IDEAS home Printed from https://ideas.repec.org/a/spr/aqjoor/v14y2016i2d10.1007_s10288-016-0307-1.html
   My bibliography  Save this article

Pooling heterogeneous products for manufacturing environments

Author

Listed:
  • Tanja Mlinar

    (IÉSEG School of Management (LEM-CNRS))

  • Philippe Chevalier

    (Université catholique de Louvain)

Abstract

In a stochastic environment pooling naturally leads to economies of scale, but heterogeneity can also create variability. In the article, we investigate this trade-off in the case of a manufacturing environment. Pooling for queueing systems has been widely investigated in the literature on the design of service systems; however, much less attention has been given to manufacturing systems where jobs are given a due date upon arrival. In such systems it is not the elapsed time until the actual completion of the job that counts, but rather the due date lead time that can be promised to the customer in order to guarantee a high service level. The purpose of the article is to get a deeper understanding about how pooling strategies and lead-time decisions can be implemented to attain a high due-date performance. To this end, we develop a simulation and analytical study to determine the benefits of pooling manufacturing systems with heterogeneous demand streams. Our work allows managers to identify the characteristics of production systems such that a pooling strategy would be beneficial. Our results demonstrate that when a due-date setting and scheduling mechanism is implemented, heterogeneity does generally not lead to deterioration of performance, as previously observed in service environments. Our studies also reveal that the benefits of pooling in terms of the expected sojourn time obtained by a simple analytical treatment can serve as a good prediction of the benefits of pooling on the average due date lead time in a wide range of situations.

Suggested Citation

  • Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
  • Handle: RePEc:spr:aqjoor:v:14:y:2016:i:2:d:10.1007_s10288-016-0307-1
    DOI: 10.1007/s10288-016-0307-1
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10288-016-0307-1
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10288-016-0307-1?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to look for a different version below or search for a different version of it.

    Other versions of this item:

    References listed on IDEAS

    as
    1. Chevalier, Philippe & Lamas, Alejandro & Lu, Liang & Mlinar, Tanja, 2015. "Revenue management for operations with urgent orders," European Journal of Operational Research, Elsevier, vol. 240(2), pages 476-487.
    2. Izak Duenyas & Wallace J. Hopp, 1995. "Quoting Customer Lead Times," Management Science, INFORMS, vol. 41(1), pages 43-57, January.
    3. Michael H. Rothkopf & Paul Rech, 1987. "Perspectives on Queues: Combining Queues is Not Always Beneficial," Operations Research, INFORMS, vol. 35(6), pages 906-909, December.
    4. Avishai Mandelbaum & Martin I. Reiman, 1998. "On Pooling in Queueing Networks," Management Science, INFORMS, vol. 44(7), pages 971-981, July.
    5. Lode Li & Yew Sing Lee, 1994. "Pricing and Delivery-Time Performance in a Competitive Environment," Management Science, INFORMS, vol. 40(5), pages 633-646, May.
    6. Benjaafar, Saifallah, 1995. "Performance bounds for the effectiveness of pooling in multi-processing systems," European Journal of Operational Research, Elsevier, vol. 87(2), pages 375-388, December.
    7. Baykasoglu, Adil & Gocken, Mustafa & Unutmaz, Zeynep D., 2008. "New approaches to due date assignment in job shops," European Journal of Operational Research, Elsevier, vol. 187(1), pages 31-45, May.
    8. Shaler Stidham, 1970. "On the Optimality of Single-Server Queuing Systems," Operations Research, INFORMS, vol. 18(4), pages 708-732, August.
    9. Hübl, Alexander & Jodlbauer, Herbert & Altendorfer, Klaus, 2013. "Influence of dispatching rules on average production lead time for multi-stage production systems," International Journal of Production Economics, Elsevier, vol. 144(2), pages 479-484.
    10. Kaman, Cumhur & Savasaneril, Secil & Serin, Yasemin, 2013. "Production and lead time quotation under imperfect shop floor information," International Journal of Production Economics, Elsevier, vol. 144(2), pages 422-431.
    11. Chen, Binchao & Matis, Timothy I., 2013. "A flexible dispatching rule for minimizing tardiness in job shop scheduling," International Journal of Production Economics, Elsevier, vol. 141(1), pages 360-365.
    12. William C. Jordan & Stephen C. Graves, 1995. "Principles on the Benefits of Manufacturing Process Flexibility," Management Science, INFORMS, vol. 41(4), pages 577-594, April.
    13. Easton, Fred F. & Moodie, Douglas R., 1999. "Pricing and lead time decisions for make-to-order firms with contingent orders," European Journal of Operational Research, Elsevier, vol. 116(2), pages 305-318, July.
    14. Altendorfer, Klaus & Minner, Stefan, 2015. "Influence of order acceptance policies on optimal capacity investment with stochastic customer required lead times," European Journal of Operational Research, Elsevier, vol. 243(2), pages 555-565.
    15. Roman Kapuscinski & Sridhar Tayur, 2007. "Reliable Due-Date Setting in a Capacitated MTO System with Two Customer Classes," Operations Research, INFORMS, vol. 55(1), pages 56-74, February.
    16. Zhang, Zhe George & Kim, Ilhyung & Springer, Mark & Cai, Gangshu (George) & Yu, Yugang, 2013. "Dynamic pooling of make-to-stock and make-to-order operations," International Journal of Production Economics, Elsevier, vol. 144(1), pages 44-56.
    17. Sridharan, V. & Li, Xiaoming, 2008. "Improving delivery reliability by a new due-date setting rule," European Journal of Operational Research, Elsevier, vol. 186(3), pages 1201-1211, May.
    18. Lawrence M. Wein & Philippe B. Chevalier, 1992. "A Broader View of the Job-Shop Scheduling Problem," Management Science, INFORMS, vol. 38(7), pages 1018-1033, July.
    19. Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
    20. Eylem Tekin & Wallace Hopp & Mark Van Oyen, 2009. "Pooling strategies for call center agent cross-training," IISE Transactions, Taylor & Francis Journals, vol. 41(6), pages 546-561.
    21. Saif Benjaafar & William L. Cooper & Joon-Seok Kim, 2005. "On the Benefits of Pooling in Production-Inventory Systems," Management Science, INFORMS, vol. 51(4), pages 548-565, April.
    22. Li, Xueping & Wang, Jiao & Sawhney, Rapinder, 2012. "Reinforcement learning for joint pricing, lead-time and scheduling decisions in make-to-order systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 99-109.
    23. Azaron, Amir & Fynes, Brian & Modarres, Mohammad, 2011. "Due date assignment in repetitive projects," International Journal of Production Economics, Elsevier, vol. 129(1), pages 79-85, January.
    24. Suri Gurumurthi & Saif Benjaafar, 2004. "Modeling and analysis of flexible queueing systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(5), pages 755-782, August.
    25. Lawrence M. Wein, 1991. "Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue," Management Science, INFORMS, vol. 37(7), pages 834-850, July.
