Performance improvement potential of sensor embedded products in environmental supply chains
Author
Abstract
Suggested Citation
DOI: 10.1016/j.resconrec.2010.05.001
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Herzog, M.A. & Marwala, T. & Heyns, P.S., 2009. "Machine and component residual life estimation through the application of neural networks," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 479-489.
- Kannan, Govindan & Pokharel, Shaligram & Sasi Kumar, P., 2009. "A hybrid approach using ISM and fuzzy TOPSIS for the selection of reverse logistics provider," Resources, Conservation & Recycling, Elsevier, vol. 54(1), pages 28-36.
- Li, Jianzhi & González, Miguel & Zhu, Yun, 2009. "A hybrid simulation optimization method for production planning of dedicated remanufacturing," International Journal of Production Economics, Elsevier, vol. 117(2), pages 286-301, February.
- Barba-Gutierrez, Y. & Adenso-Diaz, B. & Gupta, S.M., 2008. "Lot sizing in reverse MRP for scheduling disassembly," International Journal of Production Economics, Elsevier, vol. 111(2), pages 741-751, February.
- Takahashi, Katsuhiko & Morikawa, Katsumi & Nakamura, Nobuto, 2004. "Reactive JIT ordering system for changes in the mean and variance of demand," International Journal of Production Economics, Elsevier, vol. 92(2), pages 181-196, November.
- Yalabik, Baris & Petruzzi, Nicholas C. & Chhajed, Dilip, 2005. "An integrated product returns model with logistics and marketing coordination," European Journal of Operational Research, Elsevier, vol. 161(1), pages 162-182, February.
- Tardif, Valerie & Maaseidvaag, Lars, 2001. "An adaptive approach to controlling kanban systems," European Journal of Operational Research, Elsevier, vol. 132(2), pages 411-424, July.
- Iakovou, E. & Moussiopoulos, N. & Xanthopoulos, A. & Achillas, Ch. & Michailidis, N. & Chatzipanagioti, M. & Koroneos, C. & Bouzakis, K.-D. & Kikis, V., 2009. "A methodological framework for end-of-life management of electronic products," Resources, Conservation & Recycling, Elsevier, vol. 53(6), pages 329-339.
- Salema, Maria Isabel Gomes & Barbosa-Povoa, Ana Paula & Novais, Augusto Q., 2010. "Simultaneous design and planning of supply chains with reverse flows: A generic modelling framework," European Journal of Operational Research, Elsevier, vol. 203(2), pages 336-349, June.
- Takahashi, Katsuhiko & Nakamura, Nobuto, 2002. "Decentralized reactive Kanban system," European Journal of Operational Research, Elsevier, vol. 139(2), pages 262-276, June.
- Aras, Necati & Aksen, Deniz, 2008. "Locating collection centers for distance- and incentive-dependent returns," International Journal of Production Economics, Elsevier, vol. 111(2), pages 316-333, February.
- Markus Klausner & Wolfgang M. Grimm & Chris Hendrickson, 1998. "Reuse of Electric Motors in Consumer Products," Journal of Industrial Ecology, Yale University, vol. 2(2), pages 89-102, April.
- V. Daniel R. Guide, Jr. & Ruud H. Teunter & Luk N. Van Wassenhove, 2003. "Matching Demand and Supply to Maximize Profits from Remanufacturing," Manufacturing & Service Operations Management, INFORMS, vol. 5(4), pages 303-316, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yongjian Wang & Fei Wang & Wenbo Li, 2023. "Effects of the Carbon Credit Policy on the Capital-Constrained Manufacturer’s Remanufacturing and Emissions Decisions," IJERPH, MDPI, vol. 20(5), pages 1-17, February.
- Simonetto, Marco & Sgarbossa, Fabio & Battini, Daria & Govindan, Kannan, 2022. "Closed loop supply chains 4.0: From risks to benefits through advanced technologies. A literature review and research agenda," International Journal of Production Economics, Elsevier, vol. 253(C).
- Ammar Y. Alqahtani & Surendra M. Gupta, 2017. "One-Dimensional Renewable Warranty Management within Sustainable Supply Chain," Resources, MDPI, vol. 6(2), pages 1-26, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Wenyuan Wang & Daniel Y. Mo & Yue Wang & Mitchell M. Tseng, 2019. "Assessing the cost structure of component reuse in a product family for remanufacturing," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 575-587, February.
