IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v129y2011i1p127-146.html
   My bibliography  Save this article

Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system

Author

Listed:
  • Vinod, V.
  • Sridharan, R.

Abstract

This paper presents the salient aspects of a simulation study conducted to investigate the interaction between due-date assignment methods and scheduling rules in a typical dynamic job shop production system. The due-date assignment methods investigated are dynamic processing plus waiting time, total work content, dynamic total work content and random work content method. Seven scheduling rules are incorporated in the simulation model for the scheduling of jobs on machines. The performance of the system is evaluated using various measures based on flow time and tardiness of jobs. Simulation experiments are carried out for the different scenarios that arise out of the combination of due-date assignment methods and scheduling rules. The simulation results are subjected to statistical analysis. It is found that dynamic due-date assignment methods provide better performance. Regression-based metamodels are developed using the simulation results. These metamodels have been found to be valid analytical models of the simulation model.

Suggested Citation

  • Vinod, V. & Sridharan, R., 2011. "Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system," International Journal of Production Economics, Elsevier, vol. 129(1), pages 127-146, January.
  • Handle: RePEc:eee:proeco:v:129:y:2011:i:1:p:127-146
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(10)00349-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Udo, Godwin, 1993. "An investigation of due-date assignment using workload information of a dynamic shop," International Journal of Production Economics, Elsevier, vol. 29(1), pages 89-101, February.
    2. Baker, Kenneth R. & Trietsch, Dan, 2009. "Safe scheduling: Setting due dates in single-machine problems," European Journal of Operational Research, Elsevier, vol. 196(1), pages 69-77, July.
    3. Chang, Pei-Chann & Chen, Shih-Hsin & Mani, V., 2009. "A note on due-date assignment and single machine scheduling with a learning/aging effect," International Journal of Production Economics, Elsevier, vol. 117(1), pages 142-149, January.
    4. Baykasoglu, Adil & Gocken, Mustafa & Unutmaz, Zeynep D., 2008. "New approaches to due date assignment in job shops," European Journal of Operational Research, Elsevier, vol. 187(1), pages 31-45, May.
    5. Su, Ling-Huey & Lien, Chun-Yuan, 2009. "Scheduling parallel machines with resource-dependent processing times," International Journal of Production Economics, Elsevier, vol. 117(2), pages 256-266, February.
    6. Og[breve]uz, Ceyda & Sibel Salman, F. & Bilgintürk YalçIn, Zehra, 2010. "Order acceptance and scheduling decisions in make-to-order systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 200-211, May.
    7. Raghu, T. S. & Rajendran, Chandrasekharan, 1993. "An efficient dynamic dispatching rule for scheduling in a job shop," International Journal of Production Economics, Elsevier, vol. 32(3), pages 301-313, November.
    8. Kleijnen, Jack P. C. & Standridge, Charles R., 1988. "Experimental design and regression analysis in simulation: An FMS case study," European Journal of Operational Research, Elsevier, vol. 33(3), pages 257-261, February.
    9. Nicholas G. Hall & Marc E. Posner, 2001. "Generating Experimental Data for Computational Testing with Machine Scheduling Applications," Operations Research, INFORMS, vol. 49(6), pages 854-865, December.
    10. Ozturk, Atakan & Kayaligil, Sinan & Ozdemirel, Nur E., 2006. "Manufacturing lead time estimation using data mining," European Journal of Operational Research, Elsevier, vol. 173(2), pages 683-700, September.
    11. Yedidsion, Liron & Shabtay, Dvir & Korach, Ephraim & Kaspi, Moshe, 2009. "A bicriteria approach to minimize number of tardy jobs and resource consumption in scheduling a single machine," International Journal of Production Economics, Elsevier, vol. 119(2), pages 298-307, June.
    12. Baykasoglu, Adil & ÖzbakIr, Lale, 2010. "Analyzing the effect of dispatching rules on the scheduling performance through grammar based flexible scheduling system," International Journal of Production Economics, Elsevier, vol. 124(2), pages 369-381, April.
    13. Ramasesh, R, 1990. "Dynamic job shop scheduling: A survey of simulation research," Omega, Elsevier, vol. 18(1), pages 43-57.
