IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v168y2006i3p694-715.html
   My bibliography  Save this article

A survey on problems and methods in generalized assembly line balancing

Author

Listed:
  • Becker, Christian
  • Scholl, Armin

Abstract

No abstract is available for this item.

Suggested Citation

  • Becker, Christian & Scholl, Armin, 2006. "A survey on problems and methods in generalized assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
  • Handle: RePEc:eee:ejores:v:168:y:2006:i:3:p:694-715
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(04)00480-1
    Download Restriction: Full text for ScienceDirect subscribers only

    As the access to this document is restricted, you may want to look for a different version below or search for a different version of it.

    Other versions of this item:

    References listed on IDEAS

    as
    1. Anulark Pinnoi & Wilbert E. Wilhelm, 1998. "Assembly System Design: A Branch and Cut Approach," Management Science, INFORMS, vol. 44(1), pages 103-118, January.
    2. Scholl, Armin & Becker, Christian, 2005. "A note on "An exact method for cost-oriented assembly line balancing"," International Journal of Production Economics, Elsevier, vol. 97(3), pages 343-352, September.
    3. Thomas R. Hoffmann, 1963. "Assembly Line Balancing with a Precedence Matrix," Management Science, INFORMS, vol. 9(4), pages 551-562, July.
    4. Karabati, Selcuk & Sayin, Serpil, 2003. "Assembly line balancing in a mixed-model sequencing environment with synchronous transfers," European Journal of Operational Research, Elsevier, vol. 149(2), pages 417-429, September.
    5. Erel, Erdal & Gokcen, Hadi, 1999. "Shortest-route formulation of mixed-model assembly line balancing problem," European Journal of Operational Research, Elsevier, vol. 116(1), pages 194-204, July.
    6. Miltenburg, John, 1998. "Balancing U-lines in a multiple U-line facility," European Journal of Operational Research, Elsevier, vol. 109(1), pages 1-23, August.
    7. Dobson, Gregory & Arai Yano, Candace, 1994. "Cyclic scheduling to minimize inventory in a batch flow line," European Journal of Operational Research, Elsevier, vol. 75(2), pages 441-461, June.
    8. Scholl, Armin & Klein, & Domschke, Wolfgang, 1998. "Pattern based vocabulary building for effectively sequencing mixed model assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 9365, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    9. Amen, Matthias, 2000. "An exact method for cost-oriented assembly line balancing," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 187-195, March.
    10. Amiya K. Chakravarty & Avraham Shtub, 1985. "Balancing Mixed Model Lines with In-Process Inventories," Management Science, INFORMS, vol. 31(9), pages 1161-1174, September.
    11. Amen, Matthias, 2000. "Heuristic methods for cost-oriented assembly line balancing: A survey," International Journal of Production Economics, Elsevier, vol. 68(1), pages 1-14, October.
    12. Lutz, CM & Davis, KR & Turner III, CF, 1994. "Development of operator assignment schedules: A DSS approach," Omega, Elsevier, vol. 22(1), pages 57-67, January.
    13. Sarin, Subhash C. & Erel, Erdal & Dar-El, Ezey M., 1999. "A methodology for solving single-model, stochastic assembly line balancing problem," Omega, Elsevier, vol. 27(5), pages 525-535, October.
    14. Bukchin, Joseph & Masin, Michael, 2004. "Multi-objective design of team oriented assembly systems," European Journal of Operational Research, Elsevier, vol. 156(2), pages 326-352, July.
    15. Peter A. Pinto & David G. Dannenbring & Basheer M. Khumawala, 1983. "Assembly Line Balancing with Processing Alternatives: An Application," Management Science, INFORMS, vol. 29(7), pages 817-830, July.
    16. Nick T. Thomopoulos, 1970. "Mixed Model Line Balancing with Smoothed Station Assignments," Management Science, INFORMS, vol. 16(9), pages 593-603, May.
    17. Roger V. Johnson, 1983. "A Branch and Bound Algorithm for Assembly Line Balancing Problems with Formulation Irregularities," Management Science, INFORMS, vol. 29(11), pages 1309-1324, November.
