IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v148y2003i2p384-400.html
   My bibliography  Save this article

An improved heuristic for deciding on emergency transshipments

Author

Listed:
  • Minner, Stefan
  • Silver, Edward A.
  • Robb, David J.

Abstract

No abstract is available for this item.

Suggested Citation

  • Minner, Stefan & Silver, Edward A. & Robb, David J., 2003. "An improved heuristic for deciding on emergency transshipments," European Journal of Operational Research, Elsevier, vol. 148(2), pages 384-400, July.
  • Handle: RePEc:eee:ejores:v:148:y:2003:i:2:p:384-400
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(02)00424-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. J. B. Ward, 1978. "Determining Reorder Points When Demand is Lumpy," Management Science, INFORMS, vol. 24(6), pages 623-632, February.
    2. Lawrence W. Robinson, 1990. "Optimal and Approximate Policies in Multiperiod, Multilocation Inventory Models with Transshipments," Operations Research, INFORMS, vol. 38(2), pages 278-295, April.
    3. T. W. Archibald & S. A. E. Sassen & L. C. Thomas, 1997. "An Optimal Policy for a Two Depot Inventory Problem with Stock Transfer," Management Science, INFORMS, vol. 43(2), pages 173-183, February.
    4. Tagaras, George, 1999. "Pooling in multi-location periodic inventory distribution systems," Omega, Elsevier, vol. 27(1), pages 39-59, February.
    5. George Tagaras & Morris A. Cohen, 1992. "Pooling in Two-Location Inventory Systems with Non-Negligible Replenishment Lead Times," Management Science, INFORMS, vol. 38(8), pages 1067-1083, August.
    6. Silver, Edward A. & A. Willoughby, Keith, 1999. "Disposal of excess stock at the end of a project when facing on-going operational usage," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 189-194, March.
    7. Janssen, Fred & Heuts, Ruud & de Kok, Ton, 1998. "On the (R, s, Q) inventory model when demand is modelled as a compound Bernoulli process," European Journal of Operational Research, Elsevier, vol. 104(3), pages 423-436, February.
    8. S. G. Allen, 1962. "Computation for the Redistribution Model with Set-Up Charge," Management Science, INFORMS, vol. 8(4), pages 482-489, July.
    9. Evers, Philip T., 2001. "Heuristics for assessing emergency transshipments," European Journal of Operational Research, Elsevier, vol. 129(2), pages 311-316, March.
    10. Nils Rudi & Sandeep Kapur & David F. Pyke, 2001. "A Two-Location Inventory Model with Transshipment and Local Decision Making," Management Science, INFORMS, vol. 47(12), pages 1668-1680, December.
    11. Diks, E. B. & de Kok, A. G., 1996. "Controlling a divergent 2-echelon network with transshipments using the consistent appropriate share rationing policy," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 369-379, August.
    12. Needham, Paul M. & Evers, Philip T., 1998. "The influence of individual cost factors on the use of emergency transshipments," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 34(2), pages 149-160, June.
    13. Hau L. Lee, 1987. "A Multi-Echelon Inventory Model for Repairable Items with Emergency Lateral Transshipments," Management Science, INFORMS, vol. 33(10), pages 1302-1316, October.
    14. Sven Axsäter, 1990. "Modelling Emergency Lateral Transshipments in Inventory Systems," Management Science, INFORMS, vol. 36(11), pages 1329-1338, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tiacci, Lorenzo & Saetta, Stefano, 2011. "Reducing the mean supply delay of spare parts using lateral transshipments policies," International Journal of Production Economics, Elsevier, vol. 133(1), pages 182-191, September.
    2. Archibald, T.W. & Black, D. & Glazebrook, K.D., 2009. "An index heuristic for transshipment decisions in multi-location inventory systems based on a pairwise decomposition," European Journal of Operational Research, Elsevier, vol. 192(1), pages 69-78, January.
    3. Tiemessen, H.G.H. & Fleischmann, M. & van Houtum, G.J. & van Nunen, J.A.E.E. & Pratsini, E., 2013. "Dynamic demand fulfillment in spare parts networks with multiple customer classes," European Journal of Operational Research, Elsevier, vol. 228(2), pages 367-380.