    14. Shabtay, Dvir, 2010. "Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs," International Journal of Production Economics, Elsevier, vol. 123(1), pages 235-242, January.
    15. Abdi, M.R., 2009. "Fuzzy multi-criteria decision model for evaluating reconfigurable machines," International Journal of Production Economics, Elsevier, vol. 117(1), pages 1-15, January.
    16. Wang, Xiuli & Cheng, T.C.E., 2009. "Heuristics for parallel-machine scheduling with job class setups and delivery to multiple customers," International Journal of Production Economics, Elsevier, vol. 119(1), pages 199-206, May.
    17. Huang, Rong-Hwa, 2010. "Multi-objective job-shop scheduling with lot-splitting production," International Journal of Production Economics, Elsevier, vol. 124(1), pages 206-213, March.
    18. Gordon, Valery S. & Strusevich, Vitaly A., 2009. "Single machine scheduling and due date assignment with positionally dependent processing times," European Journal of Operational Research, Elsevier, vol. 198(1), pages 57-62, October.
    19. Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
    20. Kenneth R. Baker, 1984. "Sequencing Rules and Due-Date Assignments in a Job Shop," Management Science, INFORMS, vol. 30(9), pages 1093-1104, September.
    21. Rajendran, Chandrasekharan & Holthaus, Oliver, 1999. "A comparative study of dispatching rules in dynamic flowshops and jobshops," European Journal of Operational Research, Elsevier, vol. 116(1), pages 156-170, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhang, Rui & Song, Shiji & Wu, Cheng, 2013. "A hybrid artificial bee colony algorithm for the job shop scheduling problem," International Journal of Production Economics, Elsevier, vol. 141(1), pages 167-178.
    2. Chuang Wang & Pingyu Jiang, 2019. "Deep neural networks based order completion time prediction by using real-time job shop RFID data," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1303-1318, March.
    3. Jürgen Strohhecker & Michael Hamann & Jörn-Henrik Thun, 2016. "Loading and sequencing heuristics for job scheduling on two unrelated parallel machines with long, sequence-dependent set-up times," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6747-6767, November.
    4. Hankun Zhang & Borut Buchmeister & Xueyan Li & Robert Ojstersek, 2021. "Advanced Metaheuristic Method for Decision-Making in a Dynamic Job Shop Scheduling Environment," Mathematics, MDPI, vol. 9(8), pages 1-22, April.
    5. Mallor, Fermin & Guardiola, Ivan G., 2014. "The Weibull scheduling index for client driven manufacturing processes," International Journal of Production Economics, Elsevier, vol. 150(C), pages 225-238.
    6. Al-Hinai, Nasr & ElMekkawy, T.Y., 2011. "Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm," International Journal of Production Economics, Elsevier, vol. 132(2), pages 279-291, August.
    7. Aijun Liu & John Fowler & Michele Pfund, 2016. "Dynamic co-ordinated scheduling in the supply chain considering flexible routes," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 322-335, January.
    8. A. S. Xanthopoulos & D. E. Koulouriotis, 2018. "Cluster analysis and neural network-based metamodeling of priority rules for dynamic sequencing," Journal of Intelligent Manufacturing, Springer, vol. 29(1), pages 69-91, January.
    9. Cenk Sahin & Melek Demirtas & Rizvan Erol & Adil Baykasoğlu & Vahit Kaplanoğlu, 2017. "A multi-agent based approach to dynamic scheduling with flexible processing capabilities," Journal of Intelligent Manufacturing, Springer, vol. 28(8), pages 1827-1845, December.
    10. Adil Baykasoğlu & Fatma S. Karaslan, 2017. "Solving comprehensive dynamic job shop scheduling problem by using a GRASP-based approach," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3308-3325, June.
    11. Schaller, Jeffrey & Valente, Jorge M.S., 2020. "Minimizing total earliness and tardiness in a nowait flow shop," International Journal of Production Economics, Elsevier, vol. 224(C).
    12. Yao, Shiqing & Jiang, Zhibin & Li, Na & Zhang, Huai & Geng, Na, 2011. "A multi-objective dynamic scheduling approach using multiple attribute decision making in semiconductor manufacturing," International Journal of Production Economics, Elsevier, vol. 130(1), pages 125-133, March.
    13. Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
    14. Saeed Yaghoubi, 2015. "Due-date assignment for multi-server multi-stage assembly systems," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(7), pages 1246-1256, May.
