IDEAS home Printed from https://ideas.repec.org/p/ems/eureir/114971.html
   My bibliography  Save this paper

Reducing Passenger Delays by Rolling Stock Rescheduling

Author

Listed:
  • Hoogervorst, R.
  • Dollevoet, T.A.B.
  • Maróti, G.
  • Huisman, D.

Abstract

Delays are a major nuisance to railway passengers. The extent to which a delay propagates, and thus affects the passengers, is influenced by the assignment of rolling stock. We propose to reschedule the rolling stock in such a way that the passenger delay is minimized and such that objectives on passenger comfort and operational efficiency are taken into account. We refer to this problem as the Passenger Delay Reduction Problem (PDRP). We propose two models for this problem, which are based on two dominant streams of literature for the traditional Rolling Stock Rescheduling Problem. The first model is an arc formulation of the problem, while the second model is a path formulation. We test the effectiveness of these models on instances of Netherlands Railways (NS). The results show that the rescheduling of rolling stock can significantly decrease the passenger delays in the system. Especially allowing flexibility in the assignment of rolling stock at terminal stations turns out to be effective in reducing the delays. Moreover, we show that the arc formulation based model performs best in finding high-quality solutions within the limited time that is available in the rescheduling phase.

Suggested Citation

  • Hoogervorst, R. & Dollevoet, T.A.B. & Maróti, G. & Huisman, D., 2018. "Reducing Passenger Delays by Rolling Stock Rescheduling," Econometric Institute Research Papers EI2018-29, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  • Handle: RePEc:ems:eureir:114971
    as

    Download full text from publisher

    File URL: https://repub.eur.nl/pub/114971/Repub_114971.pdf
    Download Restriction: no
    ---><---

    Other versions of this item:

    References listed on IDEAS

    as
    1. Lusby, Richard M. & Haahr, Jørgen Thorlund & Larsen, Jesper & Pisinger, David, 2017. "A Branch-and-Price algorithm for railway rolling stock rescheduling," Transportation Research Part B: Methodological, Elsevier, vol. 99(C), pages 228-250.
    2. Arianna Alfieri & Rutger Groot & Leo Kroon & Alexander Schrijver, 2006. "Efficient Circulation of Railway Rolling Stock," Transportation Science, INFORMS, vol. 40(3), pages 378-391, August.
    3. Dollevoet, T.A.B. & Huisman, D. & Kroon, L.G. & Veelenturf, L.P. & Wagenaar, J.C., 2015. "An Iterative Framework for Real-time Railway Rescheduling," Econometric Institute Research Papers EI2015-28, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    4. Nielsen, L.K. & Maróti, G., 2009. "Disruption Management of Rolling Stock in Passenger Railway Transportation," ERIM Report Series Research in Management ERS-2009-046-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    5. Jespersen-Groth, J. & Potthoff, D. & Clausen, J. & Huisman, D. & Kroon, L.G. & Maróti, G. & Nielsen, M.N., 2007. "Disruption management in passenger railway transportation," Econometric Institute Research Papers EI 2007-05, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    6. Ralf Borndörfer & Markus Reuther & Thomas Schlechte & Kerstin Waas & Steffen Weider, 2016. "Integrated Optimization of Rolling Stock Rotations for Intercity Railways," Transportation Science, INFORMS, vol. 50(3), pages 863-877, August.
    7. Lucas P. Veelenturf & Martin P. Kidd & Valentina Cacchiani & Leo G. Kroon & Paolo Toth, 2016. "A Railway Timetable Rescheduling Approach for Handling Large-Scale Disruptions," Transportation Science, INFORMS, vol. 50(3), pages 841-862, August.
    8. Nejib Ben-Khedher & Josephine Kintanar & Cecile Queille & William Stripling, 1998. "Schedule Optimization at SNCF: From Conception to Day of Departure," Interfaces, INFORMS, vol. 28(1), pages 6-23, February.
    9. Fioole, Pieter-Jan & Kroon, Leo & Maroti, Gabor & Schrijver, Alexander, 2006. "A rolling stock circulation model for combining and splitting of passenger trains," European Journal of Operational Research, Elsevier, vol. 174(2), pages 1281-1297, October.
    10. Erwin Abbink & Bianca van den Berg & Leo Kroon & Marc Salomon, 2004. "Allocation of Railway Rolling Stock for Passenger Trains," Transportation Science, INFORMS, vol. 38(1), pages 33-41, February.
    11. Kroon, L.G. & Huisman, D., 2009. "Algorithmic Support for Railway Disruption Management," Econometric Institute Research Papers EI 2009-50, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    12. Cynthia Barnhart & Ellis L. Johnson & George L. Nemhauser & Martin W. P. Savelsbergh & Pamela H. Vance, 1998. "Branch-and-Price: Column Generation for Solving Huge Integer Programs," Operations Research, INFORMS, vol. 46(3), pages 316-329, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lusby, Richard M. & Haahr, Jørgen Thorlund & Larsen, Jesper & Pisinger, David, 2017. "A Branch-and-Price algorithm for railway rolling stock rescheduling," Transportation Research Part B: Methodological, Elsevier, vol. 99(C), pages 228-250.
    2. Lin, Boliang & Zhao, Yinan, 2021. "Synchronized optimization of EMU train assignment and second-level preventive maintenance scheduling," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    3. Zhong, Qingwei & Lusby, Richard M. & Larsen, Jesper & Zhang, Yongxiang & Peng, Qiyuan, 2019. "Rolling stock scheduling with maintenance requirements at the Chinese High-Speed Railway," Transportation Research Part B: Methodological, Elsevier, vol. 126(C), pages 24-44.
    4. Wang, Yihui & Zhao, Kangqi & D’Ariano, Andrea & Niu, Ru & Li, Shukai & Luan, Xiaojie, 2021. "Real-time integrated train rescheduling and rolling stock circulation planning for a metro line under disruptions," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 87-117.
    5. Haahr, J.T. & Wagenaar, J.C. & Veelenturf, L.P. & Kroon, L.G., 2015. "A Comparison of Two Exact Methods for Passenger Railway Rolling Stock (Re)Scheduling," ERIM Report Series Research in Management ERS-2015-007-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    6. Nielsen, Lars Kjær & Kroon, Leo & Maróti, Gábor, 2012. "A rolling horizon approach for disruption management of railway rolling stock," European Journal of Operational Research, Elsevier, vol. 220(2), pages 496-509.
    7. Valentina Cacchiani & Alberto Caprara & Paolo Toth, 2019. "An Effective Peak Period Heuristic for Railway Rolling Stock Planning," Transportation Science, INFORMS, vol. 53(3), pages 746-762, May.
    8. Gao, Yuan & Schmidt, Marie & Yang, Lixing & Gao, Ziyou, 2020. "A branch-and-price approach for trip sequence planning of high-speed train units," Omega, Elsevier, vol. 92(C).
    9. Lusby, Richard M. & Larsen, Jesper & Bull, Simon, 2018. "A survey on robustness in railway planning," European Journal of Operational Research, Elsevier, vol. 266(1), pages 1-15.
    10. Hoogervorst, R. & Dollevoet, T.A.B. & Maróti, G. & Huisman, D., 2019. "A Variable Neighborhood Search Heuristic for Rolling Stock Rescheduling," Econometric Institute Research Papers EI2019-34, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    11. Canca, David & Barrena, Eva, 2018. "The integrated rolling stock circulation and depot location problem in railway rapid transit systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 109(C), pages 115-138.
    12. Lin, Zhiyuan & Kwan, Raymond S.K., 2016. "A branch-and-price approach for solving the train unit scheduling problem," Transportation Research Part B: Methodological, Elsevier, vol. 94(C), pages 97-120.
    13. Xueqiao Yu & Maoxiang Lang & Wenhui Zhang & Shiqi Li & Mingyue Zhang & Xiao Yu, 2019. "An Empirical Study on the Comprehensive Optimization Method of a Train Diagram of the China High Speed Railway Express," Sustainability, MDPI, vol. 11(7), pages 1-30, April.
    14. Yu Zhou & Leishan Zhou & Yun Wang & Zhuo Yang & Jiawei Wu, 2017. "Application of Multiple-Population Genetic Algorithm in Optimizing the Train-Set Circulation Plan Problem," Complexity, Hindawi, vol. 2017, pages 1-14, July.
    15. Wenliang Zhou & Mehdi Oldache, 2021. "Integrated Optimization of Line Planning, Timetabling and Rolling Stock Allocation for Urban Railway Lines," Sustainability, MDPI, vol. 13(23), pages 1-32, November.
    16. Jian Gang Jin & Kwong Meng Teo & Amedeo R. Odoni, 2016. "Optimizing Bus Bridging Services in Response to Disruptions of Urban Transit Rail Networks," Transportation Science, INFORMS, vol. 50(3), pages 790-804, August.
    17. Luis Cadarso & Ángel Marín, 2012. "Integration of timetable planning and rolling stock in rapid transit networks," Annals of Operations Research, Springer, vol. 199(1), pages 113-135, October.
    18. Yu Zhou & Leishan Zhou & Yun Wang & Xiaomeng Li & Zhuo Yang, 2017. "A practical model for the train-set utilization: The case of Beijing-Tianjin passenger dedicated line in China," PLOS ONE, Public Library of Science, vol. 12(5), pages 1-24, May.
    19. Gao, Yuan & Xia, Jun & D’Ariano, Andrea & Yang, Lixing, 2022. "Weekly rolling stock planning in Chinese high-speed rail networks," Transportation Research Part B: Methodological, Elsevier, vol. 158(C), pages 295-322.
    20. Haahr, Jørgen T. & Wagenaar, Joris C. & Veelenturf, Lucas P. & Kroon, Leo G., 2016. "A comparison of two exact methods for passenger railway rolling stock (re)scheduling," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 91(C), pages 15-32.

    More about this item

    Keywords

    Rolling Stock Rescheduling; Disruption Management; Railway Optimization; Column Generation;
    All these keywords.

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ems:eureir:114971. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: RePub (email available below). General contact details of provider: https://edirc.repec.org/data/feeurnl.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.