IDEAS home Printed from https://ideas.repec.org/p/ems/eureir/78719.html
   My bibliography  Save this paper

An Iterative Framework for Real-time Railway Rescheduling

Author

Listed:
  • Dollevoet, T.A.B.
  • Huisman, D.
  • Kroon, L.G.
  • Veelenturf, L.P.
  • Wagenaar, J.C.

Abstract

Since disruptions in railway networks are inevitable, railway operators and infrastructure managers need reliable measures and tools for disruption management. Current literature on railway disruption management focuses most of the time on rescheduling one resource (timetable, rolling stock or crew) at the time. In this research, we describe an iterative framework in which all three resources are considered. The framework applies existing models and algorithms for rescheduling the individual resources. We extensively test our framework on instances from Netherlands Railways and show that schedules which are feasible for all three resources can be obtained within short computation times. This shows that the framework and the existing rescheduling approaches can be of great value in practice.

Suggested Citation

  • Dollevoet, T.A.B. & Huisman, D. & Kroon, L.G. & Veelenturf, L.P. & Wagenaar, J.C., 2015. "An Iterative Framework for Real-time Railway Rescheduling," Econometric Institute Research Papers EI2015-28, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  • Handle: RePEc:ems:eureir:78719
    as

    Download full text from publisher

    File URL: https://repub.eur.nl/pub/78719/EI2015-28.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Potthoff, D. & Huisman, D. & Desaulniers, G., 2008. "Column generation with dynamic duty selection for railway crew rescheduling," Econometric Institute Research Papers EI 2008-28, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. Nielsen, Lars Kjær & Kroon, Leo & Maróti, Gábor, 2012. "A rolling horizon approach for disruption management of railway rolling stock," European Journal of Operational Research, Elsevier, vol. 220(2), pages 496-509.
    3. Daniel Potthoff & Dennis Huisman & Guy Desaulniers, 2010. "Column Generation with Dynamic Duty Selection for Railway Crew Rescheduling," Transportation Science, INFORMS, vol. 44(4), pages 493-505, November.
    4. Fioole, Pieter-Jan & Kroon, Leo & Maroti, Gabor & Schrijver, Alexander, 2006. "A rolling stock circulation model for combining and splitting of passenger trains," European Journal of Operational Research, Elsevier, vol. 174(2), pages 1281-1297, October.
    5. Cadarso, Luis & Marín, Ángel & Maróti, Gábor, 2013. "Recovery of disruptions in rapid transit networks," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 15-33.
    6. D'Ariano, Andrea & Pacciarelli, Dario & Pranzo, Marco, 2007. "A branch and bound algorithm for scheduling trains in a railway network," European Journal of Operational Research, Elsevier, vol. 183(2), pages 643-657, December.
    7. Veelenturf, L.P. & Potthoff, D. & Huisman, D. & Kroon, L.G., 2009. "Railway Crew Rescheduling with Retiming," Econometric Institute Research Papers EI 2009-24, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    8. Zhan, Shuguang & Kroon, Leo G. & Veelenturf, Lucas P. & Wagenaar, Joris C., 2015. "Real-time high-speed train rescheduling in case of a complete blockage," Transportation Research Part B: Methodological, Elsevier, vol. 78(C), pages 182-201.
    9. Leonardo Lamorgese & Carlo Mannino, 2015. "An Exact Decomposition Approach for the Real-Time Train Dispatching Problem," Operations Research, INFORMS, vol. 63(1), pages 48-64, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hoogervorst, R. & Dollevoet, T.A.B. & Maróti, G. & Huisman, D., 2018. "Reducing Passenger Delays by Rolling Stock Rescheduling," Econometric Institute Research Papers EI2018-29, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. Biao Yuan & Zhibin Jiang, 2017. "Disruption Management for the Real-Time Home Caregiver Scheduling and Routing Problem," Sustainability, MDPI, vol. 9(12), pages 1-15, November.
    3. Dekker, M.M. & van Lieshout, R.N. & Ball, R.C. & Bouman, P.C. & Dekker, S.C. & Dijkstra, H.A. & Goverde, R.M.P. & Huisman, D. & Panja, D. & Schaafsma, A.M. & van den Akker, M., 2018. "A Next Step in Disruption Management: Combining Operations Research and Complexity Science," Econometric Institute Research Papers EI2018-25, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dekker, M.M. & van Lieshout, R.N. & Ball, R.C. & Bouman, P.C. & Dekker, S.C. & Dijkstra, H.A. & Goverde, R.M.P. & Huisman, D. & Panja, D. & Schaafsma, A.M. & van den Akker, M., 2018. "A Next Step in Disruption Management: Combining Operations Research and Complexity Science," Econometric Institute Research Papers EI2018-25, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. Chang Han & Leishan Zhou & Bin Guo & Yixiang Yue & Wenqiang Zhao & Zeyu Wang & Hanxiao Zhou, 2023. "An Integrated Strategy for Rescheduling High-Speed Train Operation under Single-Direction Disruption," Sustainability, MDPI, vol. 15(17), pages 1-31, August.