    18. Frederick S. Hillier & Kut C. So & Ronald W. Boling, 1993. "Notes: Toward Characterizing the Optimal Allocation of Storage Space in Production Line Systems with Variable Processing Times," Management Science, INFORMS, vol. 39(1), pages 126-133, January.
    19. Decker, Maria, 1993. "Capacity smoothing and sequencing for mixed-model lines," International Journal of Production Economics, Elsevier, vol. 30(1), pages 31-42, July.
    20. Chakravarty, Amiya K. & Shtub, Avraham, 1986. "A cost minimization procedure for mixed model production lines with normally distributed task times," European Journal of Operational Research, Elsevier, vol. 23(1), pages 25-36, January.
    21. van Zante-de Fokkert, Jannet I. & de Kok, Ton G., 1997. "The mixed and multi model line balancing problem: a comparison," European Journal of Operational Research, Elsevier, vol. 100(3), pages 399-412, August.
    22. Scholl, Armin, 1995. "Balancing and sequencing of assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 9690, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    23. Reza H. Ahmadi & Sriram Dasu & Christopher S. Tang, 1992. "The Dynamic Line Allocation Problem," Management Science, INFORMS, vol. 38(9), pages 1341-1353, September.
    24. G. J. Miltenburg & J. Wijngaard, 1994. "The U-line Line Balancing Problem," Management Science, INFORMS, vol. 40(10), pages 1378-1388, October.
    25. Scholl, Armin & Klein, Robert, 1997. "SALOME. a bidirectional branch and bound procedure for assembly line balancing," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 7890, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    26. Domschke, Wolfgang & Scholl, Armin & Voß, S., 1997. "Produktionsplanung: ablauforganisatorische Aspekte. 2. Aufl," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 619, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    27. Amen, Matthias, 2001. "Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time," International Journal of Production Economics, Elsevier, vol. 69(3), pages 255-264, February.
    28. Bukchin, Joseph & Darel, Ezey & Rubinovitz, Jacob, 1997. "Team-oriented assembly system design: A new approach," International Journal of Production Economics, Elsevier, vol. 51(1-2), pages 47-57, August.
    29. Fred N. Silverman & John C. Carter, 1986. "A Cost-Based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages," Management Science, INFORMS, vol. 32(4), pages 455-463, April.
    30. McMullen, Patrick R. & Frazier, Gregory V., 1997. "A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations," International Journal of Production Economics, Elsevier, vol. 51(3), pages 177-190, September.
    31. Robert L. Carraway, 1989. "A Dynamic Programming Approach to Stochastic Assembly Line Balancing," Management Science, INFORMS, vol. 35(4), pages 459-471, April.
    32. G. M. Buxey, 1974. "Assembly Line Balancing with Multiple Stations," Management Science, INFORMS, vol. 20(6), pages 1010-1021, February.
    33. Moshe Sniedovich, 1981. "Analysis of a Preference Order Assembly Line Problem," Management Science, INFORMS, vol. 27(9), pages 1067-1080, September.
    34. M. Kilbridge & L. Wester, 1961. "The Balance Delay Problem," Management Science, INFORMS, vol. 8(1), pages 69-84, October.
    35. Gokcen, Hadi & Faruk Baykoc, O., 1999. "A new line remedial policy for the paced lines with stochastic task times," International Journal of Production Economics, Elsevier, vol. 58(2), pages 191-197, January.
    Full references (including those not matched with items on IDEAS)

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:168:y:2006:i:3:p:694-715. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Dana Niculescu). General contact details of provider: http://www.elsevier.com/locate/eor .

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service hosted by the Research Division of the Federal Reserve Bank of St. Louis . RePEc uses bibliographic data supplied by the respective publishers.