    15. Xiong, Hegen & Fan, Huali & Jiang, Guozhang & Li, Gongfa, 2017. "A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints," European Journal of Operational Research, Elsevier, vol. 257(1), pages 13-24.
    16. Hankun Zhang & Borut Buchmeister & Xueyan Li & Robert Ojstersek, 2023. "An Efficient Metaheuristic Algorithm for Job Shop Scheduling in a Dynamic Environment," Mathematics, MDPI, vol. 11(10), pages 1-24, May.
    17. Yu-Cheng Wang & Horng-Ren Tsai & Toly Chen, 2021. "A Selectively Fuzzified Back Propagation Network Approach for Precisely Estimating the Cycle Time Range in Wafer Fabrication," Mathematics, MDPI, vol. 9(12), pages 1-18, June.
    18. MLINAR, Tanja B. & CHEVALIER, Philippe, 2013. "Pooling in manufacturing: do opposites attract?," LIDAM Discussion Papers CORE 2013040, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ferreira, Cristiane & Figueira, Gonçalo & Amorim, Pedro, 2022. "Effective and interpretable dispatching rules for dynamic job shops via guided empirical learning," Omega, Elsevier, vol. 111(C).
    2. Chen, Binchao & Matis, Timothy I., 2013. "A flexible dispatching rule for minimizing tardiness in job shop scheduling," International Journal of Production Economics, Elsevier, vol. 141(1), pages 360-365.
    3. Jayamohan, M. S. & Rajendran, Chandrasekharan, 2004. "Development and analysis of cost-based dispatching rules for job shop scheduling," European Journal of Operational Research, Elsevier, vol. 157(2), pages 307-321, September.
    4. Sarper, H. & Henry, M. C., 1996. "Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop," Omega, Elsevier, vol. 24(1), pages 73-81, February.
    5. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    6. Li, Shisheng & Ng, C.T. & Yuan, Jinjiang, 2011. "Group scheduling and due date assignment on a single machine," International Journal of Production Economics, Elsevier, vol. 130(2), pages 230-235, April.
    7. Kedar S. Naphade & S. David Wu & Robert H. Storer & Bhavin J. Doshi, 2001. "Melt Scheduling to Trade Off Material Waste and Shipping Performance," Operations Research, INFORMS, vol. 49(5), pages 629-645, October.
    8. Holthaus, Oliver & Rajendran, Chandrasekharan, 1997. "Efficient dispatching rules for scheduling in a job shop," International Journal of Production Economics, Elsevier, vol. 48(1), pages 87-105, January.
    9. Xiong, Hegen & Fan, Huali & Jiang, Guozhang & Li, Gongfa, 2017. "A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints," European Journal of Operational Research, Elsevier, vol. 257(1), pages 13-24.
    10. Li, Shisheng & Ng, C.T. & Yuan, Jinjiang, 2011. "Scheduling deteriorating jobs with CON/SLK due date assignment on a single machine," International Journal of Production Economics, Elsevier, vol. 131(2), pages 747-751, June.
    11. Zhi-Long Chen & Nicholas G. Hall, 2010. "The Coordination of Pricing and Scheduling Decisions," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 77-92, April.
    12. Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
    13. Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
    14. Sabuncuoglu, I. & Comlekci, A., 2002. "Operation-based flowtime estimation in a dynamic job shop," Omega, Elsevier, vol. 30(6), pages 423-442, December.
    15. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    16. Li, Heng & Li, Zhicheng & Li, Ling X. & Hu, Bin, 2000. "A production rescheduling expert simulation system," European Journal of Operational Research, Elsevier, vol. 124(2), pages 283-293, July.
    17. Branke, Juergen & Pickardt, Christoph W., 2011. "Evolutionary search for difficult problem instances to support the design of job shop dispatching rules," European Journal of Operational Research, Elsevier, vol. 212(1), pages 22-32, July.
    18. Alvarez-Valdes, R. & Fuertes, A. & Tamarit, J. M. & Gimenez, G. & Ramos, R., 2005. "A heuristic to schedule flexible job-shop in a glass factory," European Journal of Operational Research, Elsevier, vol. 165(2), pages 525-534, September.
    19. Zhou, Hong & Cheung, Waiman & Leung, Lawrence C., 2009. "Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm," European Journal of Operational Research, Elsevier, vol. 194(3), pages 637-649, May.
    20. Wallace J. Hopp & Melanie Roof Sturgis, 2001. "A Simple, Robust Leadtime-Quoting Policy," Manufacturing & Service Operations Management, INFORMS, vol. 3(4), pages 321-336, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:129:y:2011:i:1:p:127-146. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.