    26. Ananth V. Iyer & Apurva Jain, 2004. "Modeling the Impact of Merging Capacity in Production-Inventory Systems," Management Science, INFORMS, vol. 50(8), pages 1082-1094, August.
    27. Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
    28. Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
    29. Izak Duenyas, 1995. "Single Facility Due Date Setting with Multiple Customer Classes," Management Science, INFORMS, vol. 41(4), pages 608-619, April.
    30. Vinod, V. & Sridharan, R., 2011. "Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system," International Journal of Production Economics, Elsevier, vol. 129(1), pages 127-146, January.
    31. John A. Buzacott, 1996. "Commonalities in Reengineered Business Processes: Models and Issues," Management Science, INFORMS, vol. 42(5), pages 768-782, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. MLINAR, Tanja B. & CHEVALIER, Philippe, 2013. "Pooling in manufacturing: do opposites attract?," LIDAM Discussion Papers CORE 2013040, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    2. Erica L. Plambeck, 2004. "Optimal Leadtime Differentiation via Diffusion Approximations," Operations Research, INFORMS, vol. 52(2), pages 213-228, April.
    3. A. Baykal Hafızoğlu & Esma S. Gel & Pınar Keskinocak, 2016. "Price and Lead Time Quotation for Contract and Spot Customers," Operations Research, INFORMS, vol. 64(2), pages 406-415, April.
    4. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    5. Gökçe Kahveciog̃lu & Barış Balcıog̃lu, 2016. "Coping with production time variability via dynamic lead-time quotation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 877-898, October.
    6. Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
    7. Barış Ata & Tava Lennon Olsen, 2009. "Near-Optimal Dynamic Lead-Time Quotation and Scheduling Under Convex-Concave Customer Delay Costs," Operations Research, INFORMS, vol. 57(3), pages 753-768, June.
    8. Secil Savasaneril & Ece Sayin, 2017. "Dynamic lead time quotation under responsive inventory and multiple customer classes," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 95-135, January.
    9. Charnsirisakskul, Kasarin & Griffin, Paul M. & Keskinocak, Pinar, 2006. "Pricing and scheduling decisions with leadtime flexibility," European Journal of Operational Research, Elsevier, vol. 171(1), pages 153-169, May.
    10. Kim, Nayeon & Montreuil, Benoit & Klibi, Walid & Zied Babai, M., 2023. "Network inventory deployment for responsive fulfillment," International Journal of Production Economics, Elsevier, vol. 255(C).
    11. Li, Xueping & Wang, Jiao & Sawhney, Rapinder, 2012. "Reinforcement learning for joint pricing, lead-time and scheduling decisions in make-to-order systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 99-109.
    12. Mor Armony & Erica Plambeck & Sridhar Seshadri, 2009. "Sensitivity of Optimal Capacity to Customer Impatience in an Unobservable M/M/S Queue (Why You Shouldn't Shout at the DMV)," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 19-32, June.
    13. Cemal AKTÜRK & Sevinç GÜLSEÇEN, 2018. "Sipariş Teslim Tarihi Problemi İçin Çok Kriterli ve Çok Yöntemli Karar Destek Sistemi Önerisi," Istanbul Management Journal, Istanbul University Business School, vol. 29(84), pages 65-78, June.
    14. Bertrand, J. W. M. & van Ooijen, H. P. G., 2000. "Customer order lead times for production based on lead time and tardiness costs," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 257-265, March.
    15. Suri Gurumurthi & Saif Benjaafar, 2004. "Modeling and analysis of flexible queueing systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(5), pages 755-782, August.
    16. Nilay Tanık Argon & Sigrún Andradóttir, 2017. "Pooling in tandem queueing networks with non-collaborative servers," Queueing Systems: Theory and Applications, Springer, vol. 87(3), pages 345-377, December.
    17. Murat Erkoc & S. David Wu & Haresh Gurnani, 2008. "Delivery‐date and capacity management in a decentralized internal market," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 390-405, August.
    18. Enns, S. T., 1998. "Lead time selection and the behaviour of work flow in job shops," European Journal of Operational Research, Elsevier, vol. 109(1), pages 122-136, August.
    19. Qing Li & Qi-Ming He & Xiaoli Wu, 2016. "Timing order fulfillment of capital goods under a constrained capacity," Annals of Operations Research, Springer, vol. 241(1), pages 431-456, June.
    20. Chevalier, Philippe & Lamas, Alejandro & Lu, Liang & Mlinar, Tanja, 2015. "Revenue management for operations with urgent orders," European Journal of Operational Research, Elsevier, vol. 240(2), pages 476-487.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:aqjoor:v:14:y:2016:i:2:d:10.1007_s10288-016-0307-1. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.