IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v60-61y1999i1p395-404.html
   My bibliography  Save this article

Measuring the impact of asymmetric demand distributions on inventories

Author

Listed:
  • Bartezzaghi, Emilio
  • Verganti, Roberto
  • Zotteri, Giulio

Abstract

No abstract is available for this item.

Suggested Citation

  • Bartezzaghi, Emilio & Verganti, Roberto & Zotteri, Giulio, 1999. "Measuring the impact of asymmetric demand distributions on inventories," International Journal of Production Economics, Elsevier, vol. 60(1), pages 395-404, April.
  • Handle: RePEc:eee:proeco:v:60-61:y:1999:i:1:p:395-404
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(98)00193-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Bartezzaghi, Emilio & Verganti, Roberto & Zotteri, Giulio, 1999. "A simulation framework for forecasting uncertain lumpy demand," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 499-510, March.
    2. Vereecke, Ann & Verstraeten, Peter, 1994. "An inventory management model for an inventory consisting of lumpy items, slow movers and fast movers," International Journal of Production Economics, Elsevier, vol. 35(1-3), pages 379-389, June.
    3. J. B. Ward, 1978. "Determining Reorder Points When Demand is Lumpy," Management Science, INFORMS, vol. 24(6), pages 623-632, February.
    4. Bartezzaghi, Emilio & Verganti, Roberto, 1995. "Managing demand uncertainty through order overplanning," International Journal of Production Economics, Elsevier, vol. 40(2-3), pages 107-120, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Strijbosch, L. W. G. & Moors, J. J. A., 2005. "The impact of unknown demand parameters on (R,S)-inventory control performance," European Journal of Operational Research, Elsevier, vol. 162(3), pages 805-815, May.
    2. Strijbosch, L.W.G. & Moors, J.J.A., 2003. "Modified Normal Demand Distributions in (R,S)-Inventory Models," Other publications TiSEM 8cb6e884-a1d3-4619-b506-9, Tilburg University, School of Economics and Management.
    3. Huang, Ming-Guan, 2009. "Real options approach-based demand forecasting method for a range of products with highly volatile and correlated demand," European Journal of Operational Research, Elsevier, vol. 198(3), pages 867-877, November.
    4. Strijbosch, L.W.G. & Moors, J.J.A., 2006. "Modified normal demand distributions in (R, S)-inventory control," European Journal of Operational Research, Elsevier, vol. 172(1), pages 201-212, July.
    5. Rossetti, Manuel D. & Yasin Ünlü, 2011. "Evaluating the robustness of lead time demand models," International Journal of Production Economics, Elsevier, vol. 134(1), pages 159-176, November.
    6. Jože Martin Rožanec & Blaž Fortuna & Dunja Mladenić, 2022. "Reframing Demand Forecasting: A Two-Fold Approach for Lumpy and Intermittent Demand," Sustainability, MDPI, vol. 14(15), pages 1-21, July.
    7. Alp Akcay & Bahar Biller & Sridhar Tayur, 2011. "Improved Inventory Targets in the Presence of Limited Historical Demand Data," Manufacturing & Service Operations Management, INFORMS, vol. 13(3), pages 297-309, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Murphy Choy & Michelle L. F. Cheong, 2011. "Identification of Demand through Statistical Distribution Modeling for Improved Demand Forecasting," Papers 1110.0062, arXiv.org.
    2. Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
    3. Zotteri, Giulio & Verganti, Roberto, 2001. "Multi-level approaches to demand management in complex environments: an analytical model," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 221-233, May.
    4. Syntetos, Aris A. & Boylan, John E., 2006. "On the stock control performance of intermittent demand estimators," International Journal of Production Economics, Elsevier, vol. 103(1), pages 36-47, September.
    5. Banerjee, Avijit & Burton, Jonathan & Banerjee, Snehamay, 1996. "Heuristic production triggering mechanisms under discrete unequal inventory withdrawals," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 83-90, August.
    6. Kalchschmidt, Matteo & Zotteri, Giulio & Verganti, Roberto, 2003. "Inventory management in a multi-echelon spare parts supply chain," International Journal of Production Economics, Elsevier, vol. 81(1), pages 397-413, January.
    7. Mak, K. L. & Lai, K. K. & Ng, W. C. & Yiu, K. F. C., 2005. "Analysis of optimal opportunistic replenishment policies for inventory systems by using a (s,S) model with a maximum issue quantity restriction," European Journal of Operational Research, Elsevier, vol. 166(2), pages 385-405, October.
    8. Nenes, George & Panagiotidou, Sofia & Tagaras, George, 2010. "Inventory management of multiple items with irregular demand: A case study," European Journal of Operational Research, Elsevier, vol. 205(2), pages 313-324, September.
    9. Banerjee, Snehamay & Banerjee, Avijit & Burton, Jonathan & Bistline, William, 2001. "Controlled partial shipments in two-echelon supply chain networks: a simulation study," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 91-100, May.
    10. Mario Guajardo & Mikael Rönnqvist & Ann Mari Halvorsen & Svein Inge Kallevik, 2015. "Inventory management of spare parts in an energy company," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(2), pages 331-341, February.
    11. Sivadasan, Suja & Smart, Janet & Huaccho Huatuco, Luisa & Calinescu, Anisoara, 2013. "Reducing schedule instability by identifying and omitting complexity-adding information flows at the supplier–customer interface," International Journal of Production Economics, Elsevier, vol. 145(1), pages 253-262.
    12. Larsen, Christian, 2011. "Derivation of confidence intervals of service measures in a base-stock inventory control system with low-frequent demand," International Journal of Production Economics, Elsevier, vol. 131(1), pages 69-75, May.
    13. Prak, Dennis & Teunter, Ruud & Babai, Mohamed Zied & Boylan, John E. & Syntetos, Aris, 2021. "Robust compound Poisson parameter estimation for inventory control," Omega, Elsevier, vol. 104(C).
    14. John W. Bradford & Paul K. Sugrue, 1991. "Inventory rotation policies for slow moving items," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(1), pages 87-105, February.
    15. Prak, Derk & Teunter, Rudolf & Babai, M. Z. & Syntetos, A. A. & Boylan, D, 2018. "Forecasting and Inventory Control with Compound Poisson Demand Using Periodic Demand Data," Research Report 2018010, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    16. Lengu, D. & Syntetos, A.A. & Babai, M.Z., 2014. "Spare parts management: Linking distributional assumptions to demand classification," European Journal of Operational Research, Elsevier, vol. 235(3), pages 624-635.
    17. Minner, Stefan & Silver, Edward A. & Robb, David J., 2003. "An improved heuristic for deciding on emergency transshipments," European Journal of Operational Research, Elsevier, vol. 148(2), pages 384-400, July.
    18. Bartezzaghi, Emilio & Verganti, Roberto & Zotteri, Giulio, 1999. "A simulation framework for forecasting uncertain lumpy demand," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 499-510, March.
    19. François Galasso & Caroline Thierry, 2008. "Cooperation Support In A Dyadic Supply Chain," Working Papers hal-00235808, HAL.
    20. Sofia Estelles-Miguel & Manuel Cardos & Jose Miguel Albarracin Guillem & Marta Palmer Gato, 2014. "Calculation of the Approaches to Cycle Service Level in Continuous Review Policy: A Tool for Corporate Entrepreneur," Business and Management Research, Business and Management Research, Sciedu Press, vol. 3(1), pages 54-60, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:60-61:y:1999:i:1:p:395-404. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.