Corneliu Iatu, 2020. "Sustainability Assessment at the 21st century," Post-Print hal-02561089, HAL.
    4. Florin-Constantin Mihai & Corneliu Iatu, 2020. "Sustainable Rural Development under Agenda 2030," Chapters, in: Maria Jose Bastante-Ceca & Jose Luis Fuentes-Bargues & Levente Hufnagel & Florin-Constantin Mihai & (ed.), Sustainability Assessment at the 21st century, IntechOpen.
    5. Bent Flyvbjerg & Mette K. Skamris Holm & Søren L. Buhl, 2003. "What Causes Cost Overrun in Transport Infrastructure Projects?," Transport Reviews, Taylor & Francis Journals, vol. 24(1), pages 3-18, January.
    6. Mohan Kumaraswamy & Daniel Chan, 1998. "Contributors to construction delays," Construction Management and Economics, Taylor & Francis Journals, vol. 16(1), pages 17-29.
    7. Hauke Jan & Kossowski Tomasz, 2011. "Comparison of Values of Pearson's and Spearman's Correlation Coefficients on the Same Sets of Data," Quaestiones Geographicae, Sciendo, vol. 30(2), pages 87-93, June.
    8. Maria Jose Bastante-Ceca & Jose Luis Fuentes-Bargues & Levente Hufnagel & Florin-Constantin Mihai & (ed.), 2020. "Sustainability Assessment at the 21st century," Books, IntechOpen, number 6096, January-J.
    9. Odeck, James, 2004. "Cost overruns in road construction--what are their sizes and determinants?," Transport Policy, Elsevier, vol. 11(1), pages 43-53, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "The entanglement of time and cost deviations in public projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 94(1), pages 241-272, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mieczysław Adamowicz & Magdalena Zwolińska-Ligaj, 2020. "The “Smart Village” as a Way to Achieve Sustainable Development in Rural Areas of Poland," Sustainability, MDPI, vol. 12(16), pages 1-28, August.
    2. Joanna Storie & Edith Chenault & Mart Külvik & Simon Bell, 2020. "When Peace and Quiet Is Not Enough: Place-Shaping and the Role of Leaders in Sustainability and Quality of Life in Rural Estonia and Latvia," Land, MDPI, vol. 9(8), pages 1-19, August.
    3. Edyta Plebankiewicz & Damian Wieczorek, 2020. "Prediction of Cost Overrun Risk in Construction Projects," Sustainability, MDPI, vol. 12(22), pages 1-15, November.
    4. Verweij, Stefan & van Meerkerk, Ingmar & Korthagen, Iris A., 2015. "Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration," Transport Policy, Elsevier, vol. 37(C), pages 195-202.
    5. Love, Peter E.D. & Zhou, Jingyang & Edwards, David J. & Irani, Zahir & Sing, Chun-Pong, 2017. "Off the rails: The cost performance of infrastructure rail projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 99(C), pages 14-29.
    6. Chong, Uven & Hopkins, Omar, 2016. "An international experience on the evolution of road costs during the project life cycle," Transport Policy, Elsevier, vol. 48(C), pages 60-66.
    7. Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
    8. Dejan Makovšek & Marian Moszoro, 2018. "Risk pricing inefficiency in public–private partnerships," Transport Reviews, Taylor & Francis Journals, vol. 38(3), pages 298-321, May.
    9. Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
    10. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D. & Irani, Zahir, 2016. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 184-194.
    11. Catalão, Francisco Pinheiro & Cruz, Carlos Oliveira & Sarmento, Joaquim Miranda, 2019. "The determinants of cost deviations and overruns in transport projects, an endogenous models approach," Transport Policy, Elsevier, vol. 74(C), pages 224-238.
    12. Pamela Del Rosario & Elisabetta Palumbo & Marzia Traverso, 2021. "Environmental Product Declarations as Data Source for the Environmental Assessment of Buildings in the Context of Level(s) and DGNB: How Feasible Is Their Adoption?," Sustainability, MDPI, vol. 13(11), pages 1-22, May.
    13. Cavalieri, Marina & Cristaudo, Rossana & Guccio, Calogero, 2019. "On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects," Transport Policy, Elsevier, vol. 79(C), pages 21-36.
    14. Ana-Maria Opria & Lucian Roșu & Corneliu Iațu, 2021. "LEADER Program—An Inclusive or Selective Instrument for the Development of Rural Space in Romania?," Sustainability, MDPI, vol. 13(21), pages 1-21, November.
    15. Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "The entanglement of time and cost deviations in public projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 94(1), pages 241-272, March.
    16. Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
    17. Molinari, Laura & Haezendonck, Elvira & Mabillard, Vincent, 2023. "Cost overruns of Belgian transport infrastructure projects: Analyzing variations over three land transport modes and two project phases," Transport Policy, Elsevier, vol. 134(C), pages 167-179.
    18. Love, Peter E.D. & Sing, Michael C.P. & Ika, Lavagnon A. & Newton, Sidney, 2019. "The cost performance of transportation projects: The fallacy of the Planning Fallacy account," Transportation Research Part A: Policy and Practice, Elsevier, vol. 122(C), pages 1-20.
    19. Servranckx, Tom & Vanhoucke, Mario & Aouam, Tarik, 2021. "Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity," European Journal of Operational Research, Elsevier, vol. 295(3), pages 1161-1179.
    20. Morten Skou Nicolaisen & Patrick A. Driscoll, 2016. "An International Review of Ex-Post Project Evaluation Schemes in the Transport Sector," Journal of Environmental Assessment Policy and Management (JEAPM), World Scientific Publishing Co. Pte. Ltd., vol. 18(01), pages 1-33, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:12:y:2020:i:18:p:7377-:d:410745. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.