    3. Lusby, Richard M. & Haahr, Jørgen Thorlund & Larsen, Jesper & Pisinger, David, 2017. "A Branch-and-Price algorithm for railway rolling stock rescheduling," Transportation Research Part B: Methodological, Elsevier, vol. 99(C), pages 228-250.
    4. Kroon, L.G. & Huisman, D., 2011. "Algorithmic Support for Disruption Management at Netherlands Railways," Econometric Institute Research Papers EI 2011-06, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    5. Zhang, Chuntian & Gao, Yuan & Cacchiani, Valentina & Yang, Lixing & Gao, Ziyou, 2023. "Train rescheduling for large-scale disruptions in a large-scale railway network," Transportation Research Part B: Methodological, Elsevier, vol. 174(C).
    6. Mark M. Dekker & Rolf N. Lieshout & Robin C. Ball & Paul C. Bouman & Stefan C. Dekker & Henk A. Dijkstra & Rob M. P. Goverde & Dennis Huisman & Debabrata Panja & Alfons A. M. Schaafsma & Marjan Akker, 2022. "A next step in disruption management: combining operations research and complexity science," Public Transport, Springer, vol. 14(1), pages 5-26, March.
    7. Leo Kroon & Gábor Maróti & Lars Nielsen, 2015. "Rescheduling of Railway Rolling Stock with Dynamic Passenger Flows," Transportation Science, INFORMS, vol. 49(2), pages 165-184, May.
    8. van Lieshout, R.N. & Mulder, J. & Huisman, D., 2016. "The Vehicle Rescheduling Problem with Retiming," Econometric Institute Research Papers EI2016-37, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    9. Zhan, Shuguang & Wong, S.C. & Shang, Pan & Peng, Qiyuan & Xie, Jiemin & Lo, S.M., 2021. "Integrated railway timetable rescheduling and dynamic passenger routing during a complete blockage," Transportation Research Part B: Methodological, Elsevier, vol. 143(C), pages 86-123.
    10. Wang, Yihui & Tang, Tao & Ning, Bin & Meng, Lingyun, 2017. "Integrated optimization of regular train schedule and train circulation plan for urban rail transit lines," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 105(C), pages 83-104.
    11. Xu, Peijuan & Corman, Francesco & Peng, Qiyuan & Luan, Xiaojie, 2017. "A train rescheduling model integrating speed management during disruptions of high-speed traffic under a quasi-moving block system," Transportation Research Part B: Methodological, Elsevier, vol. 104(C), pages 638-666.
    12. Zhu, Yongqiu & Goverde, Rob M.P., 2019. "Railway timetable rescheduling with flexible stopping and flexible short-turning during disruptions," Transportation Research Part B: Methodological, Elsevier, vol. 123(C), pages 149-181.
    13. Bach, L. & Dollevoet, T.A.B. & Huisman, D., 2014. "Integrating Timetabling and Crew," Econometric Institute Research Papers EI 2014-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    14. Qi, Jianguo & Yang, Lixing & Di, Zhen & Li, Shukai & Yang, Kai & Gao, Yuan, 2018. "Integrated optimization for train operation zone and stop plan with passenger distributions," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 109(C), pages 151-173.
    15. Lukas Bach & Twan Dollevoet & Dennis Huisman, 2016. "Integrating Timetabling and Crew Scheduling at a Freight Railway Operator," Transportation Science, INFORMS, vol. 50(3), pages 878-891, August.
    16. Nielsen, Lars Kjær & Kroon, Leo & Maróti, Gábor, 2012. "A rolling horizon approach for disruption management of railway rolling stock," European Journal of Operational Research, Elsevier, vol. 220(2), pages 496-509.
    17. Kroon, L.G. & Huisman, D., 2009. "Algorithmic Support for Railway Disruption Management," Econometric Institute Research Papers EI 2009-50, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    18. Evelien van der Hurk & Haris N. Koutsopoulos & Nigel Wilson & Leo G. Kroon & Gábor Maróti, 2016. "Shuttle Planning for Link Closures in Urban Public Transport Networks," Transportation Science, INFORMS, vol. 50(3), pages 947-965, August.
    19. Luan, Xiaojie & De Schutter, Bart & Meng, Lingyun & Corman, Francesco, 2020. "Decomposition and distributed optimization of real-time traffic management for large-scale railway networks," Transportation Research Part B: Methodological, Elsevier, vol. 141(C), pages 72-97.
    20. Wang, Yihui & Zhao, Kangqi & D’Ariano, Andrea & Niu, Ru & Li, Shukai & Luan, Xiaojie, 2021. "Real-time integrated train rescheduling and rolling stock circulation planning for a metro line under disruptions," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 87-117.

    More about this item

    Keywords

    Railway Operations; Disruption Management; Algorithmic Framework;
    All these keywords.

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ems:eureir:78719. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: RePub (email available below). General contact details of provider: https://edirc.repec.org/data/feeurnl.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.