    4. van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2019. "Optimal lateral transshipment policies for a two location inventory problem with multiple demand classes," European Journal of Operational Research, Elsevier, vol. 272(2), pages 481-495.
    5. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
    6. Minner, Stefan & Silver, Edward A., 2005. "Evaluation of two simple extreme transshipment strategies," International Journal of Production Economics, Elsevier, vol. 93(1), pages 1-11, January.
    7. Meissner, Joern & Senicheva, Olga V., 2018. "Approximate dynamic programming for lateral transshipment problems in multi-location inventory systems," European Journal of Operational Research, Elsevier, vol. 265(1), pages 49-64.
    8. Rottkemper, Beate & Fischer, Kathrin & Blecken, Alexander, 2012. "A transshipment model for distribution and inventory relocation under uncertainty in humanitarian operations," Socio-Economic Planning Sciences, Elsevier, vol. 46(1), pages 98-109.
    9. T W Archibald & D P Black & K D Glazebrook, 2010. "The use of simple calibrations of individual locations in making transshipment decisions in a multi-location inventory network," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(2), pages 294-305, February.
    10. Paterson, Colin & Teunter, Ruud & Glazebrook, Kevin, 2012. "Enhanced lateral transshipments in a multi-location inventory system," European Journal of Operational Research, Elsevier, vol. 221(2), pages 317-327.
    11. Tiacci, Lorenzo & Saetta, Stefano, 2011. "A heuristic for balancing the inventory level of different locations through lateral shipments," International Journal of Production Economics, Elsevier, vol. 131(1), pages 87-95, May.
    12. Lee, Young Hae & Jung, Jung Woo & Jeon, Young Sang, 2007. "An effective lateral transshipment policy to improve service level in the supply chain," International Journal of Production Economics, Elsevier, vol. 106(1), pages 115-126, March.
    13. Hochmuth, Christian A. & Köchel, Peter, 2012. "How to order and transship in multi-location inventory systems: The simulation optimization approach," International Journal of Production Economics, Elsevier, vol. 140(2), pages 646-654.
    14. Frank Schneider & Ulrich W. Thonemann & Diego Klabjan, 2018. "Optimization of Battery Charging and Purchasing at Electric Vehicle Battery Swap Stations," Transportation Science, INFORMS, vol. 52(5), pages 1211-1234, October.
    15. Teunter, R.H. & Syntetos, A.A. & Babai, M.Z., 2010. "Determining order-up-to levels under periodic review for compound binomial (intermittent) demand," European Journal of Operational Research, Elsevier, vol. 203(3), pages 619-624, June.
    16. T W Archibald, 2007. "Modelling replenishment and transshipment decisions in periodic review multilocation inventory systems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 948-956, July.
    17. Kranenburg, A.A. & van Houtum, G.J., 2009. "A new partial pooling structure for spare parts networks," European Journal of Operational Research, Elsevier, vol. 199(3), pages 908-921, December.
    18. Satır, Benhür & Savasaneril, Secil & Serin, Yasemin, 2012. "Pooling through lateral transshipments in service parts systems," European Journal of Operational Research, Elsevier, vol. 220(2), pages 370-377.
    19. Cavagnini, Rossana & Bertazzi, Luca & Maggioni, Francesca, 2022. "A rolling horizon approach for a multi-stage stochastic fixed-charge transportation problem with transshipment," European Journal of Operational Research, Elsevier, vol. 301(3), pages 912-922.
    20. Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
    21. Kang, Jae-Hun & Kim, Yeong-Dae, 2012. "Inventory control in a two-level supply chain with risk pooling effect," International Journal of Production Economics, Elsevier, vol. 135(1), pages 116-124.
    22. Sven Axsäter, 2003. "A New Decision Rule for Lateral Transshipments in Inventory Systems," Management Science, INFORMS, vol. 49(9), pages 1168-1179, September.
    23. Zümbül Atan & Lawrence V. Snyder & George R. Wilson, 2018. "Transshipment policies for systems with multiple retailers and two demand classes," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(1), pages 159-186, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