- Kumar, Akhilesh & Chinnam, Ratna Babu & Murat, Alper, 2017. "Hazard rate models for core return modeling in auto parts remanufacturing," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 354-361.
- Pokharel, Shaligram & Mutha, Akshay, 2009. "Perspectives in reverse logistics: A review," Resources, Conservation & Recycling, Elsevier, vol. 53(4), pages 175-182.
- Ondemir, Onder & Gupta, Surendra M., 2014. "A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system," European Journal of Operational Research, Elsevier, vol. 233(2), pages 408-419.
- Ammar Y. Alqahtani & Surendra M. Gupta, 2017. "One-Dimensional Renewable Warranty Management within Sustainable Supply Chain," Resources, MDPI, vol. 6(2), pages 1-26, April.
- Das, Debabrata & Dutta, Pankaj, 2022. "Product return management through promotional offers: The role of consumers’ loss aversion," International Journal of Production Economics, Elsevier, vol. 251(C).
- Mohsen Zamani & Mahdi Abolghasemi & Seyed Mohammad Seyed Hosseini & Mir Saman Pishvaee, 2019. "Considering pricing and uncertainty in designing a reverse logistics network," Papers 1909.11633, arXiv.org.
- Tsan Sheng Ng & Shuming Wang, 2017. "Recycling systems design using reservation incentive data," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(10), pages 1236-1258, October.
- Mohammad Fattahi & Kannan Govindan, 2017. "Integrated forward/reverse logistics network design under uncertainty with pricing for collection of used products," Annals of Operations Research, Springer, vol. 253(1), pages 193-225, June.
- Das, Kanchan & Chowdhury, Abdul H., 2012. "Designing a reverse logistics network for optimal collection, recovery and quality-based product-mix planning," International Journal of Production Economics, Elsevier, vol. 135(1), pages 209-221.
- Liao, Haolan & Zhang, Qingyu & Shen, Neng & Nie, Yongyou & Li, Lu, 2021. "Coordination between forward and reverse production streams for maximum profitability," Omega, Elsevier, vol. 104(C).
- Takahashi, Katsuhiko & Morikawa, Katsumi & Nakamura, Nobuto, 2004. "Reactive JIT ordering system for changes in the mean and variance of demand," International Journal of Production Economics, Elsevier, vol. 92(2), pages 181-196, November.
- Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
- Aksen, Deniz & Aras, Necati & Karaarslan, Ayse Gönül, 2009. "Design and analysis of government subsidized collection systems for incentive-dependent returns," International Journal of Production Economics, Elsevier, vol. 119(2), pages 308-327, June.
- Pokharel, Shaligram & Liang, Yijiong, 2012. "A model to evaluate acquisition price and quantity of used products for remanufacturing," International Journal of Production Economics, Elsevier, vol. 138(1), pages 170-176.
- Bagheri Hosseini, Mozhde & Dehghanian, Farzad & Salari, Majid, 2019. "Selective capacitated location-routing problem with incentive-dependent returns in designing used products collection network," European Journal of Operational Research, Elsevier, vol. 272(2), pages 655-673.
- Agrawal, Saurabh & Singh, Rajesh K. & Murtaza, Qasim, 2015. "A literature review and perspectives in reverse logistics," Resources, Conservation & Recycling, Elsevier, vol. 97(C), pages 76-92.
- Yongbo Li & Devika Kannan & P. C. Jha & Kiran Garg & Jyoti Darbari & Neha Agarwal, 2023. "Design of a multi echelon product recovery embeded reverse logistics network for multi products and multi periods," Annals of Operations Research, Springer, vol. 323(1), pages 131-152, April.
- Govindan, Kannan & Soleimani, Hamed & Kannan, Devika, 2015. "Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future," European Journal of Operational Research, Elsevier, vol. 240(3), pages 603-626.
- Habibi, M.K. Khakim & Battaïa, Olga & Cung, Van-Dat & Dolgui, Alexandre, 2017. "Collection-disassembly problem in reverse supply chain," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 334-344.
More about this item
Keywords
Reverse supply chain; Closed-loop supply chain; Disassembly line; Sensor embedded products; Multi-kanban system; Orthogonal arrays;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:recore:v:55:y:2011:i:6:p:580-592. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Kai Meng (email available below). General contact details of provider: https://www.journals.elsevier.com/resources-conservation-and-recycling .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.