    2. Tiacci, Lorenzo & Saetta, Stefano, 2011. "Reducing the mean supply delay of spare parts using lateral transshipments policies," International Journal of Production Economics, Elsevier, vol. 133(1), pages 182-191, September.
    3. Tiacci, Lorenzo & Saetta, Stefano, 2011. "A heuristic for balancing the inventory level of different locations through lateral shipments," International Journal of Production Economics, Elsevier, vol. 131(1), pages 87-95, May.
    4. Wong, H. & van Houtum, G.J. & Cattrysse, D. & Oudheusden, D. Van, 2006. "Multi-item spare parts systems with lateral transshipments and waiting time constraints," European Journal of Operational Research, Elsevier, vol. 171(3), pages 1071-1093, June.
    5. Xinxin Hu & Izak Duenyas & Roman Kapuscinski, 2008. "Optimal Joint Inventory and Transshipment Control Under Uncertain Capacity," Operations Research, INFORMS, vol. 56(4), pages 881-897, August.
    6. Paterson, Colin & Teunter, Ruud & Glazebrook, Kevin, 2012. "Enhanced lateral transshipments in a multi-location inventory system," European Journal of Operational Research, Elsevier, vol. 221(2), pages 317-327.
    7. Herer, Yale T. & Tzur, Michal & Yucesan, Enver, 2002. "Transshipments: An emerging inventory recourse to achieve supply chain leagility," International Journal of Production Economics, Elsevier, vol. 80(3), pages 201-212, December.
    8. Tagaras, George, 1999. "Pooling in multi-location periodic inventory distribution systems," Omega, Elsevier, vol. 27(1), pages 39-59, February.
    9. T W Archibald, 2007. "Modelling replenishment and transshipment decisions in periodic review multilocation inventory systems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 948-956, July.
    10. Jian Yang & Zhaoqiong Qin, 2007. "Capacitated Production Control with Virtual Lateral Transshipments," Operations Research, INFORMS, vol. 55(6), pages 1104-1119, December.
    11. Hu, Jason & Watson, Edward & Schneider, Helmut, 2005. "Approximate solutions for multi-location inventory systems with transshipments," International Journal of Production Economics, Elsevier, vol. 97(1), pages 31-43, July.
    12. Banerjee, Avijit & Burton, Jonathan & Banerjee, Snehamay, 2003. "A simulation study of lateral shipments in single supplier, multiple buyers supply chain networks," International Journal of Production Economics, Elsevier, vol. 81(1), pages 103-114, January.
    13. Xu, Kefeng & Evers, Philip T. & Fu, Michael C., 2003. "Estimating customer service in a two-location continuous review inventory model with emergency transshipments," European Journal of Operational Research, Elsevier, vol. 145(3), pages 569-584, March.
    14. Axsater, Sven, 2003. "Evaluation of unidirectional lateral transshipments and substitutions in inventory systems," European Journal of Operational Research, Elsevier, vol. 149(2), pages 438-447, September.
    15. Satır, Benhür & Savasaneril, Secil & Serin, Yasemin, 2012. "Pooling through lateral transshipments in service parts systems," European Journal of Operational Research, Elsevier, vol. 220(2), pages 370-377.
    16. H Wong & G J van Houtum & D Cattrysse & D Van Oudheusden, 2005. "Simple, efficient heuristics for multi-item multi-location spare parts systems with lateral transshipments and waiting time constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(12), pages 1419-1430, December.
    17. Özdemir, Deniz & Yücesan, Enver & Herer, Yale T., 2013. "Multi-location transshipment problem with capacitated production," European Journal of Operational Research, Elsevier, vol. 226(3), pages 425-435.
    18. Burton, Jonathan & Banerjee, Avijit, 2005. "Cost-parametric analysis of lateral transshipment policies in two-echelon supply chains," International Journal of Production Economics, Elsevier, vol. 93(1), pages 169-178, January.
    19. van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2019. "Optimal lateral transshipment policies for a two location inventory problem with multiple demand classes," European Journal of Operational Research, Elsevier, vol. 272(2), pages 481-495.
    20. De‐bi Cao & Edward A. Silver, 2005. "A dynamic allocation heuristic for centralized safety stock," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 513-526, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:148:y:2003:i:2:p:384-400. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.